Loading...
HomeMy WebLinkAbout07 - Mesa-Birch Park ProjectCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. _7 September 8, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Fong Tse 949 - 644 -3321 or ftse @newportbeachca.gov SUBJECT: MESA -BIRCH PARK — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3787 Recommendations: 1. Accept the completed work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond 1 year after Council acceptance. Discussion: On October 9, 2007, the City Council awarded the Mesa -Birch Park Project to the low bidder Belaire -West Landscape, Inc. (BWL) to grade the existing site; construct loop concrete walks; install pre- fabricated concrete benches and seats, park lights, landscaping, irrigation system, low perimeter fences, and a water fountain; and refinish the existing park identification monument sign. The bid amount submitted by the second low bidder was $1,800 higher. BWL's inability to follow staff instructions to complete the weed abatement and concrete walkway work tasks; and, BWL's extended unexcused absences prolonged work completion. Staff concurred with the County of Orange, which funded the project, that the delayed work completion was unacceptable and should be handled in accordance with the contract provisions. Accordingly, staff met with BWL and negotiated a negative contract change order that included the 122 calendar days delayed work performance, as detailed below: Mesa -Birch Park - Completion and Acceptance of Contract No. 3787 September 8, 2009 Page 2 Work Changes Description .Amount 1 Delayed completion. - $30,500.00 2 Exposed aggregate finish for picnic table pads. $ 2,000.00 3 Substitutespecified street lights with bollard lights. $ 4,320.00 4 Patterned concrete pads for bollard lights. $ 1,600.00 5 Relocate backflow preventer as required by IRWD. $ 880.00 6 Rework and install additional monument sign letters. $ 2,200.00 7 Additional landscaping. $ 1,500.00 8 Additional grading due to changed field conditions. $ 3,000.00 Total Project Changes - $15,000.00 Excluding the $30,500 deductive charge for delayed completion, the actual additional work performed by BWL was $15,500 or 4.3% above the original bid. The contract has now been completed. A summary of the contract cost is as follows: Original bid amount: $357,000.00 Actual amount of bid items constructed: $357,000.00 Total amount of change order: -$ 15,000.00 Final contract cost with BWL: $342,000.00 During the course of construction, the Santa Ana Heights residents requested to have the newly installed pilaster caps replaced with units identical to those at the Santa Ana Heights Fire Station. Since BWL was unresponsive, staff requested Nile Advanced Construction, the contractor that constructed the new Mariners Park Restroom, to perform the replacement work. Nile Advanced Construction completed the pilaster caps replacement work over one weekend day for $9,655.43 for both labor and materials. The total construction cost on this project, as constructed by both contractors, is $351,655.43. The following is a summary of the project schedule per the Fiscal Year 2008 -2009 Master Project Schedule. Schedule Summary Estimated completion date per June 2008 Schedule: February 27,2009 Project award for construction: October 9, 2007 Estimated completion date at Award: August 25, 2008 Actual construction completion date: January 29, 2009 Environmental Review: The project is Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This Mesa -Birch Park - Completion and Acceptance of Contract No. 3787 September 8, 2009 Page 3 exemption covers the repair, maintenance and minor alteration of existing public facilities in areas that are not environmentally sensitive. Funding Availability: In addition to the primary construction contract, this project involved other project expenses. Total project expenses are summarized as follows: Construction $342,000.00 Supplemental Construction: 9,655.43 Landscape Design 23,729.00 Construction Inspection 12,564.38 Water Service Design 800.00 Graphics 545.12 Printing and Incidentals: 1.345.12 Total Project Cost: $390,639.05 Funds for the construction project were expended from the following account: Account Description Account Number Amount County of Orange - RDA Fund 7459- C5100867 $342.000.00 Submitted by: Civil Engineer _F16blic Works Director