HomeMy WebLinkAbout06 - Grand Canal Dredging Project - Phase 1 of 3 Planned Permitted Projects - Award of Contract No. 8171-1 (16H12)TO:
FROM:
CITY OF
NEWPORT BEACH
City Council Staff Report
October 11, 2016
Agenda Item No. 6
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Peter Tauscher, Civil Engineer, ptauscher@newportbeachca.gov
PHONE: 949-644-3316
TITLE: Grand Canal Dredging Project — Phase 1 of 3 Planned Permitted
Projects —Award of Contract No. 8171-1 (161-112)
ABSTRACT:
Staff has received construction bids for the first phase of three planned dredging
projects in the Grand Canal utilizing our Army Corp Regional General Permit (RGP 54)
and City Eelgrass Plan, and is requesting City Council approval to award the contract to
Associated Pacific Constructors, Inc. of Morro Bay, California.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Class 4 Section 15304 (g) (Maintenance dredging where the spoil is
deposited in a spoil area authorized by all applicable state and federal regulatory
agencies) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter
3, because it has no potential to have a significant effect on the environment;
b) Approve the project drawings and specifications;
c) Award Contract No. 8171-1 to Associated Pacific Constructors, Inc. (APC) for the
total bid price of $397,000.00, and authorize the Mayor and City Clerk to execute the
contract;
d) Establish $38,000.00, approximately 10 percent, contingency amount to cover the
cost of unforeseen work not included in the original contract; and
e) Approve Budget Amendment No. 17BA-012 appropriating $84,000.00 from the
unappropriated Tidelands Capital fund balance to Account No. 10101-980000-
16H12 for Grand Canal Dredging Project — Phase 1 project (Attachment B).
6-1
Grand Canal Dredging Project — Phase 1 — Award of Contract No. 8171-1
Project No. 16H12
October 11, 2016
Page 2
FUNDING REQUIREMENTS:
Upon approval of the budget amendment, there is sufficient funding for this project. The
following funds will be expensed:
Account Description Account Number Amount
Tidelands Capital 10101-980000-16H12 $ 444,000.00
Total: $ 444,000.00
Proposed uses are as follows:
Vendor Purpose Amount
Associated Pacific Constructors, Inc. Construction Contract $ 397,000.00
Associated Pacific Constructors, Inc. Construction Contingency $ 38,000.00
Various and On -Call Surveying Printing & Incidentals $ 9,000.00
Total: $ 444,000.00
DISCUSSION:
In conjunction with the Department of Army Regional General Permit 54 and Santa Ana
Regional Water Quality Control Board 401 Permit, California Coastal Commission
(CCC) issued Coastal Development Permit 5-14-0200 and Consistency Certificate CC -
0002 -15 for dredging, sand replenishment, and eelgrass protection. In June 2016,
CCC issued a Condition Compliance for application DRG2016-1051 permitting
maintenance dredging along the Grand Canal (Attachment A). In accordance with
permitted eelgrass protection limitations, this dredging effort will require multiple
phases. The current contract recommended for approval will address dredging in
Grand Canal from Park Avenue Bridge to South Bay Front.
At 10 a.m. on September 21, 2016, the City Clerk opened and read the following
electronic bid for this project:
BIDDER TOTAL BID AMOUNT
Low Associated Pacific Constructors, Inc. $397,000.00
The bid generated significant contractor interest; however, only one responsive bid was
received. The relatively small project size, restrictive access to the Grand Canal,
compounded with the exorbitant cost to mobilize and relocate dredging equipment to
the local area may have resulted in contractors' higher than expected bid. Due to the
project's specialized scope, location and relatively small size, staff believes rebidding
the project will not likely yield better pricing. As such, staff recommends awarding this
contract.
The low bidder, Associated Pacific Constructors, Inc. possesses a California State
Contractors License Classification "A" as required by the project specifications. A check
of the contractor's references indicates satisfactory completion of similar projects for the
City of Newport Beach and other public agencies.
6-2
Grand Canal Dredging Project — Phase 1 — Award of Contract No. 8171-1
Project No. 16H12
October 11, 2016
Page 3
This proposed project involves coordinating with residents and the ongoing Park
Avenue Bridge replacement project; conducting hydrographic surveys; and dredging
and disposing material. The suitable dredged material shall be transported off site for
placement at the U.S. Environmental Protection Agency's LA -3 Ocean Dredged Material
Disposal Site (ODMDS).
Pursuant to the contract documents, the Contractor will have forty (40) consecutive
working days to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Class 4 Section 15304 (g) (Maintenance
dredging where the spoil is deposited in a spoil area authorized by all applicable state
and federal regulatory agencies) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B —Budget Amendment No. 17BA-012
6-3
ATTACHMENT A
207 206 207 2081
zos 207 206
203 204 205 2012 204 205 204
200 203 202 N 202
1306 Go
1308 201 201 200 to Lo 200
r r
PARK AVENUE
1271/2 126
127 124 127 126 127
125 124 125 W 1241!2
124
123 122 123 122 123 W 122
121112
121 120 121 120 121 Q 120
119 116 119 112 V 918 119 118
1171
117 116 117 116 117
LU 116
115 Z)114 115 114 115 Z
O 112112
113 ? 112 113 112 111 Q 112
111 ¢ 110 111 17 0112 00 110
110 Q
105 106 109 1061/2 107
107 106 106
W
Z_
7o O N TCO
Q O N � O p O C7 N
Rom P] MCp CD
1n N CO CD
BAY FRONT SOUTH
NOT TO SCALE
PROJECT LIMITS
GRAND CANAL DREDGING PROJECT CITY OF NEWPORT BEACH
PHASE 1 PUBLIC WORKS DEPARTMENT
LOCATION MAP C-8171-1 10/11/16
PN 16H12
O
r
r
r
r
r
ATTACHMENT B hi"y OF Newport Beach
BUDGETAMENDMENT
2016-17
EFFECT ON
BUDGETARY FUND BALANCE:
}C
Decrease in Budgetary Fund Balance
Increase Revenue Estimates
}C
ONE-TIME?
Increase Expenditure Appropriations AND
Yes
Object Number 980000
Transfer Budget Appropriations
SOURCE:
Grand Canal Dredging Rollup
from existing budget appropriations
from additional estimated revenues
Y
from unappropriated fund balance
EXPLANATION:
NO. BA- 1 r BA -012
AMOUNT:J $84,000.0
This budget amendment is requested to provide for the following:
To increase expenditure appropriations from unappropriated Tidelands Capital fund balance to fund the Grand Canal Dredging
Project - Phase 1.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Obiect
101 300000
REVENUE -ESTIMATES
Description
Tidelands Capital Fund Balance
Og flbiec
Increase in Budgetary Fund Balance
}C
Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
ONE-TIME?
Org Number 10101
Yes
Object Number 980000
No
This budget amendment is requested to provide for the following:
To increase expenditure appropriations from unappropriated Tidelands Capital fund balance to fund the Grand Canal Dredging
Project - Phase 1.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Obiect
101 300000
REVENUE -ESTIMATES
Description
Tidelands Capital Fund Balance
Og flbiec
Description
EXPENDITURE APPROPRIATIONS
Description
Org Number 10101
Tidelands Capital
Object Number 980000
CIP Exp
Project Number 161-112
Grand Canal Dredging Rollup
Signed:
Signed:
Signed:
Approval: Finance Dlrec or
Approval: City
City Council Approval: City Clerk
Amount
Debit Credit
$84,000,00
" Audornaflc
$84,000.00
o-30_4—
Date
1,:,/ �L/f L
Date
Date
6-5