Loading...
HomeMy WebLinkAbout16 - CdM Concrete Pavement Reconstruction - Poppy Avenue and Ocean Boulevard - Award of Contract No. 6189 (17R12) - PowerPointDecember 13, 2016 Item No. 16 Corona del Mar Pavement Reconstruction — Poppy Avenue and Ocean Boulevard Award of Construction Contract 6189 City Council Meeting December 1312016 Public Works and Municipal Operations Departments ,V,Wpol, Y r y� all I yam - d 16P` lei mks pp - 01- I I PLANTER PLANTER N F'� LL AREA AREA LU I— I I SIDE SIDE T WALK 87wESTROUND 9:FASTBOUND a, PARKING WALK 0 _;�;l 8, 24' W TYPICAL EXISTING SECTION (A -A) LOOKING TOWARDS PCH SCALE 1 -60' • 4 -foot wide sidewalk • 21/2 -foot wide parkway • 1 -foot public area behind the sidewalk • Some walls encroach in the 1 -foot area Existing Sidewalk — Sections Poppy Avenue 0 PIANTFR 2.5 4.0 ARRA FXISTING ARIL, WHEW APPLICABLE • 4 -foot wide sidewalk, offset at tree locations • 21/2 -foot wide typical parkway (existing) • Goal to have 3 1/2 -foot wide tree wells and 4 -foot wide sidewalk at all locations • No tree wells and 4 -foot wide sidewalks at areas with wall encroachments. New Sidewalk - Sections Poppy Avenue } w� 4.0 3.5 .1 AAT=R LU AFT J. I, 8' WEST30UNU 0 PIANTFR 2.5 4.0 ARRA FXISTING ARIL, WHEW APPLICABLE • 4 -foot wide sidewalk, offset at tree locations • 21/2 -foot wide typical parkway (existing) • Goal to have 3 1/2 -foot wide tree wells and 4 -foot wide sidewalk at all locations • No tree wells and 4 -foot wide sidewalks at areas with wall encroachments. New Sidewalk - Sections Poppy Avenue • 7 r r f w 0 71 k }) r Jim- lp / 1'►•4 '. .�" � � , Vit- ,� i :p+af.. j'�'�''r. Is".���jr .��,-,Yr�.: -9 �� '•*�,r+ "7a-�, 4,,1^�+, =x:54 . h j 4Awl kommmin.m., Poppy Avenue Proposed Groundcoverfor Parkway d, AM BLUE CHALKSTICKS CALIFORNIA MEADOW GRASS DEER GRASS Poppy Avenue — Proposed Color for Parkways KALEIDOSCOPE ABELIA ICEBERGE ROSE PURPLE SAGE PURPLE AEONIUM rf GAZAN IA %t,, L;11 I't rf GAZAN IA Outreach & Community Input • 11/9/15 & 12/9/15 Community meeting_ discussion items: ✓ Keep parking as -is ✓ Keep sidewalk on both sides ✓ Utilize the 1 -foot public area behind the sidewalk ✓ Re -landscape with trees ✓ Sidewalk width and location similar to existing ✓ Tree selection — Community Desired: 36 -inch box trees 1. Water Gum Tree 2. African Tulip Tree • Oct. 2016- Postcards to all Poppy residents • 10/4/16 PB&R Commission • 11/17/16 CDM Residents Meeting • 12/2/16 Friends of Oasis Annual Meeting Public Works and Municipal Operations Departments Project Schedule & Next Steps ✓ Construction: January thru June 2017 ❑ Project will replace entire street, concrete and trees ❑ Residents to choose individual landscape in parkways ❑ If no choice is made, mulching will be placed in parkway City Council Consideration: 1. Approve the Plans and Specifications 2. Award Construction Contract to All American Asphalt - for bid price of $11216)033 Public Works and Municipal Operations Departments f� AM ensmictiorr k