HomeMy WebLinkAbout10 - 2014-2015 Citywide Slurry Seal Program — NOC for Contract No. 5895 (Project No. 15R04)SEW POST NE W.I. PORT BEACH City Council Staff Report November 22, 2016 Agenda Item No. 10 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Alfred Castanon, Associate Civil Engineer acastanon@newportbeachca.gov PHONE: 949-644-3314 TITLE: 2014-2015 Citywide Slurry Seal Program — Notice of Completion for Contract No. 5895 (Project No. 15R04) ARSTRACT- On April 28, 2015, City Council awarded Contract No. 5895 for the 2014-2015 Citywide Slurry Seal Program to American Asphalt South, Inc. of Fontana, California. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project (On April 28, 2015, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description Account Number Amount General Fund 01201927-980000-15R04 $ 482,433.21 10-1 DISCUSSION: 2014-2015 Citywide Slurry Seal Program Notice of Completion for Contract No. 5895 (15R04) November 22, 2016 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $485,035.00 $482,433.21 10% or less -0.5% -0.5% - Allowed Contract Time + 326 Actual Time -15 Approved Extensions (days) = Under (-) or Over (+) This asphalt slurry seal project addressed local and collector streets in the Irvine Terrace, Corona del Mar (south of East Coast Highway), and Shorecliffs communities. The work necessary to complete this contract consisted of distributing construction notices to affected businesses and residents, clearing existing pavement surfaces of debris, soils and other loose materials, crack sealing, placing emulsion aggregate slurry seal and restriping. The contract also provided for parking lot seal coating at Beacon Bay, Old School Park, Corona del Mar Main Beach and Bayside Drive Parks. The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original bid amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final contract cost: $485,035.00 $430,389.63 $52,043.58 $482,433.21 The final cost of contract bid items constructed was $54,645.37 less than the original bid amount due to the removal of Carnation Avenue from the slurry seal list. Carnation Avenue was part of the recent Corona del Mar Water Transmission Main Improvement project in which it received a new pavement cap between Bayside Drive and East Coast Highway. The project also included several change orders for a total amount of $52,043.58, which was approximately 10.7 percent of the original bid amount. Notable change orders were for remobilization and slurry seal work associated with water main improvements in Corona Del Mar, additional costs to slurry seal existing asphalt sidewalks on Coast Highway, and sealcoat and restriping work for the Newport Beach Police Department parking lot. 10-2 2014-2015 Citywide Slurry Seal Program Notice of Completion for Contract No. 5895 (15R04) November 22, 2016 Page 3 A summary of the project schedule is as follows: Estimated Completion Date per Baseline Schedule July 27, 2015 Notice to Proceed for Construction July 27, 2015 Contract Completion Date with Approved Extensions November 5, 2016 Actual Substantial Construction Completion Date September 30, 2015 Work on this slurry seal project was delayed many months due to conflicts associated with a separate water main replacement project in Corona del Mar that was also delayed due to unknown conditions and underground utilities. The project's Notice to Proceed was issued on July 27, 2015, and the majority of the planned slurry seal and sealcoat work was substantially completed by September 30, 2015. Public Works staff decided to reschedule some slurry seal work on several streets to a later date to accommodate the delayed water main replacement work. A second Notice to Proceed was later issued to go back and pick up the streets that were removed earlier, as well as include additional parking lot seal coat and striping work at the Newport Beach Police Department resulting in extending out the final completion date to November 5, 2016. ENVIRONMENTAL REVIEW: At the April 28, 2015 City Council meeting, the project was found to be exempt from the California Environmental Quality Act ("CEQA") pursuant to Section 15301 (for repair, maintenance and minor alteration of existing public facilities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it had no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A — Location Map 10-3 ATTACHMENT A 1 1 ER R\ n� CORONA DEL � ORE IRVINE TERRACE, CORONA DEL MAR & SHORECLIFFS FY 2014-2015 CITYWI DE SLURRY SEAL PROGRAM LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-5895 1 11/22/16 10-4