HomeMy WebLinkAbout16 - CdM Concrete Pavement Reconstruction - Poppy Avenue and Ocean Boulevard - Award of Contract No. 6189 (17R12) - PowerPointDecember 13, 2016
Item No. 16
Corona del Mar Pavement
Reconstruction — Poppy Avenue and
Ocean Boulevard
Award of Construction
Contract 6189
City Council Meeting
December 1312016
Public Works and
Municipal Operations Departments
,V,Wpol,
Y
r y�
all I yam -
d
16P`
lei
mks
pp -
01- I I PLANTER PLANTER N F'�
LL AREA AREA LU
I— I I
SIDE SIDE
T WALK 87wESTROUND 9:FASTBOUND a, PARKING WALK 0
_;�;l 8, 24' W
TYPICAL EXISTING SECTION (A -A) LOOKING TOWARDS PCH
SCALE 1 -60'
• 4 -foot wide sidewalk
• 21/2 -foot wide parkway
• 1 -foot public area behind the sidewalk
• Some walls encroach in the 1 -foot area
Existing Sidewalk — Sections
Poppy Avenue
0
PIANTFR 2.5 4.0
ARRA
FXISTING ARIL,
WHEW APPLICABLE
• 4 -foot wide sidewalk, offset at tree locations
• 21/2 -foot wide typical parkway (existing)
• Goal to have 3 1/2 -foot wide tree wells and 4 -foot wide
sidewalk at all locations
• No tree wells and 4 -foot wide sidewalks at areas with
wall encroachments.
New Sidewalk - Sections
Poppy Avenue
}
w�
4.0
3.5
.1 AAT=R
LU
AFT
J.
I, 8' WEST30UNU
0
PIANTFR 2.5 4.0
ARRA
FXISTING ARIL,
WHEW APPLICABLE
• 4 -foot wide sidewalk, offset at tree locations
• 21/2 -foot wide typical parkway (existing)
• Goal to have 3 1/2 -foot wide tree wells and 4 -foot wide
sidewalk at all locations
• No tree wells and 4 -foot wide sidewalks at areas with
wall encroachments.
New Sidewalk - Sections
Poppy Avenue
•
7
r r
f w
0
71
k
}) r
Jim-
lp
/ 1'►•4 '. .�" � � , Vit- ,� i :p+af.. j'�'�''r.
Is".���jr .��,-,Yr�.: -9 �� '•*�,r+ "7a-�, 4,,1^�+, =x:54 .
h
j 4Awl kommmin.m.,
Poppy Avenue
Proposed Groundcoverfor Parkway
d,
AM
BLUE CHALKSTICKS
CALIFORNIA MEADOW GRASS
DEER GRASS
Poppy Avenue —
Proposed Color for Parkways
KALEIDOSCOPE ABELIA
ICEBERGE ROSE
PURPLE SAGE
PURPLE AEONIUM
rf
GAZAN IA
%t,,
L;11
I't
rf
GAZAN IA
Outreach & Community Input
• 11/9/15 & 12/9/15 Community meeting_ discussion items:
✓ Keep parking as -is
✓ Keep sidewalk on both sides
✓ Utilize the 1 -foot public area behind the sidewalk
✓ Re -landscape with trees
✓ Sidewalk width and location similar to existing
✓ Tree selection — Community Desired: 36 -inch box trees
1. Water Gum Tree 2. African Tulip Tree
• Oct. 2016- Postcards to all Poppy residents
• 10/4/16 PB&R Commission
• 11/17/16 CDM Residents Meeting
• 12/2/16 Friends of Oasis Annual Meeting
Public Works and
Municipal Operations Departments
Project Schedule & Next Steps
✓ Construction:
January thru June 2017
❑ Project will replace entire street, concrete and trees
❑ Residents to choose individual landscape in parkways
❑ If no choice is made, mulching will be placed in
parkway
City Council Consideration:
1. Approve the Plans and Specifications
2. Award Construction Contract to
All American Asphalt - for bid price of
$11216)033
Public Works and
Municipal Operations Departments
f� AM
ensmictiorr
k