Agenda Item No. 9
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Kimberly Brandt, Community Development Director - 949-644-3232,
kbrandt@newportbeachca.gov
PREPARED BY: Lauren Wooding Whitlinger, Real Property Administrator
Seimone Jurjis, Assistant Community Development Director, CBO
PHONE: 949-644-3236, lwooding@newportbeachca.gov
TITLE: Coastal Development Permit Application for the Demolition and
Reconstruction of a New Restaurant at the End of the Newport Pier
ABSTRACT:
In March 2016, the City Council entered into an exclusive negotiating agreement (ENA)
with James Ulcickas and Richard Staunton, owners of Bluewater Grill restaurant
(Bluewater) for the Newport Pier restaurant project located at 1 Newport Pier. The ENA
allowed the parties to negotiate in good faith the terms of a lease agreement for a
proposed new building. In anticipation of a future project, staff requests to submit a
Coastal Development Permit (CDP) to the California Coastal Commission (CCC) on the
proposed project.
RECOMMENDATION:
a) Find the project is exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15302(b) of the CEQA Guidelines for the replacement of existing
facilities; and
b) Authorize City staff to submit a CDP application to the California Coastal
Commission for the demolition of the existing building and construction of a new
building for use as a restaurant at the end of the Newport Pier.
FUNDING REQUIREMENTS:
As a government agency, there is no cost to the City for submitting the application to
CCC.
9-1
Coastal Development Permit Application for the Demolition and Reconstruction of a
New Restaurant at the end of the Newport Pier
January 10, 2017
Page 2
DISCUSSION:
Restaurant Space
The Newport Pier, located on the Balboa Peninsula at 21St Street and West Ocean
Front, is adjacent to the historic McFadden Wharf (Attachment A). The City -owned
restaurant building at the end of the pier has been vacant since the previous lease
expired in November 2012, in anticipation of a major renovation or redevelopment of the
property. The existing two-story building was constructed in the 1940s, and it was
expanded and renovated in the late 1980s. After evaluating the existing structure and
the underlying pier, it was determined the building is beyond its useful life and its
removal and replacement is the best economic option. Additionally the restaurant
demolition will allow for renovation of the pier directly beneath the building.
The project consists of demolishing the existing two-story restaurant of 4,000 square -
feet and replacing it with a new restaurant of substantially the same size. The proposed
new building will be two stories in height and 4,500 square -feet in size with a small roof
deck accessed by stairs and a wheelchair accessible elevator. Outdoor dining that is
open and available to the public will be provided on the pier as part of the restaurant.
The restaurant will provide a takeout window that will allow visitors to purchase food and
use the outdoor dining without having to enter the restaurant.
Tenant Selection
The City conducted an open bid Request for Proposals (RFP) in 2014 and 2015, and
after an extensive evaluation process staff recommended James Ulcickas and Richard
Staunton, owners of Bluewater Grill restaurant, will best meet the City's objectives of
creating a viable restaurant on Newport Pier, which complements the pier itself, the
McFadden Square area, and will serve residents and visitors alike.
On March 8, 2016, City Council approved an ENA with Bluewater to develop preliminary
designs for a new restaurant building, and to negotiate the terms of a lease agreement
for the project, as well as continue to analyze the anticipated costs of the project.
Preliminary Prosect Design
Per the terms of the ENA, the City and Bluewater shared the cost to hire Kelly
Architects, who — after several rounds of feedback from staff and Bluewater, developed
preliminary floor plans and building elevations for the proposed project (Attachment B).
8-2
Coastal Development Permit Application for the Demolition and Reconstruction of a
New Restaurant at the end of the Newport Pier
January 10, 2017
Page 3
Coastal Development Permit
While the preliminary building floor plans and elevations have allowed staff and
Bluewater to estimate the project costs and negotiate preliminary lease terms, a Coastal
Development Permit will ultimately be required for the reconstruction of the building.
Authorizing staff to submit the CDP in no way commits the City Council to funding the
project. Staff would like to begin the CDP permitting process early as it will take nine to
12 months to complete. If the City Council does authorize and fund the project in the
future, the CDP process would have already begun.
Recommendation
Staff recommends the City Council authorize staff to submit an application for a CDP to
the California Coastal Commission, using the preliminary building floor plans and
elevations — in substantially the same form as the attached drawings.
ENVIRONMENTAL REVIEW
Staff recommends the City Council find this action is exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15302(b) Replacement or
Reconstruction of existing facilities. The project is a replacement of an existing
commercial structure with a new structure of substantially the same size, purpose, and
capacity. There are no environmental impacts with replacing the existing building.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Maps
Attachment B — Preliminary Building Designs
8-3
Attachment A
Maps
Newport
Beach
Disclaimer: Every reasonable effort has been made to assure the
accuracy of the data provided, however, The City of
GIS
Newport Beach and its employees and agents
.
disclaim any and all responsibility from or relating to
any results obtained in its use.
0
200 400
MENEM Imagery: 2009-2013 photos provided by Eagle
Imaging www.eagleaerial.com
Feet
'�q�l FfJri�
2/17/2016
m
Attachment B
Preliminary Building Designs
9-7
Newport Pier Restaurant I Newport Beach
concept review 512512016
K E L L Y
ARCHITECTS
IhTfilcr RrrhiI—twr■ I Inl.rlyr d�
2404 Wilshire Blvd, suite 1 E Los Angeles, CA 90057
213.380.8498
9-8
-it
f n
*.II
All) �
orIt ,
d�
4=
UA&U.. _:. .
6d
r
`alb
.Von SUM
px
�f
��
q:
Concept I Exterior Materials
Newport Pier Restaurant
Newport Beach, CA
May 2016
KELLY
ARCHITECTC
9-11
I PW M Ml-
I��An
p 11 - 11 167i 1 11,
if
.' i- F- 'rte 1 err i F • • y7`# ' ♦ s t
Entrance from the Pier
Newport Pier Restaurant K E L L Y
1 McFadden Place
F� May 2016 AR+CHITECTS
9-13
North Corner
Newport Pier Restaurant K E L L Y
1 McFadden Place
May 2016 ARCHITECTS
9-14
W.
Newport Pier Restaurant
1 McFadden Place
May 2016
Dining Patio and Pick-up Counter
KELLY
ARCHITECT
9-15
i
Newport Pier Restaurant
1 McFadden Place
May 2016
PIER
7
Bar Patio and Roof Access
KELLY
ARCHITECTS
9-16
SEAT COUNTS
1 st Floor
Interior Seats
50
Exterior Seats
60
2nd Floor
Interior Seats
68
Exterior Seats
48
TOTAL SEATS
226
AREA
INTERIOR
I st Floor
2,532 Sq. Ft.
2nd Floor
1,966 Sq. Ft.
INT.TOTAL: 4,498 Sq. Ft.
EXTERIOR
1st Floor
1,157 Sq. Ft.
2nd Floor
754 Sq. Ft.
Roof Deck
670 Sq. Ft.
EXT. TOTAL: 2,581 Sq. Ft.
TOTAL AREA: 2,079 Sq. Ft.
First Floor Plan
Newport Pier Restaurant K E L L Y
1 McFadden Place
May 2016 ARCHITECTS
9-17
�f
STORAGE
314 S(j. FT. � �• i - -
} BAR
- 2[i65Q.FT.
•----•-----' ON
UP
F
Newport Pier Restaurant
1 McFadden Place
May 2016
BALCONY
7 34 SQ. Fl:
SEAT COUNTS
DINING
PATIO
BAR DINING
SQ
LIFT
60
2nd Floor
q---
68
SSS50.FT.
1,3525Q.fT.
-
226
670 Sq. Ft.
EXT.TOTAL: 2,581 Sq. Ft.
I
�-,
, ore
-�
WOMEN'S'—r—
RESTROOM
_ VESTIBULE
I
62 SQ. FT
� 1675Q.FT.
I
J
i •r
MEN'S
+---°..
RESTROOM
MECFi.12454.FT.
SHAFT
I�l
�f
STORAGE
314 S(j. FT. � �• i - -
} BAR
- 2[i65Q.FT.
•----•-----' ON
UP
F
Newport Pier Restaurant
1 McFadden Place
May 2016
BALCONY
7 34 SQ. Fl:
SEAT COUNTS
1 st Floor
Interior Seats
SQ
Exterior Seats
60
2nd Floor
Interior Seats
68
Exterior Seats
48
TOTAL SEATS
226
AREA
INTERIOR
1 st Floor
2,532 Sq, Ft,
2nd Floor
1 1,966 Sq. Ft,
INT. TOTAL: 4,498 Sq. Ft.
EXTERIOR
1st Floor
1,157 Sq. Ft.
2nd Floor
754 Sq. Ft.
Roof Deck
670 Sq. Ft.
EXT.TOTAL: 2,581 Sq. Ft.
TOTAL AREA: 7,079 Sq. Ft.
Second Floor Plan
KELLY
ARCHITECTS
9-18
Newport Pier Restaurant
1 McFadden Place
May 2016
Roof Plan
KELLY
ARCHITECTS
9-19