HomeMy WebLinkAbout08 - Zone III Pump Station Variable Frequency Drive (VFD) Replacement — NOC for Contract No. 6278 (Project No. 16W16)�EWPR CITY OF T - z NEWPORT BEACH <,FoR�P City Council Staff Report September 13, 2016 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Ben Davis, Associate Civil Engineer, bdavis@newportbeachca.gov PHONE: 949-644-3317 TITLE: Zone III Pump Station Variable Frequency Drive (VFD) Replacement — Notice of Completion for Contract No. 6278 (Project No. 16W16) ABSTRACT: On December 8, 2015, City Council awarded Contract No. 6278 (16W16), Zone III Pump Station Variable Frequency Drive (VFD) Replacement project to Industrial Power and Automation, Inc. of Temecula, California. The work is now complete and staff requests City Council acceptance and contract close out. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. (At the December 8, 2015 meeting, this project was found to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after the acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following account: Account Description Water Enterprise Fund Account Number 70101-980000-16W16 Total: Amount $ 141,160.00 $ 141,160.00 8-1 DISCUSSION: Zone III Pump Station Variable Frequency Drive (VFD) Replacement Notice of Completion for Contract No. 6278 (Project No. 16W16) September 13, 2016 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $129,500.00 $141,160.00 10% or less +9.0% +9.0% 0.0% Allowed Contract Time + 150 Actual Time -75 Approved Extensions days) = Under (-) or Over (+) The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original bid amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final contract cost: $129,500.00 $129,500.00 $ 11,660.00 $141,160.00 VFDs are essential motor control devices for pumps which allow the motors to operate at variable speeds resulting in significant energy savings. The ability to operate motors at variable speeds, as opposed to a simple on/off function, allows the City to only use as much energy as required to match demand, which reduces the amount of wasted energy. In addition to energy savings, the life of pump impellers, bearings and seals are greatly improved with the addition of VFDs. Located at the City's Big Canyon Reservoir (BCR) site, the Zone III Pump Station provides potable water to businesses and residents in the higher elevation areas of the City which is generally located east of Jamboree Road and north of East Coast Highway. The majority of the City's water supply comes from local underground water that is pumped from the Orange County aquifer and is stored at BCR. Water is then pumped again from BCR to higher elevation areas (Zones III, IV and V). The City also has several Metropolitan Water District (MET) connections which allows us to purchase imported water from MET. Although these connections with MET improved our overall water system reliability and redundancy, water purchased from MET is approximately three (3) times the cost of pumped groundwater. The project successfully replaced two 300 horsepower VFD's that had reached their end of life, started having serious service issues and were in need of immediate replacement. The first VFD was replaced and operational by May 10 and the second VFD was operational on June 10. During the project and at the request of maintenance staff, staff directed changes to the installation that will ensure the new VFD's relay panels and switches are compatible with other VFD's in the City, thus saving future costs on parts and maintenance. These contract adjustments resulted in the final 8-2 Zone III Pump Station Variable Frequency Drive (VFD) Replacement Notice of Completion for Contract No. 6278 (Project No. 16W16) September 13, 2016 Page 3 contract cost coming in approximately $11,660 or 9.0 percent above the original bid amount. Having these two new VFDs in operation has greatly improved the reliability, performance and redundancy of this critical Zone III Pump Station. A summary of the project schedule is as follows: Estimated Completion Date per Baseline Schedule November 14, 2016 Project Awarded for Construction December 8, 2015 Notice to Proceed April 12, 2016 Actual Substantial Construction Completion Date July 27, 2016 The project was substantially completed as of July 27, 2016. The baseline schedule had ten weeks of time included to account for long lead times for manufacturing and shipping of the VFDs. The VFDs were ordered in January so this time turned out to be redundant. Some miscellaneous close-out items, operation and maintenance turnover, and post -substantial completion activities have been finalized prior to this Notice of Completion action. ENVIRONMENTAL REVIEW: At the December 8, 2015 City Council meeting, the project was found to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(c) (Reconstruction of existing facility involving negligible or no expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A — Location Map 8-3 a 0 PROJECT '- LOCATION D ATTACHMENT A BIG CANYON RESEVOIR O 9Q ti� l4 S /? DN.T.S. ZONE III PUMP STATION VARIABLE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT FREQUENCY DRIVE (VFD) REPLACEMENT LOCATION MAP C-6278 9/13/16 8-4