HomeMy WebLinkAbout08 - On-Call Underground Utility RepairsCITY OF NEWPORT BEACH
CITY COUNCIL STAFF REPORT
Agenda Item No. 8
September 8, 2009
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Utilities Department
Cindy Asher, Administrative Manager
949 - 644 -3010 or casher(aDnewportbeachca.gov
SUBJECT: APPROVAL OF AMENDMENT NO. 3 TO PROFESSIONAL SERVICES
AGREEMENT WITH DOTY BROS. CONSTRUCTION COMPANY,
APPROVAL OF AMENDMENT NO. 3 WITH GCI CONSTRUCTION, INC.
AND APPROVAL OF AMENDMENT NO. 2 WITH VALVERDE
CONSTRUCTION, INC. FOR ON -CALL UNDERGROUND UTILITY
REPAIRS
RECOMMENDATIONS:
1. Approve Amendment No. 3 to Professional Services Agreement (PSA) with Doty Bros.
Construction Company (DBCC) for on -call underground utility repair services and authorize the
Mayor and City Clerk to execute the Amendment.
2. Approve Amendment No. 3 to Professional Services Agreement (PSA) with GCI
Construction, Inc. (GCI) for on -call underground utility repair services and authorize the Mayor
and City Clerk to execute the Amendment.
3. Approve Amendment No. 2 to Professional Services Agreement (PSA) with Valverde
Construction, Inc. (VCI) for on -call underground utility repair services and authorize the Mayor
and City Clerk to execute the Amendment.
DISCUSSION:
On September 11, 2007, the City Council approved a PSA with Doty Bros Construction
Company on September 12, 2006 with GCI Construction, Inc. and on November 13, 2007 with
Valverde Construction, Inc. to provide emergency and as needed on -call underground utility
repair services. The proposed revisions to each PSA are summarized below:
1) Amendment No. 3 to the PSA with DBCC incorporates a revised labor rate billing
sheet which reflects between a 1% and 6% increase, with the average increase at
2.6 %. Due to DBCC being a union shop, new rates are negotiated every July.
There are no cost increases for equipment.
Underground Utility Repair Services — Approval of Amendments
On -Call Professional Services Agreements
September 8, 2009
Page 2
In February 2008, DBCC made emergency repairs to a 30" steel reclaimed water
main located at University Avenue and the 73 Toll Road. The City was reimbursed
for this repair by Orange County Water District.
2) Amendment No. 3 to the PSA with GCI incorporates a revised labor rate billing sheet
that reflects a decrease in all labor categories except the Foreman category which
averaged a 3.7% increase. According to GCI, the decrease is due to their workers'
compensation rates. The revised equipment rates increased 3.4% to 14.5 %, with
one piece of equipment increasing by 26.6% and another decreasing by 39 %. Many
equipment pieces had no increase.
GCI assisted the City in making some emergency repairs to a vault at Pacific Coast
Highway and Dover. GCI also assisted with manholes at the Big Canyon Golf
Course last fall.
3) Amendment No. 2 to the PSA with VCI incorporates a revised labor rate billing sheet
that reflects increases in rates ranging from 1.7% to 3.9 %. For equipment, the
increase in rates ranged from no increases to 14.7% on one piece of equipment.
VCI has not had the opportunity thus far to assist the City on any emergency
underground utility repairs.
The scope of work for the amended on -call PSAs include the following services: general
underground utility installation and repair, installing and repairing sewer laterals and mains;
installing and repairing water services including system appurtenances, street repairs, and
grading improvements.
The proposed on -Call PSAs for all three companies would be effective for a one year period
through June 30, 2010. Please see the attached Rate Comparison Tables.
Environmental Review:
This action requires no environmental review, as it is not a project pursuant to CEQA.
Funding Availability:
Funding is available in various maintenance and operations water and wastewater accounts.
Prepared by
Cindy Asher
Administrative -Manager
Submitted by:
e g Muv och
Utilities Director
Attachments: Amendment No. 3 with Doty Bros. Construction Company
Amendment No. 3 with GCI Construction, Inc.
Amendment No. 2 with Valverde Construction, Inc.
Rate Comparison Tables
AMENDMENT NO. 3
TO
PROFESSIONAL SERVICES AGREEMENT WITH
DOTY BROS. CONSTRUCTION COMPANY
FOR ON -CALL UNDERGROUND UTILITY REPAIR SERVICES
THIS AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT, is
entered into as of this 8t" day of September, 2009, by and between the CITY OF
NEWPORT BEACH, a Municipal Corporation ( "CITY "), and DOTY .BROS.
CONSTRUCTION COMPANY, a California Corporation whose address is 11232 E.
Firestone Blvd., Norwalk, California, 90650 ( "CONTRACTOR "), and is made with
reference to the following:
RECITALS:
A. On .September 11, 2007, CITY and CONTRACTOR entered into an On -Call
Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for
Underground Utility Repair Services.
B. CITY and CONTRACTOR have entered into two separate AMENDMENTS of the
AGREEMENT, the latest dated February 24, 2009.
C. CITY desires to enter into this AMENDMENT NO. 3 to extend the term of the
AGREEMENT to June 30,.2010.
D. CITY and CONTRACTOR mutually desire to amend AGREEMENT, hereinafter
referred to as "AMENDMENT NO. 3," as provided here below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as
follows:
1. TERM
The term of the AGREEMENT shall be extended to June 30, 2010.
2. COMPENSATION
City shall pay Contractor for the services on a time and expense not -to- exceed
basis in accordance with the provisions of this Section and shall be based on the
attached Schedule of Billing Rates (Exhibit A).
Pursuant to the applicable provisions of the Labor Code of the State of California,
not less than the general prevailing rate of.per diem wages including legal holidays
and overtime work for each craft or type of workman needed to execute the work
contemplated under the Agreement shall be paid to.all workmen employed on the
work to be done according to the Agreement by the Contractor and any
subcontractor. In accordance with the California Labor Code (Sections 1770 et
seq.), the Director of Industrial Relations has ascertained the general prevailing
rate of per diem wages in the locality in which the work is to be performed for each
craft, classification, or type of workman or mechanic needed to execute the
Agreement. . A copy of said determination is available by calling the prevailing
wage hotline number (415) 703 -4774, and requesting one from the Department of
Industrial Relations. The Contractor is required to obtain the wage determinations
from the Department of Industrial Relations and post at the job site the prevailing
rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him /her to comply with all State of California labor laws, rules
and regulations and .the parties agree that the City shall not be liable for any
violation thereof.
3. SERVICES TO:BE PERFORMED
Contractor shall perform various underground utility repair services pursuant to
this Amendment No. 3 and according to the Request to Extend On -Call
Professional Services Agreement dated July 13, 2009, attached hereto as
(Exhibit B).
4. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in AGREEMENT shall remain unchanged and shall be. in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 3
on the date first above written.
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
By:
nette D. Bea amp,
Assistant City Attorney
ATTEST:
By:
Leilani Brown,
City Clerk
CITY OF NEWPORT BEACH,
A Municipal Corporation
By:
Edward Selich,
Mayor
CONTRACTOR:
DOTY BROS. CONSTRUCTION CO..
(Corporate Officer)
Title: .President
Print Name: Chris Christy
0
(Financial Officer)
Title: Treasurer
Print Name: Carlos Garcia
Attachments: Exhibit A — Schedule of Billing Rates
Exhibit B — Request to Extend On -Call Professional Services Agreement
DOTY BROSE
Construction Company
SOUTHERN CALIFORNIA
COST PLUS RATES EFFECTIVE JULY 1. 2009
BACK HOES
ID #
Hourly
44.00
SHEEPS FOOT - Tow Behind (Vibrating)
Rate
AUGER
#1189
$ 20.00
Accessory - COMPACTION WHEEL EXECAVATOR
#1161
$ 40.00
Accessary - COMPACT WHEEL FICASEJD
#1179
S 20.00
Accessory - HYDRAULIC BREAKER I CASE & JO
91183
$ 50.00
Accessory - VIBRATORY PLATE
#1535
$ 40.00
CC -135A ROCK WHEEL
#1313
$ 75.00
CASE 580 /JD 310
_
$ 39.88
CASE 590
#3647
$ 41.88
CAT 300 -TRACK MOUNTED
#4055
$ 111.25
CAT 345 - TRACK MOUNTED
#4072
$ 141.25
CAT 416
#4147
$ 37.88
JD 710
#3308
$ 45.68
COMPACTION EQUIPMENT
ARROW (HYDRO HAMMER) /STOMPER
1D #
$
44.00
SHEEPS FOOT - Tow Behind (Vibrating)
#1169
$
16.00
WACKER TAMPER
#1860
$
23.00
COMPRESSORS WM0 LB. BREAKER SLAY SPADE & TAMPER
$
COMPRESSOR 125 -185 CFM
FLASHING ARROWBOARD - (4 HR. MIN.)
$
21.00
COMPRESSOR -AIR, PORTABLE (PER DAY RATE)
#1808
$
104.00
CRANES
GRINDER I COLD PLANER (BITELLI) - (4 HR. MIN.)
#1187
$
BOOM TRUCK - 8 TON
#3647
$
33.75
BOOM TRUCK - 10 - 11 TON
ROLLER (WALK BEHIND) -1 TON VIBRATOR
$
413.75
BOOM TRUCK - 14 TON
ROLLER TRAILER
$
52.75
BOOM TRUCK 23 .25 TON
#3308
$
57.75
CRANE - RT 115-18 TON (or equivalent)
TRENCHER TRAILER
$
59.75
DOZERS I SIDEBOOMS
UTILITY TRAILER
#6452
$
DOZER JD 450
#5078
$
43.13
SIDEBOOM CAT DE
ASPHALT PAVER - LEE BOY 1000D
$
57.13
SIDEBOOM CAT D-7
45063
$
68.13
SIDEBOOM CAT 561
#5045
S
63.13
SIDEBOOMCAT572
#5067
#3450
78.13
SIDEBOOM JO 450
5 Yard (Flat bed or Bobtal) Dump 123 Ton Utility Truck
,$
$
4113
FORKLIFTS
BACK HOE MOVER TRUCK
$
FORKLIFT - HYSTER 20,000 LB -
#1203
$
34.88
FORKLIFT -LION 6,000 LB
#1204
$
22.68
LOADERS
EQUIPMENT TRAILER -20,000 LB
$
MINI SKID STEER -DITCH WITCH
#1275
$
26.88
LOADER - BOBCAT W/ BUCKET
#11848
$
26.88
LOADER - BOBCAT W/ SWEEPER
#1184S
S
36.88
LOADER - BOBCAT W/ GRINDER
#1184G
$
56.88
RUBBER TIRE LOADER - 544 JD
#5086
$
45.75
RUBBER TIRE LOADER - 930 CAT
#5069
$
47.75
RUBBER TIRE LOADER - 950 CAT
#5087
$
58.75
RUBBER TIRE LOADER - 950EIF CAT
#5099
$
69.75
RUBBER TIRE LOADER - 966 CAT
#5070
$
64.75
SKIPLOADER - CASE 580 / MF 40E I F 445
TEST PUMP TRUCK
$
31.88
EXH 18IT"N'
ROAD EQUIPMENT
1D #
H-
Rate
CABLE DOLLY- ONE REEL(Tralior Mounted)
$
12.0
CABLE DOLLY- THREE REEL(Tralor Mounted)
$
25.0
FLASHING ARROWBOARD - (4 HR. MIN.)
$
17.0
GRADER -CAT 140
#R7791
$
81.7
GRINDER I COLD PLANER (BITELLI) - (4 HR. MIN.)
#1187
$
228.0
ROLLER - (RIDE ON)
$
29.0
ROLLER (WALK BEHIND) -1 TON VIBRATOR
$
23.0
ROLLER TRAILER
S
12.0
TILT TRAILER
#6366
$
120
TRENCHER TRAILER
#6481
$
12.0
UTILITY TRAILER
#6452
$
120
ZIPPER PAVEMENT GRINDER (PER DAY RATE)
#1800
$
375.0
ASPHALT PAVER - LEE BOY 1000D
#1196
$
113.7
CEMENT SAW -WALK BEHIND
#1938
$
- 33.0
TRUCKS
2 -3 TON LUKE TRUCK
#3450
$
16.2
5 Yard (Flat bed or Bobtal) Dump 123 Ton Utility Truck
$
22.7
BACK HOE MOVER TRUCK
$
19.7
CEMENT TRUCK wl muter and compressor
#3338
S
53.7
DUMPTRUCK 10WHEELER
$
30.7
EQUIPMENT TRAILER -20,000 LB
$
14.0
EQUIPMENT TRAILER - 40,000 LB
$
16.0
FLAT BED with LIFT
#3693
$
21.7
FLAT BED vft MIXER / DUMP
#3392
$
531
LOWBED TRAILER w/ Vector & move permit fees
#3455
S
44.7
LOWSIDE END DUMP TRAILER W/ TRACTOR
#3418
$
41.7
PICKUP TRUCKS - MISC. TOOLS NOT INCLUDED
S
152
PICK -UP- RENTAL NUMBER
R77DO
$
15.2
SERVICE TRUCK - MISC TOOLS NOT INCLUDED
$
17.2
SERVICE VAN - MISC TOOLS NOT INCLUDED
$
152,
TEST PUMP TRUCK
93401
S
78.7:
TEST TRAILER (Hyprostetic) (M549 & 6674)
$
32.0
UTILITY VEHICLE (NON -HWY)
$
222
WATER TRUCK - (1,500 -2,000 GALS.)
$
33.7:
WATER TRUCK - (3,500 GALS.)
#3464
$
38.7:
WINCH TRUCK
#3395
-$
28.71
MISCELLANEOUS
SOARING MACHINE HYDRAULIC
#1521
$
25.01
BORE MACHINE TRAILER
#6447
- $
10.0
TAP MACHINE (Water Ones &'to 12") (Per Inch / per day)
-#628
$
30.0
TAP MACHINE (Water lines up to 7) (Per inch I Per day)
#820
$
20.01
WELDERS
200 AMF -TRUCK MOUNTED
$
29.2!
200 AMF, SKID MOUNTED or TRAILER
$
16.21
WELDER - RIG RENTAL NUMBER
87704
$
29.2:
FABRICATION SHOP & EQUIPMENT
#101
$
90.01
P. I d2
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lie. 273024
DOTY BROSM
Construction Company
COST PLUS RATES
SOUTHERN CALIFORNIA
COST PLUS RATES EFFECTIVE JULY 1, 2009 TO JUNE 30, 2010
`PAY 97RAMf flc MligiF anv QMAMJ,Mr AVFR MIMIC
CRAFTSMANMJ.ASS
CODE
' 77ME
TIME
77ME
CRAFTSMANICLASS
CODE
TIME
17ME
TIME
CARPENTERS
OPERATING ENGINEERS
General Foreman
CGF
86.62
122.98
159.13
General Foreman, Appdv. A
OGF
95.11
131.58
168.04
Operating Foreman
COF
84.11
118.90
153.69
Foreman, Appdx A
OFM
91.78
12657
161.37
Foreman
CFM
81.82
115.47
149.12
Group 1, Appdx A -OAer
OG1
83.62
114.34
145.05
Journeyman
CJM
76.82
107.97
139.12
Groat 2, Appdx. A -Oiler
OG2
84.92
116.29
147.65
Shingler
CSJ
77.03
108.29
139.55
Group 8, Appdx A- Universal
OG8
86.44
121.57
154.69
Apprentice - 811h Period (90%)
CAS
70.59
98.82
126.66
Group 10, Appdx A - Mechanic
OGA
88.64
121.87
155.09
Group 8, Appdx B - Crone c 25 Tons
088
86.92
122.29
155.66
MILLWRIGHTS
Group 9, App& B - Crane > 25 Tons
069
89.21
122.72
156.23
General Foreman-
CMG
87.66
124.23
160.80
Apprentice, Grp B, Appdx A- Step 6(90%)
OA6
81.82
111.63
141 A4
Foreman
CMF
82.65
116.72
150.79
Journeyman
CMJ
77.65
109.22
140.78
U.A. PIPEFTTTERSAVELDERS
Apprentice - 8th Period (95 %)
CM8
68.18
95.01
121.54
INDUSTRIAL
General Foreman
IGF
97.71
133.28
168.65
CEMENT MASONS
Foreman
IFM
91.69
124.41
157.14
Foreman
MFM
78.46
105.56
132.67
Jwmeyman- WelderfF"dter
UM
82.63
111.09
139.54
Journeyman
MJM
73.45
98.05
122.66
Apprentice - Fifth Year
IA5
69.93
95.54
121.15
F &T Machine Operator
WO
73.87
90.68
123A9
Apprentice - 6th 6 Mm (So %)
MAS
68.53
90.67
112.82
SHORTLINE (LOCAL 280)
Foreman
SFM
95.42
132.57
186.91
LABORERS
Journeyman (WelderfFdferl,
SJM
90.31
125.40
157.75
Operator General Foreman
LOG
92.55
129.01
165.47
Welder Helpey
SWH
5241
71.17
88.88
Operator Foromml
LOF
89.21
124.01
158.80
Pre- Helper
SPH
30.68
42.10
53.51
General Foreman
LGF
72.55
99.01
125.48
Foreman
LFM
70.88
96.51
122.14
UTILITY
Group 1 - General
LGt
63.54
85.50
107.46
Operator Foreman
UOF
67.94
122.74
157.53
Group 2 - Wrapper To 6"
LG2
64.46
86.88
109.30
Foreman
UFM
66.04
69.89
113.73
Croup 3- PTOIWrapper >6"
LG3
65.38
88.25
111.13
Welder
UWO
64.52
67.61
110.69
Group 4 - Pipe layer, C&S
LG4
67.96
92.13
116.30
JoumeymantFuser
UJM
55.70
74,79
93.88
Group 5 - Blaster
LG5
68.55
93.01
117.47
Pipe Tradesman II
UP2
42.29
54.80
67.31
Apprentice - 6th Period (85 %)
LA6
52.17
7296
93.76
ELECTRICIANS /INSIDE VAREMEN
(Rates subject to projed location & employee base location)
TEAMSTERS
General Foreman
EGF
103.51
144.48
185.45
Operator General Foreman
TOG
97.59
134.05
170.51
Foreman
EFM
95.95
133.15
170.35
Operator Foreman
TOF
94.25
129.05
163.84
Journeymen
EJM
88.40
121.82
155.24
General Foreman
TGF -
73.77
98.32
122.88
Apprentice -10th Perlod (65 %)
EAO-
76.64
105.04
133.45
Foreman
TFM
72.10
95.82
119.54
Group 2 -2 Aide
TG2
69.02
91.19
113.37
PROJECT MANAGEMENT
Group 3 - 3 Aide
TG3
69.23
91.52
113.80
Project Manager.
MPM
111.65
152.73
197.24
Group 5 - Waking Truck Driver
TG5
69.60
92.07
114.54
Superintendent
MSP
100.17
136.52
176.33
Group 6 - 4 or More Aide
TG6
69.65
92.14
114.64
Project Engineer
MPE
77.75
113.79
149.83
Groat 9 - Lo-Sed
TG9
70.82
93.90
116.97
Safety Director
SAD
109.73
149.23
193.88
Group 12 - WTD BocmTrk Cert
TBT
72.67
96.97
121.08
Safety Supervisor
SAS
97.65
133.09
171.86
Apprentice Rates: Apprentice rates as fisted above are the highest classification prior to journeymen full scale rates. Billing rate for Apprentice Will be based on actual
classification.
Subsistence: $95.001day
Travel Time: Customer x111 be advised it Uwel tme is applicable .
Overtime Ratas: AN hours outside regularty consWed shin shall be fime and one half. Sundays and holidays shall be paid at double time. For Operating Engineers -first
four (4) hours outside regular slid; and fast twelve (12) hours on Saturday is time and one halt all additional hours at double time except holidays which are at triple time.
Emergency -call out worth' - Four (4) hone minimum for labor and equipment
Markup: Material, subcontractors, subsistence, and outside rentals (mduding fuel costs), will be billed cost plus sales tax where applicable, plus mark -up of 15%
Boundaries of Southern Caltfomra Cost Plus Rates: consists of the eleven (11) counties of Los Angeles, Inyo, Morro, Orange, Riverside, San Bernardino, Imperial,
Venture, Santa Barbara, San We Obispo, Kem and in addition: Richardson Rock, Santa Cna: Island, Arch Rock, San Nicholas Island, Catalina Island, San Clemente
Island. San Miguel Island, Santa Barbara Island; Santa Rosa Island, Anaeapa Island, including the Channel Islands Monument Rate Scale does not include San Diego
County
NOTFE Wage so a rate-
11232 E. Firestone Blvd, Nolwak CA 40650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lic. 273024
UOTY BROSM
Construction Company
SOUTHERN CALIFORNIA
MISCELLANEOUS
ID #
DAILY
MISCELLANEOUS
1139
Rate
ADDITIONAL (1) TORQUE KEAD FOR HYDRAULIC TORQUE WRENCH
93091
$ 50.00
PIPE LOCATOR
#643
AIR HOSE 3/4" X 50'
#870
$ 8.00
PIPE LOCATOR - METROTECH
#1935
AIR SAW
#857
$ %00
PIPE PUSHER /GRUNDORAM- HERCULE
#1939
AIR TAMPER
#859
$ 35.00
PIPE TONGS (4-,6-, 8 ",10 ", 17, 16", 18 ", 20")
#1936
ASPHALT SPREADER BAR
#1193
$ 125.00
PLYWOOD 1/3 REPLACEMENT COST
- #897
BARRICADES
#880
$ 2.50
PNEUMATICIHYDRAU TORQUE WRENCH
93090
BEVELING BAND 14" -20"
#833
$ 75.00
PORTABLE BAND SAW
#660
BEVELING BAND 24 "d2"
#834
$ 100.00
POWER THREADER
0853
BEVELING BAND 4 " -17
#832
$ 50.00
PRESSURE WASHER TRAILER MOUNT.
#6941
BEVELING MACHINE 14"-20"
#830
$ 75.00
PUMP - SKID MOUNT BENTONITE
#1166
BEVELING MACHINE 24 "-47
#831
$ 100.00
PUMP - SUBMERSIBLE
#881
BEVELING MACHINE V' -17' -
#829
$ 42.50
RIGID ROLL GROOVER
0873 & 98661
BORING MACHINE - CASE HYDRA -
#1092
$ 160.00
RIVET BUSTER f RIPPING GUN
#869
BORE MOTOR
#854
$ 16.00
ROCK DRILL (Phu SteeO
#865
BORING MACHINE 1 -12" &13/4" V=1 Pwch)
#1178
$ 15.00
ROCK SEPARATOR- GRIZZLY
#1811
BORING MACHINE 4 " -e" (A=uPvnch)
#1520
$ 25.00
ROTARY HAMMER (Plus Steel)
0852
BORING MACHINE 3 -112" (A-U -Pesch)
#1177
$ 20.00
SANDBLASTER - UNIT (with accessories)
#1175
BUFFER &GRINDER
#836
$ 25.00
SAWZALL
#874
BUILDER LEVEL - AC-2X NIKON
#845
$ 25.00
SHORING LUMBER 3" X 17 X 14' (113 REPIACEMEwcosp
#895
CEMENT MIXER
$ 43.00
SHORING LUMBER 6"X S 'X8' on RmAcEDEHr cost) #896
CHAIN LINK FENCE PANELS
#846
$ 3.00
SKILL SAW (INCLUDES BLADES)
#835
CHAIN SAW 16" (INCLUDES BLADES)
#850
$ 50.00
TAP MACHINE -T.D. WILLIAMSON (UP TO 3 ")
#827
CHIPPING GUN (PWs Steel)
#868
$ 35.00
TAR POT
#862
CLAY SPADE (Plus Steel)
4866
$ 35.00
TEST PLUG
#892
CLEANING BALL
#890
$ 10.00
TEST PUMP 200 LB. 400 LB. SPRAGUE
41815
COM-A -LONG I CHAIN
#886
$ 15.00
TEST PUMP 5,000 LB. TRAILER MOUNTED
#8818
CONCRETE FINISHER
#1823
$ 125.00
TEST PUMP High Pressure
#1940 .
CONCRETE VIBRATOR
#891
$ 40.00
TEST PUMP Portable 2001b
(#818& #817)
CONSTRUCTION SIGNS
#882
$ 4.00
TESTING TABLE
#1834
CROSSING PLATES
#878
$ 6.25
TRAFFIC CONES
#861
CUT OFF I CHOP SAW (INCLUDES BLADES)
#810
$ 53.00
TRANSIT - THEOLITE
9845C
DEAD WEIGHT TESTER
$ 60.00
TRENCH BOX -6' X 10'
#1910
DELINEATORS
#879
$ 2.50
TRENCH BOX - V X 10'
#1909
DRILL MOTOR 1/2"
#611
$ 20.00
TRENCH JACK (SCREW)
4877
DRILL MOTOR 314"
#812
$ 25.00
TRENCH JACK (HYDRAULIC)
#876
DRY ROD OVEN - PORTABLE
#813
$ 25.00
TRENCHER
#1160
DUCT ROD
#855
$ 30.00
TRI -VISE
#884
EMULSION POT SPRAYER
$ 60.00
VIBRATOR PLATE
FLOODLIGHT TRIALER (MERCURY VAPOR LIGHTS)
$ 125.00
WALKIE TALKIES (SET OF 2)
#893
FLOW LINER
#841
$ 25.00
WATER HOSE 1 12" X 50'
9871
FUSION MACHINE 4 -17 Macelroy
#3095
$200.00
WATER HOSE 2 1/2" X 50'
#872
GENERATOR (3.5 -5KW).
#1007
$ 53.00
WATER PUMP 2" Portable
#1831
GENERATOR (75 KW)
96280
$ 75.00
WATER PUMP 3" Portable
#1832
HEAT TRACER
#814
$ - 25.00
WEEDFATER
#116
HEATER
#815
$ 25.00
WHALERS HYDRAULIC -
41894
HOLIDAY DETECTOR
#838
$ 25.00
WINCH 10 TON (GRUNDO)
#6042
HYDRAULIC STAR CUTTER
#889
$ 100.00
IMPACT GUN 1"
#819
$ 25.00
IMPACT GUN 12"
#821
$ 15.00
SAFETY AND HAZMAT EQUIPMENT
IMPACT GUN 374" -
#B22
$ 20.00
EXPLOSIMETER
#844
IMPACT WRENCH 1"
#864
$ 35.00
4 WAY GAS MONITOR
4921
LADDER
#875
$ 10.00
MULTI -GAS DETECTOR / PID
#914
LASER LEVEL
48458
$ 75.00
AIR SUPPLY UNIT
1922
LEAF BLOWER
#824
$ 25,00
ESCAPE AIR PACK
#918
LIGHT STAND
#849
$ 15.00
H2S MONITOR
#920
MANHOLE BLOWER
#640
,
$ 43.00
HAZMAT SUIT -TYVEK
0912
PAVEMENT BREAKER /JACKHAMMER
#867
$ 35,00
HAZMAT TRAILER
#6648
PIPE BENDER 5' GREENLEE
#1885
$ 100.00
RESPERATOR - HALF/FULL MASK
#911
PIPE BENDER MACHINE 6 -20" (Pdu shaes#reight per day)
#1062.
S 400.00
SCBA - self contained
9916
PIPE BENDER SHOES 1 1082 BENDER
#1190
$1165.00 WEEKLY
SCBA cylinder - extra
#917
PIPE CUTTER - RIDGID SOIL
#885
$ 15.00
TRIPOD WITH WINCH
9913
PIPE CUTTER LINEUP CLAMP 16" -36"
#839
$ 50.00
PIPE CUTTER LINEUP CLAMP.B" -14"
#651
$ 25.00
Pays 2c(2
11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 wwtv.dotybros.com CA Lie. 273024
DAILY
Rate
$ 50.0(
$ 100.0(
$ 100.01
$ 50.0(
$ 25.01
$ 15.0(
$ am
$ 20.00
$ 5.0G
$ 40.00
$ 25.0E
$ 100.0(
DOTY BROSs
Construction Company
July 13, 2009
City of Newport Beach
949 West 16th Street
Newport Beach, CA 92658
Attention: Cindy Asher, Utilities Administration Manager
Reference: Professional Services Agreement
On -Call Emergency Underground Utility Repairs
Term: 09/01/08-06/30/09
Subject: Labor Rates and Equipment Rates
Ms. Asher:
r
17,2: .:
,CN..
T4
C) gr
vie
to
✓P <) /
Thank you for your fax with regard to the above referenced; it's that time of year again! As
mentioned in our letter dated December 31, 2008, Doty Bros..Equipment Co., ( "DBEC ") is submitting to
you its current effective Labor Rates and Equipment Rates in order to amend the Agreement.
Thank you once again for your patience and understanding as we completed integration of the
labor agreement rate modifications into the current rate schedules. As you are aware, Doty Bros.
Equipment Co. is a union signatory contractor therefore in compliance with its current labor agreements,
these rates are now effective and applicable to us. Therefore, we respectfully request your prompt
acceptance by issuance of a revised Amendment.
In addition, we would like to bring your attention to the fact that this year our Labor and
Equipment Rates are again effective for one year (July 1, 2009 through June 30, 2010). Thank you in
advance for your time and consideration. Please know that it remains our goal to bring our customers
professional and quality services for a competitive price.
If you should have any questions or require further information please do not hesitate to call our
office.
y Z ,
Monache J Titchenell
Assistant Contracts Administrator
cc: Phil Dennis
Mike Collins
Contract file
enclosures
11212 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864 -6566 Fax: (562) 864 -6052 www.dotybros.com CA Lic. 273024
AMENDMENT NO. 3
TO
PROFESSIONAL SERVICES AGREEMENT WITH GCI CONSTRUCTION, INC.
FOR ON-CALL UNDERGROUND UTILITY REPAIR SERVICES
THIS AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT, is
entered into as of this 8th day of September, 2009, by and between the CITY OF
NEWPORT BEACH, a Municipal Corporation ( "CITY"), and GCI CONSTRUCTION,
INC. a California Corporation whose address is 245 Fischer Avenue, Ste. B -3., Costa
Mesa, California, 92626 ( "CONTRACTOR "), and is made with reference to the
following:
RECITALS:
A. On September 12, 2006, CITY and CONTRACTOR entered into an On -Call
Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for
Underground Utility Repair Services.
B. CITY and CONTRACTOR have entered into two separate AMENDMENTS of the
AGREEMENT, the latest dated July 8, 2008.
C. CITY desires to enter into this AMENDMENT NO. 3 to extend the term of the
AGREEMENT to June 30, 2010.
D. CITY and CONTRACTOR mutually desire to amend AGREEMENT, hereinafter
referred to as "AMENDMENT NO. 3," as provided here below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as
follows:
1. TERM
The term of the AGREEMENT shall be extended to June 30, 2010.
2. COMPENSATION
City shall pay Contractor for the services on a time and expense not -to- exceed
basis in accordance with the provisions of this Section and shall be based on the
attached Schedule of Billing Rates (Exhibit A).
Pursuant to the applicable provisions of the Labor Code of the State of California,
not less than the general prevailing rate of per diem wages including legal holidays
and overtime work for each craft or type of workman needed to execute the work
contemplated under the Agreement shall be paid to all workmen employed on the
work to be done according to the Agreement by the Contractor and any
subcontractor. In accordance with the California Labor Code (Sections 1770 et
seq.), the Director of Industrial Relations has ascertained the general prevailing
rate of per diem wages in the locality in which the work is to be performed for each
craft, classification, or type of workman or mechanic needed to execute the
Agreement. A copy of said determination is available by calling the prevailing
wage hotline number (415) 703 - 4774, and requesting one from the Department of
Industrial Relations. The Contractor is required to obtain the wage determinations
from the Department of Industrial Relations and post at the job site the prevailing
rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules
and regulations and the parties agree that the City shall not be liable for any
violation thereof.
3. SERVICES TO BE PERFORMED
Contractor shall perform various underground utility repair services pursuant to
this Amendment No. 3 and according to the Request to Extend On -Call
Professional Services Agreement dated July 20, 2009, attached hereto as
(Exhibit B).
4. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in AGREEMENT shall remain unchanged and shall be in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 3
on the date first above written.
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
By:
ynett . Bp q Hamp,
Assistant City Atta'rney
ATTEST:
Mn
Leilani Brown,
City Clerk
CITY OF NEWPORT BEACH,
A Municipal Corporation
0
Edward Selich,
Mayor
CONTRACTOR:
GCI CONSTRUCTION, INC.
M
(Corporate Officer)
Title: President
Print Name: Terry D. Gillespie
0
(Financial Officer)
Title: Secretary Treasurer
Print Name: Floyd Bennett
Attachments: Exhibit A — Schedule of Billing Rates
Exhibit B — Request to Extend On -Call Professional Services Agreement
GCI CONSTRUCTION . Effective 7rtraog
to wino
EQUIPMENT OPERATED RATE SCHEDULE
DESCWPTION
FOREMAN PICK UP TRUCK
19.00
HOUR
CREWTRUCK
34.00
HOUR
10 WHEELER DUMP TRUCK
8a.00
HOUR
SUPER 10
80.00
HOUR
BOTTONYSEMI END DUMP
91.00
HOUR
LOW BED RATE
110A0
HOUR
SIOPLOADER
125.00
HOUR.
BOBCAT
30.75
HOUR
446D BACKHOEILOADER _
150.00
HOUR
555E BACKHOFiLOADER
135.00
HOUR
NEW HOLLAND BACKHOEa.OADER
135.00
HOUR
936 WHEEL LOADER
145.00
HOUR
I
.
CAT 950 LOADER
145.00
HOUR
CAT ME LOADER
1SOM
HOUR
JD 450 WITH BOARD
SsaAe
HOUR
CAT 307 EXCAVATOR
1
HOUR
CAT 313 EXCAVATOR
ITMOO
HOUR.
CAT 325 EXCAVATOR
19LOO
HOUR
CAT 321CLCR EXCAVATOR
185.00
HOUR
CAT Z= EXCAVATOR
22G.Ga
HOUR
KDBELCO SKWC LC1V EXCAVATOR
.50
HOUR
RING O MATIC POT HOLING MArME
400.06
DAY
SOAOHR
ASHPIMT ZIPPER - -
250=
HOUR
Pcn Toga
. .
ARROWBOARD
98.110
DAY
WATER TRUCK
160.00
DAY
Bare
.
COMPACTION WHEEL
2540
HOUR
COMPRESSOR
152.00
DAY
COMPRESSOR WIJACKHA6IMER.
taw MULTIQUIP TOWABLE GEN
228.00
DAY
205.00.DAY
HYDRAULIC BREAKER
.48.00
HOUR
2000 LBS
LIGHTTOWER
9200DAY
WACKER
9200
DAY
Zkm aTrailer
18 M
HOUR'
C trash m &hoses
02A0
day
.
8x48 Traaoh B"
_ 82.50
day
247.. va
jeamo
4z 16 Tmrmh Box
55.00
day
1$&f)CVft
4sWVA
8 x 24 Tnmch Box
180.0
DAY
S40AG W&
t - Ma
U-aOR RATES:.
REGULAR
OVERTIME
DBLTUM
- LABORER GRAVING
49.81
6SAt
83.80
LABORER SEWER
50.16
S7
84.44
LABORER WATER -
49.04
86
02.11
PIPELAYER GR/UNNG.
-5&24
- 71...
G&e4
'PiPELAYERSEWER
53.61
72A0
9t34
PtPHLAVERWATER
52.83
7136
69-
OPERASORGRAOING
07.92
92.84
117.77
OPERATOR SEWER
68.43
SEGO
118:76.
OPERATOR WATER
G&GO
93.011
119:76.
.
FOREMAN GRADING
70.4
61
1 - TO
FOREMAN SEWER
7017
MID
123.03
FOREMAN WATER
71.15
97,47
t24.10
EXHIBITW
�. .
r
July 20, 2009
CITY OF NEWPORT BEACH
UTILITIES pEPARTMENt
Attn: Cindy Asher
3300 Newport Boulevard
Newport Beach, CA 92658,5915
(949)r>44-3010 Fax(M)646-5204
EXHIBIT °B�
General Engineering Contractor Lic. No: 755356
Re: Amendment to Professional Services Agreement
Clear Ms: Asher: .. .
GC Constriction, Inc. is requesting to extend the ProfessionalServl�Agree rent for
another year commencing on July 1, 2009 through June 30, 2010. New sheets) are
attached.
Encl. Rate Shee$; 7'11[09
245 FISCIER AGUE, STM B-3, COSTA MSA, CALIFORNIA 996
(714) 957-0233 FAX(714)540-1.148
AMENDMENT NO.2
TO
PROFESSIONAL SERVICES AGREEMENT WITH
VALVERDE CONSTRUCTION, INC.
FOR ON -CALL UNDERGROUND UTILITY REPAIR SERVICES
THIS AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT, is
entered into as of this 8t" day of September, 2009, by and .between the CITY OF
NEWPORT BEACH, a Municipal Corporation ( "CITY"), and VALVERDE
CONSTRUCTION, INC., a California Corporation whose address is 10918 Shoemaker
Avenue, Santa Fe Springs, California, 90670 ( "CONTRACTOR "), and is made with
reference to the following:
RECITALS:
A. On November 13, 2007, CITY and CONTRACTOR entered into an On -Call
Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for
Underground Utility Repair Services.
B. CITY and CONTRACTOR have entered into one separate AMENDMENT of the
AGREEMENT, dated July 22, 2008.
C. CITY desires to enter into this AMENDMENT NO. 2 to extend the term of the
AGREEMENT to June 30, 2010.
D. CITY and CONTRACTOR mutually desire to amend AGREEMENT, hereinafter
referred to as "AMENDMENT NO. 2," as provided here below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as
follows:
1. TERM
The term of the AGREEMENT shall be extended to June 30. 2010.
2. COMPENSATION
City shall pay Contractor for the services on a time and expense not -to- exceed
basis in accordance with the provisions of this Section and shall be based on the
attached Schedule of Billing Rates (Exhibit A).
Pursuant to the applicable provisions of the Labor Code of the State of California,.
not less than the general prevailing rate of per diem wages including legal holidays
and overtime work for each craft or type of workman needed to execute the work
contemplated. under the Agreement shall be paid to all workmen employed on the
work to be done according to the Agreement by the Contractor and any
subcontractor. In accordance with the California Labor Code (Sections 1770 et
seq.), the Director of Industrial Relations has ascertained the general prevailing
rate of per diem wages in the locality in which the work is to be performed for each
craft, classification, or type of workman or mechanic needed to execute the
Agreement. A copy of said determination is available by calling the prevailing
wage hotline number (415) 703 -4774, and requesting one from the Department of
Industrial Relations. The Contractor is required to obtain the wage determinations
from the Department of Industrial Relations and post at the job site the, prevailing
rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules
and regulations and the parties agree that the City shall not be liable for any
violation thereof.
3. SERVICES TO BE PERFORMED
Contractor shall perform various underground utility repair services pursuant to
this Amendment No. 2 and according to the Request to Extend On -Call
Professional Services Agreement dated July 15, 2009, attached hereto as
(Exhibit B).
4. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in AGREEMENT shall remain unchanged and shall be in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 2
on the date first above written.
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY:
By:
Kjn6tte6.,Be amp,
Assistant City A orney
ATTEST:
0
Leilani Brown,
City Clerk
CITY OF NEWPORT BEACH,
A Municipal Corporation.
Edward Selich,
Mayor
CONTRACTOR:
VALVERDE CONSTRUCTION, INC.
M
(Corporate Officer)
Title: President
Print Name: Edward Valverde
(Financial Officer)
Title: Corporate Treasurer
Print Name: Michael Valverde
Attachments: Exhibit A— Schedule of Billing Rates
Exhibit B — Request to Extend On -Call Professional Services Agreement
VALVERDE CONSTRUCTION INC.
LABOR RATES
7/1/69 - 6130/10
Rate.
Code
BASE
PAY
VAC
PAY
EMPEE
PAY
RATE
EMPER
TAXES
13.65%
GEN'L
LIAR
INS
WKRS
CMP: INS.
7.61%/u
ENSIO
HLTH
AND
WEL.
OTHER
FRINGE
TOTAL
FRINGE
REG
COST
RATE
O/T
COST
RATE'
WT
COST
"RATE
CARP
ICARPENTER
37.35
3.30
40.65
5.63
3.52
3.09
2.91
3.95
0.76
23.16
50.51
79.19
97.86.
CMFR
I Cement Masons A. Rojas)
30.00
5178
35.78
4.96
3.52
2.72
4.95
5.92
1.89
29.74
59.74
.. 74.74:
89.74
CMF
Cement Masons
29.50
5.78
35.26
4.89
3.52
2.68
4.95
5.92
1.89
29.53
59.13
73.68
56.63
LCF2
Laborer Foreman C2 (Tapia)
28.72
3.60
32.32
4.48
3.52
2.46
5.75
4.76
0.98
25.55.
54.27
68.63
82.99.
LF1A
Laborer FOREMAN 1A ORTIZ,CARREON
34.48
3.60
38.08
5.27
3.52
2.90
5.75
4.76
0.98
26.78
61.26.
`78.50..,
95.74
LGF1
Laborer FOREMAN 1 (MONTANO)
27.291
3.60
30.891
428
3.521
2.35
5.751
4.76
0.981
25.24:.
52.53
66.17
79.82
LGF3
FOREMAN 3 J.R. MUNOZ
36.731
3.60
40.33
5.59
3.52
3.07
5.75
4.76
0.98
. 63.99
82.36
100.72
LG1
GEN. LABORER GROUP 1
26.33
3.60
29.93
4.15
3.52
2.28
5.75
4.76
0.98
51.36,
64.53
. '.. 77.69
LG4
PIPELAYER GROUP 4
28.98
3.60
32.58
4.51
3.52
2.48
5.75
4.76
0,98
64.58
.69.07
83.56
LG5
PIPELAYER GROUP 5
29.33
3.60
$2.93
4.56
3.52
2.51
5.75
4.76
0.98
55.01
69.67
84.34
010C
GROUP 10C (Mike Valverde
38.88
2.82
41.70
5.78
3.52
3.17
5.55
8.20
0.89
N3.28
68.81
88.25
107.69
OGS
GROOP.8
39.72
2.82
42.54
5.89
3.52
3.24
•5.55
8.20
0.89
69.2;3
... 89.69
109.55
OG9
GROUP 9 (Jerry Lewis
41.36
2.82
44.18
6.12
3.52
3.38
5.55
8.20
- 0.89
71.82
.. 92.50
, 113.18
SDFM
GEN. FORE. San Die o - R.Ro baI
30.84
3.75
34.59
4.79
3.52
2.63
3.85
4.26
0.96
64.60
70:02
85.44
WC
FOREM N a e SFii1
30.40
2.60
33.00
4.57
3.52
2.51
5.00
10.52
i.56
60.68
75.88
91.08
TF1
FOREMAN (B.DOSEK)
28.40
2.60
31.00
4.29
3.52
2.36
5.00
10.52
1.56
29.85.
58.25.
72.45
86.65
TTDS
Teamster TRUCK DRIVER SPECIAL
28.94
2.60
31.54
1 4.371
3,521
2A01
5.001
10.52
1.55
29.97
58.91
: _ 73.38.
87.85
TTD
Teamster TRUCK DRIVER
1 26.941
2.601
29.541
4.091
3,521
2251
5.001
10.52
1.55
29.54
56.48
69.95
83.42
s
Rates Good Through June 30 2010
7115/2009 P,kus 15% Markup
VALVERDE CONSTRUCTION INC.
Equipment. Rates
July 1, 2009 to June 30, 2010
UNIT#
EQUIPMENT DESCRIPTION
Rate
01 -Apr-09
AB
ARROWBOARDS
A80014
WANCO SOLAR ARROWBOARD
9.38
PER HOUR
ABOO15
WANCO SOLAR
ARROWBOARD
9.36
PER HOUR
A80016
WANCO SOLAR
ARROWBOARD
9.38
PER HOUR
AB0017
WANCO SOLAR
ARROWBOARD
9.38
PER HOUR
ABO018
WANCO SOLAR ARROWBOARD
9.38
PER HOUR
A80019
WANCO SOLAR ARROWBOARD
9.38
PER HOUR
AB0020
NATIONAL SIGNAL
MESSAGE BOARD
9.451
PER HOUR
A80021
NATIONAL SIGNAL
MESSAGE BOARD
9.451
PER HOUR
A60022
NATIONAL
SIGNAL
MESSAGE BOARD
9 -45
PER HOUR
AB0023
NATIONAL
SIGNAL
MESSAGE BOARD
9.45
PER HOUR
SH
BACKHOES
BH0018
CATERPILLAR 416C BACKHOE
47.30
PER HOUR
SHOO19
CASE 590L BACKHOE
51 -92
PER HOUR
BH0020
CAT BACKHOE 430D
41.59
PER HOUR
BH0021
- CAT BACKHOE 4468
64.96
PER HOUR
SH0022
CAT BACKHOE 4468
64.96
PER HOUR
SH0023
CAT BACKHOE 4468
64.%
PER HOUR
BH0024
CAT BACKHOE 4468
64.98
PER HOUR
BH0025
CAT BACKHOE 420D
47.11 1
PER HOUR
SH0026
CASE 5905 BACKHOE
51.921
PER HOUR
CP
COMPRESSORS
GPO001
CompAir Q175 COMPRESSOR
19.371
PER HOUR
CP0002
CompAir Q175 COMPRESSOR
ig.371
PER HOUR
CP0003
CompAir 0175 COMPRESSOR
19:37
PER HOUR
CP0004
CompAir Q175 COMPRESSOR
19 -37
PER HOUR
CP0005
CompAir Q175 COMPRESSOR
19.37
PER HOUR
CP0006
CompAir Q175 COMPRESSOR
19.37
PER HOUR
CP0007
CompAir Q175 COMPRESSOR
19.37
PER HOUR
CP0008
CompAir Q175 COMPRESSOR
19.37
PER HOUR
CP0009 -
CompAir 0175 COMPRESSOR
19.37
PER HOUR
CP0010
CompAir Q175 COMPRESSOR
19.37
PER HOUR
L
ORKLIFTS
FLO004
CAT DP40K -D
55.81
PER HOUR
LD
LOADERS
LD0006
JOHN DEERE 544H LOADER
64.77
PER HOUR
L00008
JOHN DEERE 444H LOADER
54.72
PER HOUR
LD0009
CASE 570 LXT 4WD LOADER
38.37
PER HOUR
LT
LIGHTTOWERS
LTOOOI
ALLMAND NLPKFMXZ LIGHT TOWER
11.81
PER HOUR
LT0002
ALLMAND NLPKFMXZ LIGHT TOWER
11.81
PER HOUR
LT0003 -
ALLMAND NLPKFMXZ LIGHT TOWER
11.81
PER HOUR
LT0004
ALLMAND NLPKFMXZ LIGHT TOWER
11.81
PER HOUR
LT0005
ALLMAND NL PRO
. PER HOUR
PU
PUMPS
PO0002
GRIFFIN 6" TRASH PUMP
PER HOUR
PO0003 -
PT3A 3"
PER HOUR
PO0004
MULTIQUIP QP -40TH 4'
N29.69
PER HOUR
PO0005
GRIFFIN 8" DIESEL PUMP
PER HOUR
PU0006
HYPRO 3/4" 5210C -R TEST PUMP
PER HOUR
PO0007
HYPRO 314" 52100 -R TEST PUMP
- PER HOUR
RO
ROLLERSICOMPACTION WHEELS
RO0001
CATERPILLAR CB224C ROLLER
33.59
PER
HOUR
- RO0002
CATERPILLAR 214C ROLLER
29,441
PER
HOUR
RO0003
II R SD40FD COMPACTION ROLLER
55.29
PER HOUR
TK
TRUCKS
TK1773
1993
Ford F -250
21.41
PER HOUR
TK3079
2003 Chevy 52500 P.U.
21.41
PER HOUR
TK3790
2003 Dodge 1500
21.41
PER HOUR
TK5855
2007 Ford F -150 XCAB
21.41
PER HOUR
TK5856
2007 Ford F -150 XCAB
21.41
PER HOUR
TK6600
1994 Ford F -250
21,41
PER
HOUR
TK7171
1997 Ford F -150
21.41
PER
HOUR
TK2437
2008 Dodge Ram 2500 Reg.Cah
24.43
PER
HOUR
TK3537
2000 Chevy 2500 PU
24.43
PER HOUR
K5
T096
1999 C2500
24.43
PER HOUR
Plus 15% mark up
VALVERDE CONSTRUCTION INC.
Equipment Rates
July 1, 2009 to June 30, 2010
UNIT
EQUIPMENT DESCRIPTION
Rate
01-Apr-09
AB
ARROWBOARDS
TK6081
1997 Chevy C2500
24.43
PER HOUR
TK6726
2008 Ford F -250 Reg. Cab
24.43
PER HOUR
TK6727
2008 Ford F -250 Reg. Cab
24.43
PER HOUR
TK7057
1997 Ford F-450
26.44
PER HOUR
TK7379
2003 Ford F- 350 + welder +compressor
36.04
PER HOUR
TK8353
2000 Chevy 3500
26.44
PER HOUR
TK1822
2004 Ford F- 450 + welder +compressor
40.67
PER
HOUR
TK3513
2008 Ford F-450 + welder+ compressor
40.67
PERHOUR
TK3514
- 2008 Ford F-450 + welder +compressor
40.67
PER HOUR
TK3515
2008 Ford F450 + welder +compressor
40.67 1
PER HOUR
TK3516
2008 Ford F450 + welder +compressor
40.67 1
PER HOUR
TK4101
1997 Ford Super Duty Truck
29.95 1
PER HOUR
TK6007
2004 Ford F450 + welder +compressor
40.67 1
PER HOUR
TK9099
2004 Ford F450 + welder + compressor
40.67 1
PER
HOUR
TK4559
2003 Ford F -550 + welder + compressor
43.02 1
PER
HOUR
TKO014
89' FORD 5-0 YARD DUMP TRUCK
50.46
PER HOUR
TKOD15
97' FORD LT9513 10 WHL DUMP TRUCK
54,171
PER HOUR
TK0222
91 PETERBUILT 379 10 WHL DUMP TRUCK
64.771
PER HOUR
- TK5561
87' GMC C7 5 -6 YARD DUMP TRUCK
50.46
PER HOUR
TK40
TRAILER 2 AXLE - 8 TIRE
16.24
PER HOUR
TK40LP
TRAILER 2 AXLE - 8 TIRE
16.24
PER HOUR
VP
VIBRATOR PLATES
VPWO7
86' WACKER
8.75
PER HOUR
' VP0002
86' WACKER
8.75
PER HOUR
VP0003
WACKER
8.75
PER HOUR
VP0004
MULTI QUIP
8.75
PER HOUR
VP0005
WACKER DIESEL
8.75
PER HOUR
WT
WATER TRUCKS
WT0002
92' FORD 1800 GALLON WATER TRUCK
46.90
PER HOUR
WT0003
92' FORD F700 1800 GALLON WATER TRUCI
46.90
PER HOUR
MS
MISCELLANEOUS
MS0002
INDEPENDENT WET BORE 2927
25.00
PER HOUR
MS0003
I/R WET BORE 44SL
25.00
PER HOUR
MS0004
3 " -12" HOT TAP MACHINE
26.25
PER HOUR
MS0005
ASPHALT ZIPPER
87.17
PER HOUR
MS0008
DYNAMATION GAS DETECTOR 929A
18.75
PER HOUR
' MS0013
LEE BOY TACK SPRAYER
19.69
PER HOUR
MSOW4
MECO 35HP CONCRETE SAW
1.7.70
PER HOUR
MSOO18
AP 25 VENTILATION BLOWER
9.26
PER HOUR
MS0019
AP 12 VENTILATION BLOWER
7.86
PER
HOUR
MS2495
LEE BOY L150 TACK SPRAYER
39.38
PER
HOUR
MS0150
ARROW HAMMER HJ125OR
7.03
PER
HOUR
MS0900
RIVET BUSTER
6.00
PER HOUR
M80901
CONES/DELINEATORS
0.35
PER DAYlEA-
MS0902
POWDER PUFF (60 lbs)
4.75
PER HOUR
MSOS03
SIGNS
4.00
PER DAY
MS0904
90# JACKHAMMER
4.75
PER HOUR
MSO905
60# JACKHAMMER
4.75
PER HOUR
M80906
CLAY SPADE
6.56
PER
HOUR
MS0907
HIGH LEVEL FLAG TREE
6.00
PER
DAY
MS0908
3"&4" TRASH PUMP
21.94
PER HOUR
MS0909
SAWTRUCK & SAW (15000 GVW, 35HP)
29.95
PER HOUR
MS0910
GANG TRUCK (15,000 GV W
29.95
PER HOUR
MS0911
GENERATOR (6.5 KW)
11.81
PER
HOUR
MS0912
BLOWER WIHOSE
6 -63
PER
HOUR
MS0914
2" TRASH PUMP 1260 GPH)
5.09
PER HOUR
MS0915
2" SUBMERSIBLE PUMP (1260 GPH)
5.09
PER HOUR
MS0916
50' AIR HOSE
1.00
PER HOUR
MS0917
CUTOFF SAW
3.21
PER
HOUR
MSOS18
50' FIRE HOSE 2 112"
0,95
PER
HOUR
MS0919
CONFINED SPACE PACKAGE
4.20
PER HOUR
MS0920
CHIPPING GUN (25 Ibs )
5.25
PER HOUR
MS0921
ROTOR HAMMER
6.50
PER HOUR
MS0922
GENERATOR 45 KIN KVA
16.08
PER HOUR
MS0923
BARRICADE WIFLASHER LITE
0.44
PER DAYlEA
MS 924
18" & 24" MOUNTED COMPACTOR WHEEL
1.95
PER HOUR
Plus 15% mark up
VALYTRDE CONSTRUCTION, INC.
Ce"W1 rngir ine Comma=
Umme No. 276469
10918 SHOEMAKER AVE.
SANTA FE SPRINGS, CA 90670
(562)906 -1826 • FAX: (562) 906 -1918
July 15, 2009
City of Newport Beach
Utilities Department
Attn: Cindy Asher
300 Newport Blvd,
Newport Beach, CA 92658915
Re: Amendment to Professional Services Agreement
Dear Ms. Asher -
Valverde Construction Inc. is requesting to extend the Professional Services
Agreement for another year to commence on July 1, 2009.
New rate sheets are attached.
Sincerely,
VALVERDE CONSTRUCTION,.INC.
Edward Valverde
President
Enclosure
DOTY BROS. CONSTRUCTION
COMPANY
Carpenters
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
General Foreman
$85.62
$86.82
$1.20
Operating Foreman
$80.32
$84.11
$3.79
Foreman
$80.62
$81.82
$1.20
Journeyman
$75.62
$76.82
$1.20
Shingler
$75.83
$77.03
$1.20
Apprentice -8th Period (90 %)
$69.39
$70.59
$1.20
Millwrights
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
General Foreman
$86.46
$87.66
$1.20
Foreman
$81.45
$82.65
$1.20
Journeyman
$76.45
$77.65
$1.20
Apprentice -8th (95 %)
$66.98
$68.18
$1.20
Cement Masons
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Foreman
$75.86
1$73.87
$78.46
$2.60
Journeyman
$72.53
$73.45
$.92
F & T Machine Operator
$72.94
$72.55
$.93
Apprentice - 8th Period (90 %)
$67.61
$68.53
$.92
Laborers
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Operator General Foreman
$88.76
$92.55
$3.79
Operator Foreman
$85.43
$88.21
$2.78
General Foreman
$71.35
$72.55
$1.20
Foreman
$69.68
$70.88
$1.20
Group 1- General
$62.34
$63.54
$1.20
Group 2 -Wrapper to 6"
$63.26
$64.46
$1.20
Group 3 - PTO / Wrapper> 6"
$64.18
$65.38
$1.20
Group 4 -Pipe layer, C &S
$66.76
$67.96
$1.20
Group 5 - Blaster
$67.35
$68.55
$1.20
Apprentice -6`h Period (85 %)
$51.63
$52.17
$.54
Teamsters
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Operator General Foreman
$9186
$97.59
$3.73
Operator Foreman
$90.53
$94.25
$3.72
General Foreman
$72.63
$73.77
$1.14
Foreman
$70.96
$72.10
$1.14
Group 2 -2 Axle
$67.88
$69.02
$1.14
Group 3 - 3 Axle
$68.09
$69.23
$1.14
Group 5 - Working Truck Driver
$68.46
$69.60
$1.14
Group 6 - 4 or More Axle
$68.51
$69.65
$1.14
Group 9 -Lo-Bed
$69.68
$70.82
$1.14
Group 12 - WTD Boom Truck Cert
$71.73
$72.87
Operating Engineers
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
General Forman, Appdx. A
$91.63
$95.11
$3.48
Forman, Appdx. A
$88.29
$91.78
$3.49
Group 1- Appdx. A - Oiler
$80.13
$83.62
$3.49
Group 2 - Appdx. A - Oiler
$81.44
$84.92
$3.48
Group 8- Appdx. A- Universal
$84.96
$88.44
$3.48
Group 10- Appdx. A- Mechanic
$85.16
$88.64
$3.48
Group 8, Appdx. B - Crane < 25 tons
$85.44
$88.92
$3.48
Group 9, Appdx. B -Crane >25 tons
$85.72
$89.21
$3.49
Apprentice, GR 8, Appdx A -STEP 6(90x)
$78.59
$81.82
$3.23
U.A. Pipefitters /Welders (Industrial)
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
General Foreman
$94.98
$97.71
$2.73
Foreman
$89.09
$91.69
$2.60
Journeyman - Welder /Fitter
$80.25
$82.63
$2.38
Apprentice - Fifth Year
$67.68
$69.93
$2.25
SHORLINE (Local 250)
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Foreman
$93.31
$95.42
$2.11
Journeyman (Welder /Fitter)
$90.31
$90.31
$0
Welder /Helper
$50.30
$52.41
$2.11
Pre - Helper
$29.96
$30.68
$.72
UTILITY
2008 Hourly
Rates
2009 Hourly Rates
Hourly Rate
Increase
Operator Foreman
N/A
$87.94
N/A
Foreman
$63.47
$66.04
$2.57
Welder
$61.21
$64.52
$3.31
Journeyman /Fuser
$52.57
$55.70
$3.13
Pipe Tradesman II
$40.22
$42.29
$2.07
ELECTRICIANS / INSIDE WIREMAN
2008 Hourly
Rates
2009 Hourly Rates
Hourly Rate
Increase
General Foreman
$97.65
$103.51
$5.86
Foreman
$90.42
$95.95
$5.53
Journeyman
$83.18
$88.40
$5.22
Apprentice -10`h Period (85 %)
$72.07
$76.64
$4.57
PROJECT MANAGEMENT
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Project Manager
$106.33
$111.65
$5.32
Superintendent
$95.40
$100.17
$4.77
Project Engineer
$74.04
$77.75
$3.71
BACK HOES
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
AUGER
$20
$20
$0
Accessory - Compaction Wheel Excavator
$40
$40
$0
Accessory - Compact Wheel F /Case -1D
$20
$20
$0
Accessory - Hydraulic Breaker / Case & JD
$50
$50
$0
Vibratory Plate
$40
$40
$0
- Tractor Mou nted
$20
N/A
N/A
MAccessory
k Wheel
$75
$75
$0
D 310
$39.88
$39.88
$0
$41.88
$41.88
$0
ack Mounted
$111.25
$111.25
$0
CAT 345 -Track Mounted
$141.25
$141.25
$0
CAT 416
$37.88
$37.88
$0
JD 710
$45.88
$45.88
$0
COMPACTION EQUIPMENT
2008 Hourly Rates
1 2009 Hourly Rates
Hourly Rate Increase
Arrow (Hydro Hammer) / Stomper
$44
$44
$0
Wacker Tamper
$23
$23
$0
Sheeps Foot -Tow Behind (Vibrating)
$16
$16
$0
COMPRESSORS w /90 LB. Breaker, Clay Spade
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Compressor 125- 185CFM
$21
$21
$0
Compressor - Air, Portable (Per Day Rate)
$104
$104
$0
CRANES
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Boom Truck -8 Ton
$3175
$33.75
$0
Boom Truck -10 -11 Ton
$48.75
$48.75
$0
Boom Truck -14 Ton
$52.75
$52.75
$0
Boom Truck 23 -25 Ton
$57.75
$57.75
$0
Crane - RT / 15 -18 Ton (or equivalent)
1 $59.75
$59.75
$0
DOZERS / SIDEBOOMS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Dozer JD 450
$43.13
$43.13
$0
Sideboom CAT D -6
$57.13
$57.13
$0
Sideboom CAT D -7
$66.13
$66.13
$0
Sideboom CAT 561
$63.13
$6113
$0
Sideboom CAT 572
$78.13
$78.13
$0
Sideboom JD 450 1
$41.13
1 $41.13
$0
FORKLIFTS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Forklift - Hyster 20,000 LB
$34.88
$34.88
$0
Forklift - Lion 6,000 LB
$22.88
$22.88
$0
LOADERS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Mini Skid Steer - Ditch Witch
N/A
$26.88
N/A
Loader - Bobcatw /Bucket
$26.88
$26.88
$0
Loader - Bobcatw /Sweeper
$36.88
$36.88
$0
Loader- Bobcat w/ Grinder
$56.88
$56.88
$0
Rubber Tire Loader -544 JD
$45.75
$45.75
$0
Rubber Tire Loader -930 CAT
$47.75
$47.75
$0
Rubber Tire Loader -950 CAT
$58.75
$58.75
$0
Rubber Tire Loader - 950E /F CAT
$6935
$69.75
$0
Rubber Tire Loader- 968 CAT
$64.75
$64.75
$0
Skip loader- Case 580 / MF 40E / F
445
$31.88
$31.88
$0
4
ROAD EQUIPMENT
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Cable Dolly - One Reel (Trailer Mounted)
$12
$12
$0
Cable Dolly -Three Reel (Trailer Mounted)
$25
$25
$0
Flashing Arrowboard -(4 Hr. Min)
$17
$17
$0
Grader - CAT 140
$81.75
$81.75
$0
Grinder /Cold Planer(Bitelli)- (4hr.min)
$228
$228
$0
Roller - (Ride On)
$29
$29
$0
Roller (Walk Behind) -1 Ton Vibrator
$23
$23
$0
Roller Trailer
$12
$12
$0
Tilt Trailer
$12
$12
$0
Trencher Trailer
$12
$12
$0
Utility Trailer
$12
$12
$0
Zipper Pavement Grinder (Perdayrate)
$375
$375
$0
Asphalt Paver- Lee Boy 1000D
$113.75
$113.75
$0
Cement Saw - Walk Behind
$33
$33
$0
TRUCKS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
2 -3 Ton Lube Truck
$16.25
$16.25
$0
5 Yard (Flat bed or Bobtail) Dump / 2 -3 Utility Truck
$22.75
$22.75
$0
Back Hoe Mover Truck
$19.75
$19.75
$0
Cement Truck w/ mixer and compressor
$53.75
$53.75
$0
Dump Truck 10 Wheeler
$30.75
$30.75
$0
Equipment Trailer - 20,OOOLB
$14
$14
$0
Equipment Trailer - 40,000 LB
$16
$16
$0
Flat Bed with Lift
$21.75
$21.75
$0
Flat Bed with Mixer/ Dump
$53.75
$53.75
$0
Lowbed Trailer w /tractor& move permitfees
$44.75
$44.75
$0
Lowside End Dump Trailer w/ Tractor
$41.75
$41.75
$0
Pickup Trucks - Misc. Tools not Included
$15.25
$15.25
$0
Pick -up- Rental Number
$15.25
$15.25
$0
ServiceTruck - Misc.ToolsnotIncluded
$17.25
$17.25
$0
Service Van - Misc. Tools not Included
$15.25
$15.25
$0
Test Pump Truck
$78.75
$78.75
$0
Test Trailer (Hyprostatic)
$32
$32
$0
Utility Vehicle (Non- Hwy)
$22.25
$22.25
$0
Water Truck - (1,500-2,000 Gals.)
$3175 1
$33.75
$0
Water Truck- (3,500 Gals.)
$38.75
$38.75
$0
Winch Truck 1
$28.75
$28.75 1
$0
MISCELLANEOUS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
Boring Machine Hydraulic
$25
$25
$0
Bore Machine Trailer
$10
$10
$0
Tap Machine (Water lines 30-12") (per inch/ per day)
$30
$30
$0
Tap Machine (Water lines up to r(per inch/ per day)
$20
$20
$0
WELDERS
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate Increase
200 AMF —Truck Mounted
$29.25
$29.25
$0
200 AMF, Skid Mounted or Trailer
$16.25
$16.25
$0
Welder— Rig Rental Number
$29.25
$29.25
$0
Fabrication Shop & Equipment
$90
$90
$0
MISCELLANEOUS
2008 Daily Rates
2009 Daily Rates
Daily Rate Increase
Additional 1 Torque Head for Hydraulic Torque
Wrench
$50
$50
$0
Air Hose %x 50'
$8
$8
$0
Air Saw
$50
$50
$0
Air Tamper
$35
$35
$0
Asphalt Spreader Bar
$125
$125
$0
Barricades
$2.50
$2.50
$0
Beveling Band 14 " -20"
$75
$75
$0
Beveling Band 24 " -42"
$100
$100
$0
Beveling Band 4 " -12"
$50
$50
$0
Beveling Machine 14 " -20"
$75
$75
$0
Beveling Machine 24 " -42"
$100
$100
$0
Beveling Machine 4" -12"
$42.50
$42.50
$0
Boring Machine — Case Hydra
$160
$160
$0
Bore Motor
$10
$10
$0
Boring Machine 1 -%" & 1%" (Accu - punch)
$15
$15
$0
Boring Machine 4 " -8" (Accu- punch)
$25
$25
$0
Boring Machine 32" (Accu - punch)
$20
$20
$0
Buffer & Grinder
$25
$25
$0
Builder Level —AC -2X Nikon
$25
$25
$0
Cement Mixer
$43
$43
$0
Chain Link Fence Panels
$3
$3
$0
Chain Saw 16" (Includes Blades)
$50
$50
$0
Chipping Gun (Plus Steel)
$35
$35
$0
Clay Spade (Plus Steel)
$35
$35
$0
Cleaning Ball
$10
$10
$0
Com -a -long /Chain
$15
$15
$0
MISCELLANEOUS (cont'd)
2008 Daily Rates
2009 Daily Rates
Daily Rate Increase
Concrete Finisher
$125
$125
$0
Concrete Vibrator
$40
$40
$0
Construction Signs
$4
$4
$0
Crossing Plates
$6.25
$6.25
$0
Cut Off / Chop Saw (Includes Blades)
$53
$53
$0
Dead Weight Tester
$60
$60
$0
Delineators
$2.50
$2.50
$0
Drill Motor Y2"
$20
$20
$0
Drill Motor 3/4,;
$25
$25
$0
Dry Rod Oven — Portable
$25
$25
$0
Duct Rod
$30
$30
$0
Emulsion Pot Sprayer
$60
$60
$0
Floodlight Trailer (Mercury vapor Lights)
$125
$125
$0
Flow Liner
$25
$25
$0
Fusion Machine 4 -12" Macelroy
$200
$200
$0
Generator (3.5- 5 KW)
$53
$53
$0
Generator (75 KW)
N/A
$75
N/A
Heat Tracer
$25
$25
$0
Heater
$25
$25
$0
Holiday Detector
$25
$25
$0
Hydraulic Star Cutter
$100
$100
$0
Impact Gun 1"
$25
$25
$0
Impact Gun W
$15
$15
$0
Impact Gun %"
$20
$20
$0
Impact Wrench 1"
$35
$35
$0
Ladder
$10
$10
$0
Laser Level
$75
$75
$0
Leaf Blower
$25
$25
$0
Light Stand
$15
$15
$0
Manhole Blower
$43
$43
$0
Pavement Breaker/ Jackhammer
$35
$35
$0
Pipe Bender 5" Greenlee
$100
$100
$0
Pipe Bender Machine 6 -20"
$400
$400
$0
Pipe Bender Shoes/ 1082 Bender
$1,165 weekly
$1,165 weekly
$0
Pipe Cutter— Rigid Soil
$15
$15
$0
Pipe Cutter Lineup Clamp 16' -36"
$50
$50
$0
Pipe Cutter Lineup Clamp 8 " -14"
$25
$25
1 $0
Pipe Locator
$25
$25
$0
Pipe Locator— Metrotech
$40
$40
$0
Pipe Pusher/ Grundoram- Hercule
$600
$600
$0
MISCELLANEOUS (cont'd)
2008 Daily Rates
2009 Daily Rates
Daily Rate Increase
Pipe Tongs (4 ", 6 ", 10 ", 12 ^, 16", 18 ", 20 ")
N/A
$50
N/A
Plywood'' /, Replacement Cost
$3
$3
$0
Pneumatic /Hydrau Torque Wrench
$150
$150
$0
Portable Band Saw
$35
$35
$0
Power Threader
$85
$85
$0
Pressure Washer Trailer Mount.
$160
$160
$0
Pump —Skid Mount Bentonite
$107
$107
$0
Pump — Submersible
$27
$27
$0
Rigid Roll Groover
$30
$30
$0
Rivet Buster / Ripping Gun
$50
$50
$0
Rock Drill
$35
$35
$0
RockSeparator— Grizzly
$85
$85
$0
Rotary Hammer (Plus Steel)
$50
$50
$0
Sandblaster— Unit (with accessories)
$125
$125
$0
Sawzall
$15
$15
$0
Shoring Lumber 3" x 12" x 14"
$3
$3
$0
Shoring Lumber 8" x 8" x 8"
$3
$3
$0
Skill Saw (Includes Blades)
$20
$20
$0
Tap Machine— T. D. Williamson(up to 3 ")
$100
$100
$0
Tar Pot
$50
$50
$0
Test Plug
$10
$10
$0
Test Pump 200LB: 400 LB. Sprague
$125
$125
$0
Test Pump 5,000 LB. Trailer Mounted
$187
$187
$0
Test Pump High Pressure
$125
$125
$0
Test Pump Portable 2001b
$80
$80
$0
Testing Table
$60
$60
$0
Traffic Cones
$2.50
$2.50
$0
Transit — Theolite
$35
$35
$0
Trench Box — 6'x10'
$200
$200
$0
Trench Box- 4'x10'
$130
$130
$0
Trench Jack (Screw)
$4
$4
$0
Trench Jack (Hydraulic)
$20
$20
$0
Trencher
$125
$125
$0
Tri -Vise
$25
$25
$0
Vibrator Plate
$91
$91
$0
Walkie Talkies (Set of 2)
$25
$25
$0
Water Hose 1 %" x 50'
$6
$6
$0
Water Hose 2'/:" x 50'
$7.50
$7.50
$0
Water Pump 2" Portable
$53
$53
$0
Water Pump 3" Portable
$80
$80
$0
MISCELLANEOUS (cont'd)
2008 Daily Rates
200$509 Daily Rates
Daily Rate Increase
Weedeater
$50
$50
$0
Whalers Hydraulic
$300
$300
$0
Winch 10 Ton (Grundo)
$300
$300
$0
SAFETY AND HAZMAT EQUIPMENT
2008 Daily Rates
2009 Daily Rates
Daily Rate Increase
Explosimeter
$50
$50
$0
4 Way Gas Monitor
$100
$100
$0
Multi -Gas Detector/ PID
$100
$100
$0
Air Supply Unit
$50
$50
$0
Escape Air Pack
$2S
$25
$0
H2S Monitor
$15
$15
$0
Hazmat Suit -Tyvek
$8
$8
$0
Hazmat Trailer
$20
$20
$0
Respirator - Half /Full Mask
$5
$5
$0
SCBA -Self contained
$40
$40
$0
SCBA Cylinder -extra
$25
$25
$0
Tripod With Winch
$100
$100
$0
Expended 7/2008 - 6/2009
Utilities Department
Nothing expended.
GO CONSTRUCTION, INC.
Position
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase /Decrease
Laborer Grading
$51.55
$49.81
-$1.74
Laborer Sewer
$52.70
$50.16
-$2.54
Laborer Water
$51.65
$49.44
-$2.21
Pipelayer Grading
$55.09
$53.24
-$1.85
Pipelayer Sewer
$56.33
$53.61
-$2.72
Pipelayer Water
$55.19
$52.83
-$2.36
Operator Grading
$65.32
$67.92
-$2.60
Operator Sewer
$66.20
$68.43
-$2.23
Operator Water
$65.92
$68.60
-$2.68
Foreman Grading
$67.82
$70.43
$2.61
Foreman Sewer
$68.74
$70.97
$2.23
Foreman Water
$68.46
$71.15
$2.69
Equipment
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Foreman Pick Up Truck
$15
$19
$4
Crew Truck
$30
$34
$4
10 Wheeler Dump Truck
N/A
$80
N/A
Super 10
N/A
$86
N/A
Bottom /Semi End Dump
N/A
$91
N/A
Low Bed Rate
N/A
$110
N/A
Skiploader
$125
$125
$0
Bobcat
N/A
$30.75
N/A
446D Backhoe /Loader
$145
$150
$5
555E Backhoe /Loader
$135
$135
$0
New Holland Backhoe /Loader
$135
$135
$0
936 Wheel Loader
$140
$145
$5
CAT 950 Loader
$140
$145
$5
CAT 950 E Loader
$145
$150
$5
JD 450 With Board
N/A
$150
N/A
CAT 307 Excavator
$140
$150
$10
CAT 313 Excavator
$160
$170
$10
CAT 325 Excavator
$185
$192
$7
CAT 321CLCR Excavator
$175
$185
$10
CAT 235D Excavator
$220
$220
$0
KobelCo SK300 LCiV Excavator
N/A
$200
N/A
Asphalt Zipper
$250
$250
$0
Compaction Wheel
$25
$25
$0
Equipment (cont'd)
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Hydraulic Breaker
$43
$48
$5
Zieman Trailer
$18
$18
$0
Equipment
2008 Daily Rates
2009 Daily Rates
Daily Rate Increase
Ring O Matic Pot Holing Machine
$400
$400 or $80 Hr
$0
Arrowboard
$98
$98
$0
Water Truck
$265
$160
-$105
Compressor
$152
$152
$0
Compressorw /Jackhammer
$228
$228
$0
2000 Multiquip Towable Generator
$205
$205
$0
Light Tower
$92
$92
$0
Wacker
$92
$92
$0
4" Trash Pump & Hoses
$92
$92
$0
6x16 Trench Box
$72
$82.50
$10.5
416 Trench Box
$72
$55
-$17
8x24 Trench Box
$168
$180
$12
Utilities Department
Amount Expended 7/2008- 6/2009
Pirate Road Curb Replacement (extra work)
Big Canyon Golf Course (emergency repair)
PCH & Dover
Total
S 822.86
$
7,124.38
$
3,542.15
$
11,489.39
VALVERDE CONSTRUCTION, INC.
Position
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase /Decrease
Carpenter
$59.49
$60.51
$1.02
Cement Masons
$57.92
$59.74
$1.82
Laborer Foreman C2 (Tapia)
$53.27
$54.27
$1
Laborer FOREMAN 1A (Ortiz, Carreon)
$60.26
$61.26
$1
Laborer FOREMAN (Montano)
$51.53
$52.53
$1
-1
FOREMAN 3 (i.R. Munoz)
$62.99
$63.99
$1
Gen. Laborer Group 1
$50.36
$51.36
$1
Pipelayer Group 4
$53.58
$54.58
$1
Pipelayer Group 5
$54.01
$55.01
$1
Group 10C (Mike Valverde)
$67.99
$68.81
$0.82
Group 8
$67.13
$69.83
$230
Group 9 (Jerry Lewis)
$69.12
$71.82
52.70
Gen Fore. (San Diego - R. Roybal)
$53.23
$54.60
$1.37
FOREMAN (Wayne Shirley)
$59.71
$60.68
$0.97
FOREMAN (B. Dosek)
$57.28
$58.25
$0.97
Teamster TRUCK DRIVER SPECIAL
$57.94
$58.91
$0.97
Teamster TRUCK DRIVER
$55.51
$56.48
$0.97
Equipment - Arrowhoards
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Wanco Solar Arrowboard
$9.38
$9.38
$0
National Signal Message Board
$9
$9.45
$.045
Equipment - Backhoes
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Caterpillar 416C Backhoe
$41.15
$47.30
$6.15
CASE 590L Backhoe
$44.91
$51.92
$7.01
CAT Backhoe 430D
$35.89
$41.59
$5.70
CAT Backhoe 4468
$56.60
$64.96
$8.36
CAT Backhoe 420D
$40.15
$47.11
$6.96
CASE 5905 Backhoe
$44.91
$51.92
$7.01
Equipment - Compressors
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
CompAir 4175 Compressor
$15.98
$19.37
1 $3.39
Equipment - Forklifts
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
CAT DP40K -D
$47.80
1 $55.81
$8.01
Equipment - Loaders
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
John Deere 544H Loader
$55.45
$64.77
$9.32
John Deere 444H Loader
$50
$54.72
$4.72
CASE 570 LXT 4WD Loader
$32.70
$38.37
$6
Equipment - Light Towers
2008 Hourly Rates
1 2009 Hourly Rates
Hourly Rate
Increase
ALLMAND NLPKFMXZ Light Tower
$11.25
$11.81
$0.56
ALLMAND NL PRO
$11.25
$11.81
$0.56
Equipment - Pumps
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
GRIFFIN 6" Trash Pump
$25.67
$29.69
$4.02
PT3A 3"
$18.36
$21.94
$3.58
MULTIQUIP QP -40T" 4'
$21.74
$25.44
$3.70
GRIFFIN 8" Diesel Pump
$25.67
$29.69
$4.02
HYPRO Y." 5210C -R Test Pum0p
$15.63
$16.41
$0.78
Equipment - Rollers /Compaction
Wheels
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
CATERPILLAR CB224C Roller
$29.63
$33.59
$3.96
CATERPILLAR 214C Roller
$27.50
$29.44
$1.94
I/ R SD40FD Compaction Roller
$49.63
$55.29
$5.66
Equipment - Trucks
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
1993 Ford F -250
$20.39
$21.41
$1.02
2003 Chevy 52500 PU
$20.39
$21.41
$1.02
2003 Dodge 1500
$20.39
$21.41
$1.02
2007 Ford F -150 XCAB
$20.39
$21.41
$1.02
1994 Ford F -250
$20.39
$21.41
$1.02
1997 Ford F -150
$20.39
$21.41
$1.02
2008 Dodge Ram 2500 Reg. Cab
N/A
$24.43
N/A
2008 Ford F -250 Reg. Cab
N/A
$24.43
N/A
Equipment - Trucks - (cont'd)
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
1997 Ford F -250
$25.18
$26.44
$1.26
2003 Ford F-3SO +welder+ compressor
$34.32
$36.04
$1.72
2008 Ford F-450 +welder+ compressor
N/A
$40.67
N/A
1997 Ford Super Duty Truck
N/A
$29.95
N/A
2003 Ford F-550 + welder + compressor
N/A
$43.02
N/A
89' Ford 5 -6 Yard Dump Truck
$42.53
$50.46
$7.93
97' Ford LT9513 10 Whl Dump Truck
$55.71
$64.77
$9.06
87' GMC C7 5 -6 Yard Dump Truck
$42.53
$50.46
$7.93
Trailer 2 Axle -8 Tire
$15.76
$16.24
$0.48
Equipment -Vibrator Plates
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Wacker
$8.75
1$8.75
$8.75
$0
Multiquip
$8.75
$8.75
$0
Wacker Diesel
$8.75
$25
$0
Equipment - Water Trucks
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
Ford 1800 Gallon Water Truck
$40.65
$46.90
$6.25
Independent Wet Bore 2927
$25
$25
$0
1/R Wet Bore 44SL
$25
$25
$0
3 " -12" Hot Tap Machine
$25
$26.25
$1.25
Asphalt Zipper
$80.43
$87.17
$6.74
Dynamation Gas Detector 929A
$18.75
$18.75
$0
Lee Boy Tack Sprayer
$18.75
$19.69
$0.94
Meco 35HP Concrete Saw
$16.14
$17.70
$1.56
AP 25 Ventilation Blower
$9.26
$9.26
$0
AP 12 Ventilation Blower
$7.86
$7.86
$0
Lee Boy L150 Tack Sprayer
$37.50
$39.38
$1.88
Arrow Hammer HJ1250R
$7.03
$7.03
$0
Rivet Buster
$6
$6
$0
Cones /Delineators
$.035 Per Day /Ea
$.035 Per Day /Ea
$0
Powder Puff (60 lbs.)
$4.75
$4.75
$0
Signs
$4 Per Day
$4 Per Day
$0
90# Jackhammer
$435
$4.75
$0
60# Jackhammer
$4.75
$4.75
$0
Clay Spade
$6.56
$6.56
$0
High Level Flag Tree
$6
$6
$0
Equipment - Miscellaneous - (cont'd)
2008 Hourly Rates
2009 Hourly Rates
Hourly Rate
Increase
3" & 4" Trash Pump
$18.36
$21.94
$3.58
Sawtruck & Saw (1500 GVW, 35HP)
$25.18
$29.95
$4.77
Gang Truck (15,000 GVW)
$27
$29.95
$2.95
Generator 16.5 KW)
$11.25
$11.81
$0.56
Blower w /Hose
$6.63
$6.63
$0
2" Trash Pump (1260 GPH)
$4.27
$5.09
$0.82
2" Submersible Pump (1260 GPH)
$4.27
$5.09
$0.82
50' Air Hose
$1
$1
$0
Cutoff Saw
$3.06
$3.21
$.15
50' Fire Hose 2' /:"
$.095
$.095
$0
Confined Space Package
$4.20
$4.20
$0
Chipping Gun (25 Ibs)
$5.25
$5.25
$0
Rotor Hammer
$6.50
$6.50
$0
Generator 45 KW KVA
$15.31
$16.08
1 $0.77
Barricade w /Flasher Lite
$.044 Per Day /Ea
$.044 Per Day /Ea
$0
18" & 24" Mounted Compactor Wheel
N/A
$1.95
N/A
Utilities Department
No Expenditures - 7/2008- 6/2009
C!