Loading...
HomeMy WebLinkAbout07 - Grand Canal Dredging NOCFebruary 14, 2017 Agenda Item No. 7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Peter Tauscher, Senior Civil Engineer, ptauscher@newportbeachca.gov PHONE: 949-644-3316 TITLE: Grand Canal Dredging Project — Phase 1 — Notice of Completion of Contract No. 8171-1 (Project No. 16H12) ABSTRACT: On October 11, 2016, City Council awarded Contract No. 8171-1 for the Grand Canal Dredging Project — Phase 1 to Associated Pacific Constructors, Inc. (APC). The required work is complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. This project was found exempt from the California Environmental Quality Act (CEQA) pursuant to Class 4 Section 15304 (g) (Maintenance dredging where the spoil is deposited in a spoil area authorized by all applicable state and federal regulatory agencies); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following account: Account Description Account Number Amount Tidelands Capital 10101-980000-16H12 $ 379,545.00 Total: $ 379,545.00 7-1 DISCUSSION: Grand Canal Dredging Project — Phase 1 — Notice of Completion of Contract, No. 8171-1 (16H02) February 14, 2017 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Completion Allowance Contract Directed Unforeseen Amount Change Change Change $397,000.00 $379,545.00 10% or less -4.4% -5.5% +11.1% Allowed Contract Time + Approved 50 Actual Time -16 Extensions days) = Under (-) or Over (+) Contract No. 8171-1, Grand Canal Dredging — Phase 1 has been completed to the satisfaction of the Public Works Department. A summary of this contract's construction cost is as follows: Original bid amount: $397,000.00 Actual Cost of Bid Items Constructed: $374,995.00 Total Change Orders: $ 4,550.00 Final contract cost: $379,545.00 In June 2016, California Coastal Commission (CC) issued a Condition Compliance permitting maintenance dredging along the Grand Canal. The portion of the Grand Canal from South Bay Front to Park Avenue was then dredged in accordance with the Department of Army Regional General Permit 54, Santa Ana Regional Water Quality Control Board 401 Permit, and the CCC issued Coastal Development Permit 5-14-0200 and Consistency Certificate CC -0002-15 for dredging, sand replenishment and eelgrass protection. In agreement with permitted eelgrass protection limitations, additional dredging phases will be needed to complete the entire Grand Canal dredging. The final cost of bid items constructed was $374,995.00, which was $22,005.00 less than the original bid amount. The contract estimated that the contractor would encounter unsuitable ocean disposal material. Fortunately, all the material dredged was suitable for ocean disposal. Furthermore, the total dredge amount suitable for ocean disposal was less than the initial estimate, resulting in the $22,005.00 savings. Also during construction, a change order was issued totaling $4,550.00 for additional surveying services in Newport Bay that was approximately 1.1 percent of the original contract amount and within the contingency allowance. 7-2 Grand Canal Dredging Project — Phase 1 — Notice of Completion of Contract, No. 8171-1 (16H02) February 14, 2017 Page 3 ENVIRONMENTAL REVIEW: The Grand Canal Dredging - Phase 1 project was found exempt from the California Environmental Quality Act (CEQA) pursuant Class 4 Section 15304 (g) (Maintenance dredging where the spoil is deposited in a spoil area authorized by all applicable state and federal regulatory agencies). NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 7-3 ATTACHMENT A PARK AVENUE w z Lu Q U Lu w Z) z z Lu J Q Q 00 Q Lu z 0 Q BAYFRONT SOUTH NOT TO SCALE PROJECT LIMITS GRAND CANAL DREDGING PROJECT CITY OF NEWPORT BEACH PHASE 1 PUBLIC WORKS DEPARTMENT LOCATION MAP C-8171-1 2/14/17 PROJECT 16H12 7-4