Loading...
HomeSearchMy WebLinkAboutappendix a - summary of environmental m itigation measuresappendix b - newport beach fire departmentappendix c - green building programappendix d - harbor cove community hoa meetingappendix e - sea island community hoaappendix f - construction traffic impact analysisappendix g - revised traffic impact analysis reportfigure 1 - imaginary surface analysisfigure 10 - earthwork cut fill mapfigure 11 - parking planfigure 12 - visual simulation 2figure 13 - visual simulation 3figure 14 - site selectionsfigure 15 - existing building setbacksfigure 16 - visual simulations from newport dunesfigure 17 - land use mapfigure 18 - subwatersheds and monitoring locationsfigure 19 - newport bay watershedfigure 2 - vegetation and fuel modificationfigure 20 - flood insurance rate mapfigure 21 - existing hydrologyfigure 22 - proposed hydrologyfigure 2a - vegetation and fuel modification-planet paettefigure 3 - lighting planfigure 4 - parking structure elevationsfigure 5 - construction traffic accessfigure 6 - proposed strom water bmpsfigure 7 - ballroom elevationsfigure 8 - landscape planfigure 9 - hyatt site plan_grading planintroductionresponse to comments_part_1response to comments_part_2response to comments_part_3revisions to the draft eirtable of contents