Loading...
HomeSearchMy WebLinkAboutAppendix A - Summary of Environmental M itigation MeasuresAppendix B - Newport Beach Fire DepartmentAppendix C - Green Building ProgramAppendix D - Harbor Cove Community HOA MeetingAppendix E - Sea Island Community HOAAppendix F - Construction Traffic Impact AnalysisAppendix G - Revised Traffic Impact Analysis ReportFigure 1 - Imaginary Surface AnalysisFigure 10 - Earthwork Cut Fill MapFigure 11 - Parking PlanFigure 12 - Visual Simulation 2Figure 13 - Visual Simulation 3Figure 14 - Site SelectionsFigure 15 - Existing Building SetbacksFigure 16 - Visual Simulations from Newport DunesFigure 17 - Land Use MapFigure 18 - Subwatersheds and Monitoring LocationsFigure 19 - Newport Bay WatershedFigure 2 - Vegetation and Fuel ModificationFigure 20 - Flood Insurance Rate MapFigure 21 - Existing HydrologyFigure 22 - Proposed HydrologyFigure 2a - Vegetation and Fuel Modification-Planet PaetteFigure 3 - Lighting PlanFigure 4 - Parking Structure ElevationsFigure 5 - Construction Traffic AccessFigure 6 - Proposed Strom Water BMPsFigure 7 - Ballroom ElevationsFigure 8 - Landscape PlanFigure 9 - Hyatt Site Plan_Grading PlanIntroductionResponse to Comments_Part_1Response to Comments_Part_2Response to Comments_Part_3Revisions to the Draft EIRTable of Contents