Loading...
HomeMy WebLinkAbout13 - Peninsula Point Water and Sewer ImprovementsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 13 September 8, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Alfred Castanon, Associate Civil Engineer 949 - 644 -3314 or acastanon @newportbeachca.gov SUBJECT: PENINSULA POINT WATER AND SEWER IMPROVEMENTS — AWARD OF CONTRACT NO. 4066 Recommendations: 1. Approve the project plans and specifications. 2. Award Contract No. 4066 to Paulus Engineering, Inc. for the Total Bid Price of $1,415,079, and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $141,000 to cover the cost of unforeseen work. Discussion: At 10:00 a.m. on August 25, 2009, the City Clerk opened and read the following bids for this project: The low total bid amount is 20 percent below the Engineer's Estimate of $1,778,450. The disparity between the estimate and the actual bid prices reflect a more favorable construction market. The low bidder, Paulus Engineering, Inc., possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the Contractors references indicates they have satisfactorily completed similar projects for other municipalities. BIDDER TOTAL BID AMOUNT Low Paulus Engineering, Inc. $1,415,079.00 2 GCI Construction, Inc. $1,454,085.00 3 Mike Bubalo Construction Company, Inc. $1,463,697.69 4 Southern California Pipeline Construction, Inc. $1,613,600.00 5 Steve Bubalo Construction Company, Inc. $1,628,720.00 6 J. De Sigio Construction, Inc. $1,730,915.00 7 Boudreau Pipeline Corporation $1,842,510.00 8 Garcia Juarez Construction, Inc. $2,104,000.00 The low total bid amount is 20 percent below the Engineer's Estimate of $1,778,450. The disparity between the estimate and the actual bid prices reflect a more favorable construction market. The low bidder, Paulus Engineering, Inc., possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the Contractors references indicates they have satisfactorily completed similar projects for other municipalities. Peninsula Point Water and Sewer Improvements —Award of Contract No. 4066 September S, 2009 Page: 2 On July 28, 2009, Underground Utilities Assessment District (AD) 103 was approved by property owners to underground the overhead utility lines in the Peninsula Point Community. This water and sewer main improvement project was designed, scheduled and bid contingent on the passing of AD 103. When feasible, the City coordinates the maintenance and upgrading of water and sewer infrastructures and alley repaving with the timing of the utilities assessment districts. This allows the City to minimize impacts to adjacent homeowners. This project provides for the replacement of damaged and deteriorated water and sewer mains at Peninsula Point. The work also includes enlargement of mains and betterments to improve both operational efficiency and fire protection capabilities of the water system. Pursuant to the Contract Specifications, the Contractor will have 120 consecutive working days to complete the work. Environmental Review: This project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementing Guidelines. This exemption covers the repair and maintenance of existing facilities. Public Notice: The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Prior to starting work, two City prepared notices will be distributed by the contractor to adjacent residents and businesses. The first notice will be distributed ten days before work and the second notice 48 hours prior to starting work in the area. Geotechnical Services: In addition to the contract costs, approximately $17,400 in consulting geotechnical services is estimated for this project and will be performed under the on -call professional services agreement with Harrington Geotechnical Engineering, Inc. Funding Availability: There are sufficient funds available in the following accounts for the project: Account Description Account Number Amount Water Enterprise 7511- C6002007 $1,488,659.00 Wastewater Enterprise 7531- C7001002 $85,820.00 Total: $1,574,479.00 Peninsula Point Water and Sewer Improvements —Award of Contract No. 4066 September 8, 2009 Page: 3 Proposed uses are as follows: Vendor Paulus Engineering, Inc. Paulus Engineering, Inc. Harrington Geotechnical Various Prepared by: * 0 ** Alfreb Castanon Associate Civil Engineer Attachments: Project Location Map Purpose Construction Contract Construction Contingency Geotechnical Testing Printing and Incidentals Total Submitted by: Amount $1,415,079.00 $141,000.00 $17,400.00 $1,000.00 $1,574,479.00 K i Oe ti Al PENINSULA POINT WATER AND SEWER IMPROVEMENTS LOCATION MAP CHANNELRD. 4f SCALE. fv 7, s am PROJECT LOCATIONS CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT IAT108/06/09 I SCALE N.T.S ISHT I OF DRAWN TM I C-4066 I