HomeMy WebLinkAbout26 - Big Canyon Restoration and Water Quality Improvement Project — Award of Construction Contract No. 8111-1 (15X12)TO:
FROM:
CITY OF
NEWPORT BEACH
City Council Staff Report
September 13, 2016
Agenda Item No. 26
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Robert Stein, Assistant City Engineer, rstein newportbeachca.gov
PHONE: 949-644-3322
TITLE: Big Canyon Restoration and Water Quality Improvement Project —
Award of Construction Contract No. 8111-1 to Environmental
Construction, Inc. (15X12)
ABSTRACT:
Staff has received acceptable construction bids for the Big Canyon Restoration and
Water Quality Improvement Project and requests City Council approval to award the
construction contract to the low -bidder, Environmental Construction, Inc. (ECI).
RECOMMENDATIONS:
a) Approve the project drawings and specifications (On May 10, 2016, City Council
adopted Resolution No. 2016-58, A Resolution of the City Council of the City of
Newport Beach adopting Mitigated Negative Declaration No. ND2016-001 (SCH#
2016031011) for the Big Canyon Habitat Restoration & Water Quality Improvement
Project (PA2016-046), pursuant to California Environmental Quality Act, State CEQA
Guidelines and City Council Policy K-3);
b) Award Contract No. 8111-1 to ECI for the total bid price of $1,782,230.00, and
authorize the Mayor and City Clerk to execute the contract,
c) Establish a ten percent contingency of $178,000 to cover the cost of unforeseen
work not included in the original contract,
d) Authorize the City Manager to execute a Reimbursement Agreement with Orange
County Sanitation District (OCSD) for its contribution of $15,000 to the project on a
form approved by the City Attorney, and
e) Approve Budget Amendment No. 17BA-_ recognizing a reimbursement from OCSD
in the amount of $15,000 and appropriating $15,000 to Account No. 01201-980000-
15X12 for Big Canyon Restoration project.
26-1
Big Canyon Restoration and Water Quality Improvement Project — Award of
Construction Contract
September 13, 2016
Page 2
FUNDING REQUIREMENTS:
Upon approval of the budget amendment, the current adopted budget includes sufficient
funding for this contract. Proposed uses are:
Vendor
Purpose
Amount
ECI
Construction Contract
$1,782,230.00
ECI
Construction Contingency
178,000.00
On-call Geotechnical
Geotechnical Services
10,000.00
On-call Structural Inspection
Inspection of reinforced
concrete structures
5,000.00
SCE
Power Line Extension
9,340.83
Specialty Vendors
Interpretive Signs
30,000.00
Burns & McDonnell
Construction Services /
Biological Monitoring
61,111.00
Andy Salas, Gabrieleno Band
of Mission Indians
Tribal Monitoring
10,200.00
Various
Incidentals
1,118.17
Total
$2,087,000.00
Project costs will be expensed to:
Account Description
Account Number
Amount
Measure M Competitive
1230052-980000-15X12
$1,432,780.00
Contributions
13501-980000-15X12
529,220.00
OCSD Reimbursement
01201928-980000-15X12
15,000.00
General Fund
01201928-980000-15X12
32,000.00
General Fund
01201926-980000-17D11
78,000.00
6
Total
$2,087,000.00
DISCUSSION:
At 11 a.m. on August 23, 2016, the following nine bids were submitted through Planet
Bid:
26-2
Bidder
Bid
1
Environmental Construction, Inc.
$ 1,782,230.00
2
Sukut Construction LLC
$ 1,898,398.00
3
Lonerock, Inc.
$ 1,945,514.50
4
Rockforce Construction
$ 1,978,955.00
5
Kiewit Infrastructure West Co.
$ 2,017,644.20
6
Spectrum Construction Group, Inc.
$ 2,080,482.42
7
Metro Builders & Engineers Group, Ltd.
$ 2,398,715.74
8
YAKAR
$ 2,416,955.00
9
C.S. Legacy Construction, Inc.
$ 2,774,912.80
26-2
Big Canyon Restoration and Water Quality Improvement Project — Award of
Construction Contract
September 13, 2016
Page 3
The total low bid amount is 6% below the Engineer's Estimate of $1,900,000. The low
bidder, Environmental Construction, Inc. (ECI), possesses both California State
Contractors License Classifications "A" and "C-27" as required by the project
specifications. A meeting was conducted with the ECI on August 24, 2016 and a check
of the Contractor's references indicates they have satisfactorily completed similar
projects for other municipalities.
This Big Canyon Restoration and Water Quality Improvement Project has been a long
standing goal for the City and community. Over the years, Public Works has assembled
grant and other funds which will now allow the City to improve water quality and restore
a portion of the canyon which outlets into the upper Newport Bay. Public Works staff
has also prepared the necessary environmental documents, plans and specifications,
and secured permits so that this first improvement project is now ready for the
construction.
Project features include improvements to water quality in Big Canyon Creek and
Newport Bay with an infiltration wetland and isolation of seepage flows with high
concentrations of selenium for diversion to the sanitary sewer, restoration of riparian
habitat by removing non-native vegetation and replanting native species, stabilizing the
creek and floodplain with engineered energy dissipation and erosion control measures,
and enhancing public access and education within the Big Canyon Nature Park with
improved trails, closure of undesired trails, and creation of diverse ecological habitats.
The work necessary to complete this contract consists of implementing erosion control
measures and performing construction surveying, clearing and grubbing, tree removals,
and grading. Construction includes temporary surface water diversions, bypass lines,
storm water drainage piping and structures to capture storm flows from Jamboree Road.
A water quality unit and a bioretention cell infiltration system will be installed along with
concrete embankment slope protection and stilling and settling basins and walls,
connection into a sanitary sewer trunk line, constructing vegetated soil revetments,
constructing a temporary irrigation system with power, performing site restoration work,
re -vegetation and hydroseeding, and installing access roads, trail ramps, and gates.
Upon completion of the construction, the contractor will perform plant establishment and
maintenance for a period of time.
Pursuant to the Contract Specifications, the contractor will have 125 consecutive
working days to complete project tasks that lie within the creek and sensitive habitat
areas, with an additional 30 days for work on upland areas close to Jamboree Road as
approved by City. Following completion of construction, there is a 120 consecutive
calendar day plant establishment and maintenance period. Construction management,
inspection and environmental monitoring will be performed by the Public Works
Department and augmented by a variety of specialized consultants. This will require
several minor professional service agreements including the design team Burns and
McDonnell.
26-3
Big Canyon Restoration and Water Quality Improvement Project — Award of
Construction Contract
September 13, 2016
Page 4
The California Coastal Commission approved the project at its August 11, 2016
meeting. Per their Coastal Development Permit conditions, the City will also need to hire
archaeological observers, under a separate contract to monitor clearing/grubbing and
grading operations.
ENVIRONMENTAL REVIEW:
On May 10, 2016, City Council adopted Resolution No. 2016-58, A Resolution of the
City Council of the City of Newport Beach adopting Mitigated Negative Declaration No.
ND2016-001 (SCH# 2016031011) for the Big Canyon Habitat Restoration & Water
Quality Improvement Project (PA2016-046), Attachment C, pursuant to California
Environmental Quality Act, State CEQA Guidelines and City Council Policy K-3.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Sheet 6 Drainage Plan from the Drawing Set
Attachment C — Resolution Adopting Mitigated Negative Declaration
Attachment D — Budget Amendment
26-4
Attachment A
r., d*N
-
�`
San
iia ed ` "%: fl e., .. - - _- r'1 �!✓ fef CIE
1 r
e
•,.�. pry. - -� 1"
*#
1 fWF
_ r �
it
_ Proj eck to abon
r••ti� 1r — +� f
e.
Big Canyon Habitat Restoration and CITY OF NEWPORT BEACH
Water Quality Improvements PUBLIC WORKS DEPARTMENT
Location Map
Project 15X12 I 5/10/16
26-5
�•
'i 5'- may' `!�••-�e
_�J' �.:
�
_ ...
�er.�
-•
—.
T
1
, tfj ems, � � 0.;•
• ,.•may +-
-
� erS�, _
�1 � #e ��
-
■�do
-0? do
Prcject 6c r-cary
L
e
H�,
Big Canyon Habitat Restoration and CITY OF NEWPORT BEACH
Water Quality Improvements PUBLIC WORKS DEPARTMENT
Location Map
Project 15X12 I 5/10/16
26-5
N
r�tl
n
I
AREA B WATER LEVEL
oaE'�ARFa4uu
,� BURNS
'\MSDONNELL
9400 WARD PKWY
KANSAS CITY, MO 64114
(816)333-9400
CONTROLSTRUCIURE
i
APPROVED
1
13
8
O
14 SY 11
7
37 LF 24" HDPE STORM PIPE.
10
1
/. _�p
�40
7
2�
01
FL = 39.25
FL = 39.00
191 LF OF CONCRETE PAD SURFACE AND
IV
---- /
PIPE ANCHOR SYSTEM PER DETAIL 1, SHEET
�\ 44
SS
6
5
/
21 S`
7
A5
-- /
PIPE OUTLET PER DETAIL 1, SHEET 9.
i
i
i
ATTACHMENT B
CULVERT OUTLET IMPROVEMENT,
,pJ T\ REFER TO SHEET 22
- ` - - t' lig g Bain
43 _
i/ O
L -F
%' FL 43.00 -
37
27
SEEP WATER DIVERSION
8 SY7 J TO SANITARY SEWER PIPE
42
/ \ (SEE DETAIL 3, SHEET 10) -
,A5 a G P
31 �- 8" X 8" X 2" TEE
26 QA.
/� 2" LINE WITH 2" CAP 31 35
V W � /
40 - 5
AO /
� 17 FL =
18 FL = 442.5015.5
�A'3 20 19 16 72 24
3'/
21
40 TOP EL = 55.00 / Y
FL (IN, EXISTING) = 50.25
FL(OUT,W)=49.25±
FL (OUT SW) =4775
2 , ioinfiltra i9on Cell
BIORETENTION 0
\ OUTLET RISER PIPE,
SEE SHEET 7 p0
AREA A WATER LEVEL
15 CONTROLSTRUCTURE
A
m
SEE SHEET 7 FOR a/
BIORETENTION
10 h DRAIN SYSTEM PLAN
X45 /
sr 145 �..,
n,
F1 = 42.00
5
7 14 SY
/
Z:ICLIENTS\ESP\NPBEACHCA\83234_BIGCYNTRTWET\DESIGNIENVIRO\REMEDIATIONICAD\CONSTRUCTION DOCUMENTS\83234_6 DRAINAGE PLANDWG 7/18/20162.04 PM KLANDRIST
/
oaE'�ARFa4uu
,� BURNS
'\MSDONNELL
9400 WARD PKWY
KANSAS CITY, MO 64114
(816)333-9400
/ CONSTRUCTION NOTES.
APPROVED
BIG CANYON RESTORATION
DRAINAGE PLAN
/ OS 24" HDPE FLARED END SECTION WITH
O
CONCRETE TOE WALL PER DETAIL 4, SHEET
/ 10.
/
37 LF 24" HDPE STORM PIPE.
i/ O
L -F
%' FL 43.00 -
37
27
SEEP WATER DIVERSION
8 SY7 J TO SANITARY SEWER PIPE
42
/ \ (SEE DETAIL 3, SHEET 10) -
,A5 a G P
31 �- 8" X 8" X 2" TEE
26 QA.
/� 2" LINE WITH 2" CAP 31 35
V W � /
40 - 5
AO /
� 17 FL =
18 FL = 442.5015.5
�A'3 20 19 16 72 24
3'/
21
40 TOP EL = 55.00 / Y
FL (IN, EXISTING) = 50.25
FL(OUT,W)=49.25±
FL (OUT SW) =4775
2 , ioinfiltra i9on Cell
BIORETENTION 0
\ OUTLET RISER PIPE,
SEE SHEET 7 p0
AREA A WATER LEVEL
15 CONTROLSTRUCTURE
A
m
SEE SHEET 7 FOR a/
BIORETENTION
10 h DRAIN SYSTEM PLAN
X45 /
sr 145 �..,
n,
F1 = 42.00
5
7 14 SY
/
Z:ICLIENTS\ESP\NPBEACHCA\83234_BIGCYNTRTWET\DESIGNIENVIRO\REMEDIATIONICAD\CONSTRUCTION DOCUMENTS\83234_6 DRAINAGE PLANDWG 7/18/20162.04 PM KLANDRIST
/
oaE'�ARFa4uu
,� BURNS
'\MSDONNELL
9400 WARD PKWY
KANSAS CITY, MO 64114
(816)333-9400
REVISIONS
APPROVED
BIG CANYON RESTORATION
DRAINAGE PLAN
NO. DATE I 13Y APPROVED
O
18" DEPTH FACING CLASS RIP RAP.
/
DESIGNED BY: DRAWN BY:
B.WEIs 1K.ANDRIST1
OS
187 LF 12" GATED PVC PIPE PER DETAIL 1,
/. _�p
SHFEf 6 OF 22
SHEET 11.
/
O
191 LF OF CONCRETE PAD SURFACE AND
---- /
PIPE ANCHOR SYSTEM PER DETAIL 1, SHEET
/
11.
/
3.5'H x 3.5'W X VD END WALL AROUND PVC
-- /
PIPE OUTLET PER DETAIL 1, SHEET 9.
41 LF OF 15" PVC PER CITY STD -106-L.
/
12
WATER LEVEL CONTROL STRUCTURES (2),
CONCRETE PAD, BOLLARDS, AND CONCRETE
-
TOP EL. = 55.00
2g
ANCHORS PER DETAIL 1, SHEET 9.
FL (IN, EXISTING, 12") = 49.07 ±
13
25 LF OF 10" PVC PER CITY STD -106-L AND 10"
y- FL (OUT, EXISTING, 12") = 48.97 ±
PVC 45° BEND.
FL (OUT, SOUTH, 8") = 48.30 ±`
/ 'MAINTAIN MIN. 8" BELOW EX FL (OUT)
14
15" X 10 PVC WYE AND 15" X 10" PVC
REDUCER.
/
15
22 LF OF 10" PVC PER CITY STD -106-L.
/
0'S
- /
16
35 LF OF 18" HDPE (SMOOTH, SOLID WALL).
-
X -: �-
40' EXISTING 12"
17
45° 18" SOLID WALL HDPE PIPE BEND.
-/=
� STORM DRAIN -
18" TO 12" HDPE PIPE REDUCER (ECCENTRIC
= +/
ri EX. FL OUT 48.71-.,-
4u:
WITH CONTINUOUS FACE ALONG FLOW LINE).
/
0." `
30 `
)
19
12" HDPE TO PVC TRANSITION.
12 LF 12" SOLID PVC (CONNECT TO 12" PVC
GATED PIPE).
�7i31
21
REINFORCED CONCRETE ENCASEMENT
32` 29
\-AROUND
450 BEND AND 18" TO 12" REDUCER.
CONCRETE SHALL EXTEND 6" FROM ALL
SIDES OF PIPE AND BEYOND JOINTS.
REINFORCEMENT CAGE SHALL BE PROVIDED
WITH #3 BARS AT 12" O.C., PROVIDING 2" CLR
ON ALL FACES, SUBMIT CAGE DETAIL FOR
/ A
N: 2176196.19 � / � � � � CONSTRUCTION NOTES, CONT.: REVIEW PRIOR TO CONSTRUCTION.
E:6066417.66 // �� 34 8" HDPE WYE (45° BEND) WITH CLEANOUT, 8" 22 92 LF OF 12" HDPE STORM PIPE.
(TO CENTER) +
50.5 FS / �w, O HDPE 45° SWEEP - WRAP CORNER WITHIN 1'
OF EDGE OF CULVERT. 23 91 LF OF 15" HDPE STORM PIPE.
C.M.P PIPE ANCHORS EVERY 10' TO 15' OF 24 46 LF OF 24" HDPE STORM PIPE.
51.75
3g TOP EL. PIPE PER DETAIL 6 ON SHEET 10, PROVIDE = -
� : `\ _ ANCHOR WITHIN 2' AT BEGINNING AND END OF 25 STORM DIVERSION BOX STRUCTURE (SW
\ / / FL (IN) = FL (OUT) = 47.00 / -- STORM DIVERSION PER DETAIL 3, SHEET 12.
A-- 1 CULVERT )
/ N: 2176165.13
/ 22 E: 6066332.89 / / 18 o REMOVE AND DISPOSE OF EXISTING 24"
_ ! TO CENTER to ooI 36 8" HDPE WYE (45° BEND) WITH CLEANOUT, 8" FLARED END SECTION.
( ) / % HDPE 450 SWEEP WRAP CORNER WITHIN 1'
L / OF EDGE OF CULVERT. 26 2' DEPTH, 12' WIDE VEGETATED TRIANGULAR
PENETRATE CONCRETE SLOPE LINING USING CHANNEL WITH 3H:1V SIDESLOPES.
(2) 8" HDPE 45° BENDS AND 1 -FOOT OF PIPE, 27 V DEPTH, 6' WIDE VEGETATED TRIANGULAR
TOP EL. = 52.30 r ��WRAP PIPE WITH 3 LAYERS OF GEOTEXTILE CHANNEL WITH 3HA V SIDESLOPES.
FL (IN, EXISTING) = 48.04b -� AT PENETRATION FOR CONCRETE
FL(OUT) = 47.94 / / - �- - CONTRACTION AND TRIM GEOTEXTILE AT 28 CLEAN WATER BYPASS STRUCTURE (60") PER
N: 2176073.94 / SURFACE AFTER LAYING CONCRETE PER CITY STD -401-L, SUBSTITUTE FRAME AND
E: 6066336.61 / ��� DETAIL 5, SHEET 10. BOLTDOWN COVER WITH NEENAH R-2668
/T. ��'B _ FRAME WITH TYPE B GRATE, WITHIN 2'
(TO CENTER)
/ j 95 38 8" HDPE 45° PIPE BEND AND CLEANOUT. OUTSIDE OF MANHOLE INSTALL 8" PUSH -ON
/ \ (SLIP-ON) GATE VALVE AND VALVE BOX
39 WATER QUALITY UNIT PER DETAIL 2, SHEET 12. COVER WITH RISER ON 8" BYPASS PIPE PER
NOTE: SUBSTITUTE STANDARD FRAME AND CITY STD -511-L. UPSTREAM END SHALL
/ p/ COVER WITH GMI 2600 COMPOSITE FRAME INCLUDE 18" DIA. STUB INTO MANHOLE AND
AND COVER (WITH LOCKS AND GASKET). 18" X 12" TRANSITION PIPE FITTING TO
CONNECT STUB TO EXISTING 12" UPSTREAM
STORM DIVERSION MANHOLE STRUCTURE (NE LINE. SUBMIT SHOP DRAWING FOR BYPASS
/ Ah DIVERSION) PER CITY STD -401-L. SAW -CUT STRUCTURE.
/ =� \ EXISTING 24" PIPE TO WITHIN 4" OF INSIDE OF
^off ph„%, MANHOLE STRUCTURE WALL (ON THE 29 8" HDPE 45° SWEEP, CORE DRILL EXISTING
/ /^\ UP -GRADIENT SIDE), REMOVE AND DISPOSE WOOD WALL FOR PIPE PENETRATION.
/ l OF EXISTING PIPE DOWN -GRADIENT.
/ 30 8" HOPE 22.5° BEND.
/I 41 12" PVC THREADED CLEAN OUT END CAP
/ (MALE BOSS), IF END CAP TRANSITION/FITTING 31 455 LF OF 8" HDPE CLEAN WATER BYPASS
IS REQUIRED PROVIDE RESTRAINED JOINT PIPE @ MINIMUM 0.5% SLOPE (ALL JOINTS AND
NORTH I FITTING OR PROVIDE ANCHOR JUST FITTINGS CONNECTED WITH BUTT FUSION
DOWNSTREAM OF FITTING BELL TO PREVENT WELDING).
JOINT SEPARATION.
32 CHANNEL BANK PIPE ANCHORS EVERY 10' TO
0 30' so' I 42 CLEAN WATER BYPASS END WALL (2.75'H x 15' OF PIPE PER DETAIL 7, SHEET 10.
/- SCALE IN FEET 2.75'W x VD) PER DETAIL 6, SHEET 9.
/ 33 8" HDPE WYE (45° BEND) WITH CLEANOUT, 8"
8" GATE VALVE WITH RISER AND VALVE BOX. HDPE 45° SWEEP.
wYA
w
• 1
Jul 18 20165;28 PM
oaE'�ARFa4uu
,� BURNS
'\MSDONNELL
9400 WARD PKWY
KANSAS CITY, MO 64114
(816)333-9400
REVISIONS
APPROVED
BIG CANYON RESTORATION
DRAINAGE PLAN
NO. DATE I 13Y APPROVED
DATE:
DESIGNED BY: DRAWN BY:
B.WEIs 1K.ANDRIST1
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
�-s1I1-1
CHC.ECKEDSNIDER Br: DAiE06/24/2016 :
SHFEf 6 OF 22
26-6
ATTACHMENT C
RESOLUTION NO. 2016-58
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT
BEACH, CALIFORNIA, ADOPTING THE MITIGATED NEGATIVE
DECLARATION NO. ND2016-001 (SCH#2016031011) FOR THE BIG
CANYON HABITAT RESTORATION & WATER QUALITY IMPROVEMENT
PROJECT (PA2016-046)
WHEREAS, large areas of the riparian habitat of the Big Canyon Nature Park are
dominated by non-native invasive species; and
WHEREAS, urbanization in the Big Canyon watershed has resulted in increased peak
and sustained peak storm flows which have incised the channel bed and eroded channel
banks in the upper reaches of the Big Canyon Nature Park resulting in reduced floodplain
connectivity and unstable embankments; and
WHEREAS, Newport Bay, the receiving water for Big Canyon Creek, is listed as an
impaired waterbody for metals, toxics, nutrients, and bacteria and total maximum daily loads
(TMDLs) have been established to address these impairments; and
WHEREAS, wet weather, roadway -related pollutants including metals, sediment, oil,
and grease enter Big Canyon Creek from thoroughfares such as Jamboree Road and impact
creek water quality; and
WHEREAS, Big Canyon Creek is listed as an impaired waterbody for selenium and a
TMDL has been established for the creek; and
WHEREAS, seepages containing concentrations of selenium much higher than State
water quality standards have recently been discovered in Big Canyon Creek adjacent to
Jamboree Road; and
WHEREAS, the 2009 Central Orange County Integrated Regional and Coastal
Watershed Management Plan lists the Big Canyon Restoration Project as a key project for
implementing restoration objectives in Upper Newport Bay; and
WHEREAS, the proposed restoration in Big Canyon is in conformance with the
guidelines of the Big Canyon Resource and Recreation Management Plan (being prepared
by the Irvine Ranch Conservancy on behalf of the City), which in turn is consistent with the
requirements of the Natural Community Conservation Plan/Habitat Conservation Plan
(NCCP) for the Central and Coastal sub -region of Orange County in the event the City elects
to incorporate the Nature Park into the NCCP; and
WHEREAS, implementation of the Big Canyon Restoration & Water Quality
Improvement Project will (1) restore historic riparian habitat by removing non-native
vegetation and replace it with native plantings, (2) stabilize the creek and floodplain, (3)
improve water quality in Big Canyon Creek and Newport Bay by diverting seeps with high
concentration of selenium to the sanitary sewer, and (4) enhance public access within the Big
Canyon Nature Park; and
26-7
Resolution No. 2016-58
Page 2 of 3
WHEREAS, a public meeting was held by the City Council on May 10, 2016, in the City
Hall Council Chambers located at 100 Civic Center Drive, Newport Beach, California. A notice
of time, place and purpose of the meeting was given in accordance with the Newport Beach
Municipal Code. Evidence, both written and oral, was presented to, and considered by, the
City Council at this hearing, and
WHEREAS, after thoroughly considering the Mitigated Negative Declaration (MND) for
the Big Canyon Habitat Restoration & Water Quality Improvement Project, and the public
testimony and written submissions of all interested persons desiring to be heard, the City
Council finds the following facts, findings, and reasons to support adopting the MND:
Pursuant to the California Environmental Quality Act (CEQA), Public Resources Code
Sections 21000, et seq., the CEQA Guidelines (14 Cal. Code of Regulations, Sections
15000 et seq.), and City Council Policy K-3, the proposed amendments (Project) are
defined as a project and as such subject to environmental review.
2. The City caused to be prepared an Initial Study/MND in compliance with CEQA, the
State CEQA Guidelines and City Council Policy K-3.
3. Notice of the availability of the draft MND was provided and the draft MND was made
available for public review for a thirty -day comment period beginning on March 4,
2016, and ending April 4, 2016. Notice of the Availability of the draft MND was given in
accordance with CEQA, the State CEQA Guidelines and City Council Policy K-3.
Comments were received from California Department of Fish & Wildlife, Regional
Water Quality Control Board — Santa Ana Region, Orange County Sanitation District.
Comments were also received from the City's Planning Division.
4. Although not required pursuant to CEQA, written responses to the three comment
letters received and the City Planning Division comments were prepared. The
comments and responses were considered by the City Council while considering the
adoption of the MND. The comments to the MND and responses to comments do not
change the determinations or represent a significant departure from the original
document that would warrant recirculation of the MND.
5. The Draft MND and the Final MND (which includes the Responses to Comments) are
attached as Exhibits 1" and "2," respectively, and incorporated herein by reference.
The documents and all related materials, which constitute the record upon which this
decision was based, are on file with the Public Works Department, City Hall, 100 Civic
Center Drive, Newport Beach, California.
6. On the basis of the entire environmental review record, the proposed project, with
mitigation measures, will have a less than significant impact upon the environment and
there are no known substantial adverse effects on human beings that would be
caused. Additionally, there are no long-term environmental goals that are
compromised by the project, nor cumulative impacts anticipated in connection with the
project. The mitigation measures identified by the MND and incorporated in the
26-8
Resolution No. 2016-58
Page 3 of 3
Mitigation Monitoring and Reporting Program are feasible and will reduce potential
environmental impacts to a less than significant level.
NOW THEREFORE, the City Council of the City of Newport Beach, California, hereby
resolves as follows:
Section 1: The Recitals provided above are true and correct and constitute, in part,
the findings of the City Council for the adoption of the attached MND.
Section 2: The City Council of the City of Newport Beach directs the Public Works
Director to incorporate the mitigation measures contained in the Mitigation Monitoring and
Reporting Program included in the Final MND included in Exhibit "2° in the plans and
specifications for the project to be implemented.
Section 3: The City Council of the City of Newport Beach hereby adopts MND No.
ND2016-001 (SCH#2016031011) attached as Exhibits "I" and "2", which are incorporated by
reference.
Section 4: If any section, subsection, sentence, clause or phrase of this resolution is,
for any reason, held to be invalid or unconstitutional, such decision shall not affect the validity
or constitutionality of the remaining portions of this resolution. The City Council hereby
declares that it would have passed this resolution, and each section, subsection, sentence,
clause or phrase hereof, irrespective of the fact that any one or more sections, subsections,
sentences, clauses or phrases be declared invalid or unconstitutional.
Section 4: This resolution shall take effect immediately upon its adoption by the City
Council and the City Clerk shall certify the vote adopting the resolution.
ADOPTED this 10t' day of May, 2016
ATTEST:
Leilani I. Brown
City Clerk
26-9
For a copy of the Exhibits to this Resolution, please go to
http://ecros.newportbeachca.gov/Web/0/doc/833682/Pagel.aspx
or see the City Clerk's Office for a copy.
Exhibit "1"
Big Canyon Habitat Restoration & Water Quality Improvement Project
Mitigated Negative Declaration No. ND2016-001
State Clearinghouse Number 2016031011
Exhibit "2"
Big Canyon Habitat Restoration & Water Quality Improvement Project
Final MND including
Responses to Comments and
Mitigation Monitoring Program for
Mitigated Negative Declaration No. ND2016-001,
State Clearinghouse Number 2016031011
26-10
ATTACHMENT D City of Nlewport Beach
BUDGET AMENDMENT
201E.17
EFFECT M BUDGETARY FUNS BALANCE:
X InalledSE1 Reverwe Estirriales
X InaileasE1 ExpEindiluneAppInciprialions
I nansfen BuddEit AFIFInaFlriatians
SOURCE:
Tram axisiing tucgEd appropflaiicins
X tram aCdilicnal EislimatEid nEivEinues
tram unarIP110F1nidEid func talarice
EXRLA� ATION:
h 0. BA - 1 � B.4-009
AIVIOUNT:1 s119,000.00
InanEiase in BuddEitary Rund BalanaEi
❑eanEiase in Budclataryi Rund BalanlCIEI
X b a effecd an Budgelaryl Rund Balance
I his buCdEit amcndrrient is nequesied to Flnavida far the fallowing:
llo inareasE1 ieyenuE1 estirriaies and m1pEindiiune appnaprialians'lo regard a ucrduibuiian fiiom Onange Claunty Sanita'lion
DIS'Inicit km the Big Canyon REisicmaiion Glnaject.
ACCCIL h11ING EN11RY:
BUEIGET�IFly FUND BALAACE
Func Cltiecrl
Desuniptian
REVEAI UE ES 711MA TES
Crg
CH iEiai PraiecrI
Desuniptian
13501
4.1'1015 '15X12
Canilribuiians Flunid CIP - OCS❑
Fliuiject Sluing
CCII NTY-135-CICI 111RIBUllICIN
EXPEA L I ATUFI E A11PRC PRjIA 7110A S
Desuniptian
Cing NurribEm
135(1'1
Canirituiians Rund CIP
Clbject NurribEm
9fIC10C10
CIP 8xplendiiu11es
Pnojeci NurribEm
'15X10
Dig Clanyan RElstanatlan & MOM Qualiiy IrriFlry
Pnojeci Stning
CCI Ell RUCT-139-1-1I` ASSIGNED
C Rinancial AprInaval: Rinance
EIignEid:
BignEid
Administ—r-aive AFlpra%al: City
Cily Caunail AprInaval: City, CIE*
Amou nil
Det it Cnedit
a
II'l5,CICICI.CIa
Automatic
1115,CIOCI.C10
(02DEItEI
Date
26-11