HomeMy WebLinkAbout05 - Newport Boulevard Widening from 30th Street to Via Lido - NOC for Contract No. 4881 (Project No. 15R17)October 11, 2016 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Andy Tran, Senior Civil Engineer atran@newportbeachca.gov PHONE: 949-644-3315 1 1 TITLE: Newport Boulevard Widening from 30th Street to Via Lido — Notice of Completion for Contract No. 4881 (Project No. 15R17) ABSTRACT: On January 26, 2016, City Council awarded Contract No. 4881 for the Newport Boulevard Widening from 30th Street to Via Lido project to GMC Engineering, Inc. of Tustin, California. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. (In accordance with the California Environmental Quality Act (CEQA) guidelines, a Mitigated Negative Declaration was prepared, circulated for review, and adopted by City Council on October 28, 2014); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after the acceptance by the City Council. 5-9 Newport Blvd. Widening Notice of Completion for Contract No. 4881 (15R17) October 11, 2016 Page 2 FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description General Fund Gas Tax Measure M Competitive Water Enterprise DISCUSSION: Account Number Amount 01001927-980000-15R17 $ 884,186.45 12101-980000-15R17 $ 1,777,169.63 1230050-980000-15R17 $ 1,194,000.00 70201931-980000-15R17 $ 163,010.57 Total: $ 4,018,366.65 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $3,967,186.45 $4,018,366.65 10% or less +1.3% 0% +1.3% Allowed Contract Time + 116 Actual Time 5 Approved Extensions (days) = Under (-) or Over (+) The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original bid amount: $3,967,186.45 Actual Cost of Bid Items Constructed: $3,810,662.02 Total Change Orders: $207,704.63 Final contract cost: $4,018,366.65 The actual cost of contract bid items constructed was $156,524.43 less than the original bid amount. The majority of the cost saving is attributed to the deletion of several bid items as follows. Staff encountered inconsistent pavement/sub-grade materials and thicknesses on Newport Boulevard during construction of the recently completed water transmission main project within the same area of Newport Blvd. As a result, bid items to over -excavate and stabilize the soil were included with this contract, but were deemed not necessary as the required soil compaction was achieved in all cases. In addition, the project site investigation report, which was completed as part of the environmental phase, identified a potential for the existence of volatile organic compounds (VOCs) in the existing soil. A bid item was included to handle and dispose this possibly unsuitable soil. During construction, soil excavation was monitored and sampled and no concentration of VOCs were detected which led to the deletion of this bid item. 5-2 Newport Blvd. Widening Notice of Completion for Contract No. 4881 (15R17) October 11, 2016 Page 3 The project also included several change orders for a total amount of $207,704.63, which was approximately 5.2 percent of the original bid amount. Notable change orders were for a new replacement irrigation controller, adjustments to the seawall by the new parking lot, installing new cable railing on the seawall, and relocating a traffic signal controller at the Via Lido intersection. A summary of the project schedule is as follows: Estimated Completion Date per Baseline Schedule July 29, 2016 Notice to Proceed for Construction February 1, 2016 Contract Completion Date with Approved Extensions July 14, 2016 Actual Substantial Construction Completion Date July 7, 2016 The project was substantially completed as of July 7, 2016. Some miscellaneous close- out items, operation and maintenance turnover, and post -substantial completion activities needed to be finalized prior to this Notice of Completion action. ENVIRONMENTAL REVIEW: In accordance with the CEQA guidelines, a Mitigated Negative Declaration was prepared, circulated for review, and adopted by City Council on October 28, 2014. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A — Location Map 5-3 a 5 ATTACHMENT A v PROJECT LOCATION vI ter Avg. I OSki STR��� I 101=LVA ; i - -*Q ky/slN91TA191; 10 110 FROM 30TH STREET TO VIA LIDO LOCATION MAP W a U CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-4881 1 10/11/2016 5-4