Loading...
HomeMy WebLinkAbout15 - Police Headquarters and Fire Station No. 3 Roofing Project — Award of Contract No. 8211-1 (17F02) - PowerPointCity of Newport Beach 10/11/2016 Agenda item No. 12 Award: $944,703.00 Built Up Roofing (BUR) (20-30 year life) aka Tar & Gravel roof Single -ply Membrane (2o -year life) using Thermoset (EDPM) or Thermoplastic (TPO) or Thermoplastic (PVC) Modified Bitumen (3o year life) high strength rubberized membrane Roof system selection is based on variety of factors location, slopes, lifespan, nature of the facility, and equipment and penetrations on the roof Labor costs drive the price and depend on the complexities of the roof (i.e. production rate) (see pictures) Prevailing wage construction Roofing labor costs have increased by 400% over the last 20 years according to contractors 3rd party independent consultant review of the Fire Station Roof Agreed roof must be replaced and that it is a very flat roof Modified Bitumen with Gravel or Single Ply roof recommended Police Headquarters and Fire Station No. 3 Roofing Proiect • Award contract to Garland Company, Inc. using U.S. Communities government purchasing cooperative program Police Headquarters Roof: • Decades old - 36,000 SF - new Torched Modified Bitumen Roof • Completely remove the old roof in sections • 145 penetrations & 33 AC units; 2,000 square foot helideck; 56o foot site screen around the building; dozens of radio antennas • AC units - rebuild pans, reset& rebalance units • Install roof walkway pads, title 24 coatings, • Seal all perforations and flashings • 30 year labor & material non -prorated warranty Police Headquarters and Fire Station No. 3 Roofing Proiect • Award contract to Garland Company, Inc. using U.S. Communities government purchasing cooperative program Fire Station Roof: • Decades old — lo,700 SF - new Modified Bitumen & Gravel Roof system • 1,800 SF of vertical walls and base flashings increase the area to 12,500 SF • Completely remove the old roof in sections • Replace skylights and hatches • installation of a new sloped roof system for better drainage • AC units — replace pans and supports, reset& rebalance units • Seal all perforations and flashings • 30 year labor & material non -prorated warranty Police Headquarters and Fire Station No.3 Roofing Project Conduits create complicated roof installation Shows roof congested with equipment, helipad, radio towers Site screens on the entire roof, ---56o linear feet I Metal pans will need removed, roofed, then reinstalled •s. _ Y_ _. loot— T N_ 'Y _loft up 00,0000011, 391 1�4 —.-w uo N —4!IM �+,—�eo-s• I pmw�w � I mui i4 I go Ls s , +• • _ l fes' ` -� ~•• ,, \ Nd* ..e " . Ali i' r w `� � � '� , r 1 .� _ �, � �l �_.- -.c-- - � - -_- /! _ // �; ;; r �- �; ¢ , r ��� ,� - � "�---� ,� ro �- r �� �� . 1 l 1 Police Headquarters and Fire Station No. 3 Roofing Pro'ect Both Locations: • Labor intensive construction • Construction accommodates - 24/7 operations • City will receive a high quality roof with 3o -year warranty • Construction - November 2o16 thru Winter 2017 Police Headquarters Roof: • $649,998 Fire Station Roof: • $294,705