HomeMy WebLinkAbout01_RD Olsen Construction Employee Parking Lot Limited Term Permit_PA2017-009 COMMUNITY DEVELOPMENT DEPARTMENT
U N6PLANNING DIVISION
e� 100 Civic Center Drive, P.O. Box 1768, Newport Beach, CA 92658-8915
cq<<FOR�vP 949-644-3200
www.newportbeachca.gov
CITY OF NEWPORT BEACH
ZONING ADMINISTRATOR STAFF REPORT
February 16, 2017
Agenda Item No. 1
SUBJECT: RD Olson Construction Worker Parking Lot (PA2017-009)
SITE LOCATION: 3303 & 3355 Via Lido
• Limited Term Permit No. XP2017-001
APPLICANT: RD Olson Construction
OWNER: NPBay Investors, LLC
PLANNER: James Campbell, Principal Planner
(949) 644-3210, Jcampbell@newportbeachca.gov
ZONING DISTRICT/GENERAL PLAN
• Zone: PC (Planned Community) — Lido Villas
• General Plan: RM (Multiple-unit Residential, 20 DU/AC)
• Local Coastal Program: RM-D (Multiple Unit Residential - 20.0 - 29.9 DUWC) and
PC-59 Lido Villas
PROJECT SUMMARY
A Limited Term Permit for temporary employee parking for up to one year for contractor
and subcontractors who are building the Lido House Hotel. No storage of construction
equipment or materials is proposed. The fenced, secured and screened lot would be open
for employee vehicle parking from 6:30 a.m. to 6:00 p.m. daily.
RECOMMENDATION
1) Conduct a public hearing;
2) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301 (Existing Facilities), 15303 (New Construction) and
Section 15304 of the CEQA Guidelines, because it has no potential to have a
significant effect on the environment; and
1
3) Adopt Draft Zoning Administrator Resolution No. _ approving Limited Term Permit
No. XP2017-001 (Attachment No. ZA 1).
DISCUSSION
RD Olson Construction is currently building a 130-room hotel at the northeast corner of
the intersection of Newport Boulevard and 32nd Street. They are required to provide off-
street parking for construction workers. The number of workers will vary from day-to-day
and is not expected to exceed 100 workers each day. As noted, no storage of construction
materials or equipment will occur at the site.
The subject lot is vacant and 1.2 acres in area. A portion of the lot is paved with asphalt
and was the parking lot for the prior land use. The balance of the site is covered with
gravel where the previous buildings were demolished. The lot is located across Via
Oporto from Fire Station 2 and is within approximately 100 feet of the hotel construction
site. The lot is located in predominately a commercial area with residential uses located
east of Via Lido. The nearby church (St. James) is not in operation presently; however,
the proposed use is a parking lot and should not present any detriment to the church if it
initiates activities.
The lot will have two vehicle gates at existing driveway approaches, one on Via Oporto
and the second on Via Malaga. No access to Via Lido is planned or allowed. The existing
public sidewalks that border the site will remain available for public use. The lot is currently
fenced and planned for development of 23 townhouses. The Lido Villas townhouse
project is on hold at this time.
The applicant is seeking authorization for use of the lot for construction worker parking
for up to one year, which should be a sufficient duration for completion of the hotel
construction. The applicant has a month-to-month lease from the property owner and
could lose the privilege to use the lot for parking should the townhouse project initiate
construction. The approved construction management plan for the hotel requires off-
street parking for workers and should the applicant lose the privilege of parking at the site
due to construction of the townhouses, the applicant would be required to replace the off-
street parking at a suitable and yet to be determined site in accordance with the approved
Lido House Hotel construction management plan.
The parking lot will be open from 6:30 a.m. to 6:00 p.m. daily when construction at the
hotel site is occurring. The gates will be open during use of the lot and secured after
hours. No improvements to the lot are proposed given its temporary nature and planned
future development. The site will not be open to general public use, and therefore, does
not need to comply with development standards for parking lots. Fencing, gate positions
and access have been reviewed and approved by both the Public Works Department and
Life Safety Service Divisions.
Staff has included conditions of approval to ensure efficient and appropriate operations
at the site to ensure the site is not detrimental to the area. For these reasons, staff
believes each of the required findings for a Limited Term Permit can be made. The
findings are provided in the attached resolution.
Tmplt 01/17/17
ENVIRONMENTAL REVIEW
This project is exempt from the California Environmental Quality Act (CEQA) pursuant to
Section 15301 (Existing Facilties), 15303 (New Construction) and Section 15304 (Minor
Alterations to Land) of the CEQA Guidelines, California Code of Regulations, Title 14,
Chapter 3, because it has no potential to have a significant effect on the environment. The
existing vacant and fenced lot will be used for the temporary parking of construction worker
automobiles for up to one year. No construction or other improvements will occur and no
permanent use of the property is authorized.
PUBLIC NOTICE
Notice of this application was published in the Daily Pilot, mailed to all owners of property
within 300 feet of the boundaries of the site (excluding intervening rights-of-way and
waterways), including the applicant, and posted on the subject property at least 10 days
before the scheduled hearing, consistent with the provisions of the Municipal Code.
Additionally, the item appeared on the agenda for this meeting, which was posted at City
Hall and on the City website.
APPEAL PERIOD:
An appeal or call for review may be filed with the Director of Community Development within
14 days following the date of action. For additional information on filing an appeal, contact
the Planning Division at (949) 644-3200.
Prepared by:
W C k
efo
J es Campbell, Principal Plariner
Attachments: ZA 1 Draft Resolution
ZA 2 Vicinity Map
ZA 3 Site Plan
TmpIL 01/12/17
Attachment No. ZA 1
Draft Resolution
4
RESOLUTION NO. ZA2017-###
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING LIMITED TERM
PERMIT NO. XP2017-001 A TEMPORARY EMPLOYEE PARKING
LOT LOCATED AT 3303 AND 3355 VIA LIDO (PA2017-009)
THE ZONING ADMINSTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by RD Olson Construction, Inc., with respect to property located at
3303 and 3355 Via Lido, and legally described as Lots 1201, 1202, 1203, 1204 of Tract 907
with an abandoned alley and portions of Lots 4 and 5 of Tract 1107, requesting approval of a
Limited Term Permit to utilize the property for one year as a temporary employee parking lot
for construction workers of the Lido House Hotel project located at 3300 Newport Boulevard.
2. The subject property is designated Multiple-Unit Residential (RM) by the Land Use Element
of the General Plan. Zoning of the property is PC-59 (Planned Community - Lido Villas) and
is subject to the Lido Villas Planned Community Development Plan.
3. The project site is designated Multiple-Unit Residential (RM) by the Coastal Land Use Plan.
The Coastal Zoning of the property is PC-59 (Planned Community).
4. Newport Beach Municipal Code (NBMC) Section 20.52.040, Limited Term Permits, allows
consideration of limited duration uses (e.g., interim, nonpermanent, and/or seasonal in nature)
that might not meet the development or use standards of the applicable zoning district, but
may otherwise be acceptable because of their temporary or limited nature and are found to
be compatible with adjacent and surrounding uses.
5. A public hearing was held on February 16, 2017, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach, California, 96220. A notice of
time, place and purpose of the meeting was given in accordance with the Newport Beach
Municipal Code. Evidence, both written and oral, was presented to, and considered by, the
Zoning Administrator at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. The project is exempt pursuant to Sections 15301 (Existing Facilities), 15303 (New
Construction or Conversion of Small Structures) and 15304 (Minor Alterations to Land), of
the California Environmental Quality Act (CEQA) Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on
the environment.
2. Section 15301 (Class 1) consists of the operation, repair, maintenance, permitting, leasing,
licensing, or minor alteration of existing public or private structures, facilities, mechanical
equipment, or topographical features, involving negligible or no expansion of use. The
5
Zoning Administrator Resolution No. ZA2017-###
Page 2 of 8
vacant lot would be used for employee vehicle parking on an interim, temporary basis and
no permanent structures would be authorized.
3. Section 15303 (Class 4) Class 3 consists of construction and location of limited numbers of
new, small facilities or structures; installation of small new equipment and facilities in small
structures; and the conversion of existing small structures from one use to another where
only minor modifications are made in the exterior of the structure. The temporary parking
lot requires security fences and gates to be installed. A temporary security fence with gates
will be the only improvement to the site.
4. Section 15304 (Class 4) consists of minor public or private alterations in the condition of land,
water, and/or vegetation which do not involve removal of healthy, mature, scenic trees. The
site is devoid of vegetation and improvements/alterations to the site are limited to fences with
gates that will be installed on a temporary basis during the interim use.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 20.52.040.G (Findings and Decision) of the Newport Beach
Municipal Code, the following findings and facts in support of the findings for a Limited Term
Permit are set forth:
Findinq:
A. The operation of the requested limited duration use at the location proposed and within the
time period specified would not be detrimental to the harmonious and orderly growth of the
City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience,
health, interest, safety, or general welfare of persons residing or working in the
neighborhood of the requested limited duration use.
Facts in Support of Finding:
1. The site is located in predominately a commercial area and is subject to the conditions of
approval in Exhibit A.
2. Residential uses are located east of Via Oporto and access to the site is from Via Oporto
and Via Malaga.
3. A church is located south of Via Malaga; however, it is not in operation at this time. The
church could begin operations at any time; however, the proposed use is a parking lot
generally used during the day and not on weekends when services would not generally be
held.
4. A perimeter security and screening fence will be provided. The site is paved with asphalt
and gravel.
5. The hours of operation are limited to 6:30 a.m. to 6:00 p.m. daily. Construction workers shall
not arrive prior to the gates opening. Construction workers shall not park on public streets
or in public parking lots.
01-03-17
Zoning Administrator Resolution No. ZA2017-###
Page 3 of 8
6. The operation of the interim use would eliminate employee parking in public spaces within
the public right-of-way or in public parking lots near the proposed construction site, which
could be detrimental to uses currently operating in the area and public parking in the
neighborhood.
Finding:
B. The subject lot is adequate in size and shape to accommodate the limited duration use
without material detriment to the use and enjoyment of other properties located adjacent to
and in the vicinity of the lot.
Facts in Support of Finding:
1. The site is 1.2 acres and is located in a predominately commercial area.
2. The site is large enough to provide setbacks to vehicular gates to facilitate efficient vehicle
access to the site without creating significant vehicle conflicts within the abutting right of
way.
Finding:
C. The subject lot is adequately served by streets or highways having sufficient width and
improvements to accommodate the kind and quantity of traffic that the limited duration use
would or could reasonably be expected to generate.
Facts in Support of Finding:
1. The site is bounded by three public streets, Via Oporto, Via Malaga and Via Lido. One
driveway is located along the Via Oporto frontage and a second is located on Via Malaga.
No access is provided or proposed from Via Lido. The number of employees parking at the
site will vary per day and is not expected to exceed 100 vehicles.
2. Via Oporto is a 40-foot-wide right-of-way and provides one-way traffic and parking along
both sides of the street. Vehicle traffic for the proposed parking lot will be with typical
passenger vehicles and can be accommodated from Via Oporto.
3. Via Malaga is a 35-foot-wide right-of-way and provides two-way traffic and parking only on
one side of the street. Entering and exiting the site at the existing driveway with typical
passenger vehicles associated with the previous commercial and institutional development
was accommodated. Vehicle traffic for the proposed parking lot will be with typical
passenger vehicles and can be accommodated from Via Malaga.
4. The Public Works Department and Life Safety Services Division have reviewed the
proposed temporary use and find the site, proposed access points from the abutting streets,
and the location of fences and gates appropriate for the proposed use.
01-03-17
Zoning Administrator Resolution No. ZA2017-###
Page 4 of 8
Finding:
D. Adequate temporary parking to accommodate vehicular traffic to be generated by the limited
duration use would be available either on-site or at alternate locations acceptable to the
Zoning Administrator.
Facts in Support of Finding:
1. The limited term use is a parking lot and does not generate its own parking demand,
therefore this finding does not apply.
Finding:
E. The limited duration use is consistent with all applicable provisions of the General Plan, any
applicable specific plan, Municipal Code, and other City regulations.
Facts in Support of Finding:
1. The Land Use Element provides guidance regarding the ultimate pattern of development
for Newport Beach at build-out. The General Plan designates the site for residential use
and the proposed interim use for parking does not preclude residential development
consistent with the General Plan at build-out.
2. The Circulation Element includes Goal 7.1 to ensure an adequate supply of convenient
parking be provided throughout the City. The proposed temporary off-street parking lot
avoids construction employees from potentially occupying public parking spaces in the area
during the construction of the Lido House Hotel consistent with Circulation Element Goal
7.1.
3. The site is not subject to a specific plan.
4. The temporary parking lot is an interim use of a vacant property and would not be open to
the general public for parking. As a result, the minimum development standards of the
Zoning Code for the development of a parking lot do not apply.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Limited Term Permit
No. XP2017-001 subject to the findings provided in this resolution and the conditions set forth
in Exhibit A, which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution was
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 20 Planning and Zoning, of
the Newport Beach Municipal Code.
01-03-17
g
Zoning Administrator Resolution No. ZA2017-###
Page 5 of 8
PASSED, APPROVED, AND ADOPTED THIS 16th DAY OF FEBRUARY, 2017.
Patrick J. Alford, Zoning Administrator
01-03-17
9
Zoning Administrator Resolution No. ZA2017-###
Page 6 of 8
EXHIBIT "A"
CONDITIONS OF APPROVAL
1. The site is limited to the daily and non-overnight parking of construction worker personal
vehicles for RD Olson Construction and their subcontractors related to their work on the Lido
House Hotel project and directly related construction only.
2. The site shall not be used for the storage of any construction material or debris of any kind
or origin. No construction equipment or deliveries of any material is permitted at the site or
within any abutting public right-of-way.
3. Anything not specifically approved by this limited term permit is prohibited and shall be
addressed by a separate and subsequent review.
4. Limited Term Permit No. XP2017-001 shall expire tw. (12) months from the effective
date unless an extension is granted by the Zoni dministrator. Extensions may be
granted up to a total of twelve (12) months.
5. The hours of allowed operation shall be between 6:30 a.m. to 6:00 p.m. daily. Construction
workers shall not arrive prior to the gates opening. Construction workers shall not park on
public streets or in public parking lots.
6. The general public shall not be permitted to use and/or drive through the temporary
parking lot. Signs shall be posted at both entries indicating the site is used for RD Olson
and subcontractor construction worker parking only and that the site is not for general
public parking. The sign shall include the mobile phone number for the Lido House Hotel
job superintendent for any inquiries related to the operation of the temporary parking lot.
7. No queuing of vehicles to gain entry to the site within the public right-of-way is allowed.
Gates shall remain open during the hours of operation and shall be secured at the end of
each working day.
8. A six-foot-high perimeter fence and gates with screening shall be maintained at all times.
The location of the fencing shall be in accordance with the approved diagram. Minor
adjustments may be made subject to the approval of the Public Works Department. The
fencing shall comply with the City's sight distance requirement. See City Standard 110-L
and Municipal Code 20.30.130. The abutting public sidewalk shall be maintained free of
obstruction at all times.
9. Emergency vehicle access shall be maintained on-site at all times. An emergency drive
aisle loop with a minimum 20-foot width shall be maintained that continues throughout the
temporary parking lot to both vehicular access points.
10. All gates shall swing into the project site and gate providing vehicle access shall provide
a minimum 26 feet of clearance. All vehicle access points/gates shall have Knox padlocks
for fire access.
11. The lot must be kept free of trash, debris and weeds at all times.
01-03-17
10
Zoning Administrator Resolution No. ZA2017-###
Page 7 of 8
12. In compliance with SCAQMD Rule 403, excessive fugitive dust emissions shall be
controlled by regular watering or other dust prevention measures, as specified in the
SCAQMD's Rules and Regulations. In addition, SCAQMD Rule 402 requires
implementation of dust suppression techniques to prevent fugitive dust from creating a
nuisance off-site. All active portions of the parking lot shall be watered as necessary to
prevent excessive amounts of dust.
13. The applicant shall install and maintain a perimeter erosion control barrier to the
satisfaction of the City to ensure that soil is not transported off-site during rain events.
14. The applicant shall sweep adjacent streets and sidewalks daily if visible soil material is
carried from the site onto adjacent public streets or sidewalks.
15. All vehicles parked at the site shall be operable at all times. No wrecked or inoperable
vehicles shall be parked or stored on-site.
16. The applicant, contractors, subcontractors and all employees shall observe construction
activity noise regulations of NBMC Chapter 10.28. No person shall generate noise while
using or accessing the site that disturbs, or could disturb, a person of normal sensitivity
who works or resides in the vicinity, on any weekday except between the hours of seven
a.m. and six-thirty p.m., nor on any Saturday except between the hours of eight a.m. and
six p.m. On Sundays and federal holidays, no person shall generate noise while using or
accessing the site that disturbs, or could disturb, a person of normal sensitivity who works
or resides in the vicinity.
17. No audible outside paging system shall be utilized in conjunction with this temporary use.
18. If any temporary lighting is provided, the site shall not be excessively illuminated based
on the luminance recommendations of the Illuminating Engineering Society of North
America, or, if in the opinion of the Director of Community Development, the illumination
creates an unacceptable negative impact on surrounding land uses or environmental
resources. The Director may order the dimming or elimination of light sources or other
remediation upon finding that the site is excessively illuminated.
19. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
20. The applicant shall comply with all federal, state, and local laws. Material violation of any
of those laws in connection with the use may be cause for revocation of this Limited Term
Permit.
21. This Limited Term Permit may be modified or revoked by the Zoning Administrator if
determined that the proposed uses or conditions under which it is being operated or
maintained is detrimental to the public health, welfare or materially injurious to property or
improvements in the vicinity or if the property is operated or maintained so as to constitute
a public nuisance.
01-03-17
22
Zoning Administrator Resolution No. ZA2017-###
Page 8 of 8
22. Any change in operational characteristics, expansion in area, or other modification to the
approved plans, shall require an amendment to this Limited Term Permit or the processing
of a new Limitd Term Permit.
23. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the current
business owner, property owner or the leasing agent.
24. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney's fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City's
approval of RD Olson Construction Worker Parking Lot Limited Term Permit including, but
not limited to, XP2017-001. This indemnification shall include, but not be limited to, damages
awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred
in connection with such claim, action, causes of action, suit or proceeding whether incurred
by applicant, City, and/or the parties initiating or bringing srh proceeding. The applicant
shall indemnify the City for all of City's costs, attorneys'fees, and damages which City incurs
in enforcing the indemnification provisions set forth in this condition. The applicant shall pay
to the City upon demand any amount owed to the City pursuant to the indemnification
requirements prescribed in this condition.
01-03-17
Attachment No. ZA 2
Vicinity Map
13
VICINITY MAP
e
3p
33f
J J
350,
I
Hotel Construction site WA MRIAGA
1• C
�W Li
32ND Si 4� Vae
J
Oleclalmer. Every mamnade enrol M,i been maEC to assure me eccwacy ohne EeU
e Newport 0 100 200 erovEea.lwevec 11,e Ph m Neeym Beecn ane n:emgoyee:a,w
C Beachepeds M1ulerm em am.reapm
om,dwly fr or reeryre
real,,to suAs
° GIS O Feel o m �e ne aae
Iagery: 30042020 1)proms par,EeO M Eagle lmepnp xvrvi eepkaenel cm
MCI
Limited Term Permit No. XP2017-001
PA2017-009
3303 & 3355 Via Lido
Attachment No. ZA 3
Project Plans
15
1
l
Y• i
I `
r
e _ -
{ Lido I-louse Hotel "
i enporary Construction 1 '
Parking Lot (y1
22'.0"setback from
•
street.when tate
opened. /
�. ary
A 716
1f
Tmplr 01/17/17
2�
ZONING ADMINISTRATOR-FEBRUARY 16, 2017
ITEM NO. 1A-ADDITIONAL MATERIALS RECEIVED
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
From: Don & Judy Cole fmailto:lagunahouse(@me.coml
Sent: Saturday, February 11, 2017 1:59 PM
To: Campbell, James <JCampbell(a)a.newportbeachca.gov>
Cc: Kiff, Dave <DKiff(a)newportbeachca.gov>
Subject: Re: Public Notice PA2017-009
Thank you very much for your response-the staff report was very helpful and answered a lot of our
questions. While using the lot for temporary parking ideally makes a lot of sense, we do feel there are
some issues that need to be addressed. Of immediate concern is the lot entrance/exit plans and the
impact of the additional traffic into and out of one way streets. We also believe that there are some errors,
omissions and misleading statements that we feel should be corrected in the staff report.
1. See page 2 in the second paragraph under DISCUSSION- "The lot is located in predominately
a commercial area with residential uses located east of Via Lido."This is vague and misleading. In fact,
directly across the street from one one of the longest sides of the lot on Via Lido are 12 residences. In the
bigger picture, It could be argued that the lot and the commercial areas off Newport Blvd. are in the
middle of a predominately residential area.
2. Page 2, paragraph 3- "The lot will have two vehicle gates at existing driveway approaches, one on Via
Oporto and the second on Via Malaga. No access to Via Lido is planned or allowed". Even without
allowed access on Via Lido, this is problematic. The previous on site parking was limited to a small part of
the lot-the buildings took up the majority of space-and it was not open to all the tenants. Rarely were
there more than a handful of cars in the lot, except on Sunday. There will now be the potential of up to
100 cars entering on Via Oporto and exiting on either Via Oporto or Via Malaga.
3. Page 6, Section 3., Finding A-"The operation of the requested limited duration use at the location
proposed and within the time period specified would not be detrimental to the harmonious and orderly
growth of the City, or endanger,jeopardize, or otherwise constitute a hazard to the public convenience,
health, interest, safety, or general welfare of persons residing or working in the neighborhood of the
requested limited duration use" We don't see that the facts support this finding. We take issue with
Finding 1 that the site is located in predominately commercial area. Finding 2 states"Residential uses are
located east of Via Oporto and access to the site is from Via Oporto and Via Malaga."This is inaccurate.
Residential uses are also to the north, directly across the street on Via Lido and on Lido Island. It is hard
to imagine how the increase in vehicles (up to 100)entering the lot- primarily from Via Lido to Via Oporto-
would not constitute a hazard to the public convenience, interest, safety, or general welfare of persons
residing in the area or working or shopping in the neighborhood. In addition to an increase in vehicle
traffic from the revitalized Lido Marina Village, Via Lido is also experiencing a large increase in pedestrian
traffic.
4. Page 7, Section 3, Finding C-"The subject lot is adequately served by streets or highways having
sufficient width and improvements to accommodate the kind and quantity of traffic that the limited duration
use would or ould reasonably be expected to generate'. The facts don't support this. See Facts in
Support of Finding, #3- "Via Malaga is a 35-foot-wide right-of-way and provides two-way traffic and
parking only on one side of the street". In fact, Via Malaga is one way with parking on both sides of the
street leading to Via Lido. It is further stated that"Entering and exiting the site at the existing driveway
with typical passenger vehicles associated with the previous commercial and institutional development
was accommodated". As mentioned previously, the number of vehicles that were accommodated
previously was dramatically less than what is proposed. Further, any vehicle departing through the Via
Malaga driveway will have to exit to Via Lido and most likely they will turn left onto Via Lido to make the
most direct exit off the Peninsula at Newport Blvd. This means not only a back up of vehicles on Via
Malaga waiting to turn at the stop sign onto Via Lido, but up to 100 cars are most likely passing in front of
the residences on Via Lido at the end of the work day, creating a big increase in traffic and making it
difficult for the residences to enter or exit their driveways/garages. The crosswalks and increased
pedestrian traffic complicate it further.
ZONING ADMINISTRATOR-FEBRUARY 16, 2017
ITEM NO. 1A-ADDITIONAL MATERIALS RECEIVED
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
We have no problem in concept with a temporary lot at 3303/3355 Via Lido, but our opinion is that the
City's findings as stated are flawed. The Limited Term Permit should not be approved until the issues are
addressed and the errors in the staff report corrected. Thank you again,
Don &Judy Cole
On Feb 10, 2017, at 9:12 AM, Campbell, James <JCampbell(cDnewportbeachca.gov>wrote:
Don &Judy,
Thank you for the message. Attached to this message is the agenda and staff report for the RD Olson
application to use the vacant lot across the street from you property for temporary parking. The staff
report should give you the information you seek, but if not, please let me know and I will answer your
questions.
The Zoning Administrator will consider and likely act on the request on the February 16th. You are free to
attend and participate in the hearing or if you can submit written comments for consideration,just send
them to me and I will ensure the Zoning Administrator received them.
As to the planned and approved townhouse project, the owner continues to weigh their options as they
feel the project is not financially viable at this point. They have not shared any timetable with me.
Jim Campbell
Principal Planner
949-644-3210
-----Original Message-----
From: Don &Judy Cole fmailto:lagunahouse(a)me.coml
Sent:Wednesday, February 08, 2017 1:40 PM
To: Campbell, James <JCampbell((Dnewportbeachca.gov>
Cc: Kiff, Dave <DKiff(a)newportbeachca.gov>
Subject: Public Notice PA2017-009
Good afternoon,
We just returned from a trip to find the notice referenced above on the site location at 3303 and 3355 Via
Lido, which is across the street from our home. As whatever happens on this site has significant impact
on us, we have attempted to find out more information. In a link connected to the agenda for the Zoning
Administrator meeting on the 16th, we found that File#17-0822 Version 1 shows approved, and that final
action is open pending the public notice and hearing. Other than that, we have been unable to find any
other background on this application. The last we knew, the site was to be developed as townhomes by
another developer, but it appears that there has been an ownership change. Please let us know where
we can find out more information on the plans for this site- both short term and long term as well as any
other background and staff reports that led to the initial approval of this application for a parking lot
(temporary or not)on a site that is zoned RM Multiple unit Residential. Thank you in advance for your
feedback and assistance. Sincerely, Don &Judy Cole
<Agenda (10).pdf><Item No (4).pdf>
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1 B-ADDITIONAL MATERIALS RECEIVED
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Subject: RD Olsen parking lot proposed on Via Malaga, Via Oporto, and Via Lido
-----Original Message-----
From: Pamela Whitesides [mailto:ptlaw@sbcglobal.net]
Sent:Tuesday, February 14, 2017 10:49 AM
To: Campbell,James <JCampbell@newportbeachca.gov>
Subject: RD Olsen parking lot proposed on Via Malaga,Via Oporto, and Via Lido
Dear Mr. Campbell,
The Zoning Administrator is set to consider the RD Olsen proposed temporary parking lot. I am a resident on Via Lido
and I must point out that the staff report's findings are riddled with errors and require correction and further analysis.
1. Not predominantly residential;the staff ignored residents on Via Lido: The area is not predominantly commercial,
with residential uses only to the east of Via Oporto. For some reason the staff report fails to mention the 12 residences
on Via Lido, right across the street from the proposed parking lot, with garages that require residents to back out of their
garages onto Via Lido. Obviously,these residents will be most detrimentally affected by the proposal.
2. Via Malaga is a one-way street with parking on both sides, not two-way with parking on one side: The proposal
indicates the parking lot's main entrance/exit will be on Via Malaga, and the Via Oporto entrance/exit will be an
emergency exit.The staff report states that Via Malaga is a two-way street with parking on one side. Not true.A visit at
the sight or internet search would have shown that Via Malaga is a one-way street with parking on both sides.
3. The proposal dumps all the exiting traffic onto Via Lido: The report assures that "no access" is planned or allowed on
Via Lido, probably in recognition that Via Lido is the main entrance to and from Lido Isle and an extremely busy street.
In truth, if approved the proposal will empty all of the cars from the one-way Via Malaga exit onto Via Lido, and up to
100 exiting cars will be turning left across the traffic to and from Lido Isle and directly in front of the residences on Via
Lido. It is already a challenge for residents backing out of their garages while dodging the traffic speeding around the
curve off of Lido Isle,which traffic gets heavier at quitting time for construction/landscaping/maintenance workers. Add
the continuous stream of employees' cars exiting onto Via Lido and it will make it almost impossible to safely back out of
our garages onto Via Lido. Contrary to the staff report,the plan will make Via Lido a more dangerous street and be a
hazard to residents, pedestrians and traffic.
4. Please make screening more permanent than currently exists: The empty lot currently has fabric screening that
repeatedly blows away. This last time the screening has not been replaced. If and when you approve a final proposal,
please make as a condition of approval that RD Olsen install a more secure and permanent screening.
I respectfully request that you reconsider this proposal, correct the staff findings in view of the realities on the ground,
and design a fix that routes traffic away from Via Lido, not onto it.
Thank you,
Pam Whitesides
3328 Via Lido
1
itt WOIler1 Tog a 4 ` Ov Wim, F
s B aft Sal'any '- • .IN
•- v - 1
r _
S
Per
Church of
Chrls.l `Mist
\ -' � • • �hrl5tl n SclenCe 1�1 - •• '�+.
� Flr t •hurch
F
i"
Saverst
.St'Affi the Greatr rent Ep s
° �^ Episco Church
111
1
l 1'
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
RESOLUTION NO. ZA2017-###
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING LIMITED TERM
PERMIT NO. XP2017-001 A TEMPORARY EMPLOYEE PARKING
LOT LOCATED AT 3303 AND 3355 VIA LIDO (PA2017-009)
THE ZONING ADMINSTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by RD Olson Construction, Inc., with respect to property located at
3303 and 3355 Via Lido, and legally described as Lots 1201, 1202, 1203, 1204 of Tract 907
with an abandoned alley and portions of Lots 4 and 5 of Tract 1107, requesting approval of a
Limited Term Permit to utilize the property for one year as a temporary employee parking lot
for construction workers of the Lido House Hotel project located at 3300 Newport Boulevard.
2. The subject property is designated Multiple-Unit Residential (RM) by the Land Use Element
of the General Plan. Zoning of the property is PC-59 (Planned Community - Lido Villas) and
is subject to the Lido Villas Planned Community Development Plan.
3. The project site is designated Multiple-Unit Residential (RM) by the Coastal Land Use Plan.
The Coastal Zoning of the property is PC-59 (Planned Community).
4. Newport Beach Municipal Code (NBMC) Section 20.52.040, Limited Term Permits, allows
consideration of limited duration uses (e.g., interim, nonpermanent, and/or seasonal in nature)
that might not meet the development or use standards of the applicable zoning district, but
may otherwise be acceptable because of their temporary or limited nature and are found to
be compatible with adjacent and surrounding uses.
5. A public hearing was held on February 16, 2017, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach, California, 96220. A notice of
time, place and purpose of the meeting was given in accordance with the Newport Beach
Municipal Code. Evidence, both written and oral, was presented to, and considered by, the
Zoning Administrator at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. The project is exempt pursuant to Sections 15301 (Existing Facilities), 15303 (New
Construction or Conversion of Small Structures) and 15304 (Minor Alterations to Land), of
the California Environmental Quality Act (CEQA) Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on
the environment.
2. Section 15301 (Class 1) consists of the operation, repair, maintenance, permitting, leasing,
licensing, or minor alteration of existing public or private structures, facilities, mechanical
equipment, or topographical features, involving negligible or no expansion of use. The
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 2 of 8
vacant lot would be used for employee vehicle parking on an interim, temporary basis and
no permanent structures would be authorized.
3. Section 15303 (Class 4) Class 3 consists of construction and location of limited numbers of
new, small facilities or structures; installation of small new equipment and facilities in small
structures; and the conversion of existing small structures from one use to another where
only minor modifications are made in the exterior of the structure. The temporary parking
lot requires security fences and gates to be installed. A temporary security fence with gates
will be the only improvement to the site.
4. Section 15304 (Class 4) consists of minor public or private alterations in the condition of land,
water, and/or vegetation which do not involve removal of healthy, mature, scenic trees. The
site is devoid of vegetation and improvements/alterations to the site are limited to fences with
gates that will be installed on a temporary basis during the interim use.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 20.52.040.G (Findings and Decision) of the Newport Beach
Municipal Code, the following findings and facts in support of the findings for a Limited Term
Permit are set forth:
Finding:
A. The operation of the requested limited duration use at the location proposed and within the
time period specified would not be detrimental to the harmonious and orderly growth of the
City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience,
health, interest, safety, or general welfare of persons residing or working in the
neighborhood of the requested limited duration use.
Facts in Support of Finding:
1. The site is located in a mixed-use area, with predominately commercial uses to the west
and north, institutional uses to the south, and residential uses to the east. Thp 'Wp. IAAAtoa
A.
2. Residential uses are located east of Via Lido Qpsrte-and access to the site is from Via
Oporto and Via Malaga.
3. A church is located south of Via Malaga; however, it is not in operation at this time. The
church could begin operations at any time; however, the proposed use is a parking lot
generally used during the day and not on weekends when services would not generally be
held.
4. A perimeter security and screening fence will be provided. The site is paved with asphalt
and gravel.
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 3 of 8
5. The hours of operation are limited to 6:30 a.m. to 6:00 p.m. daily. Construction workers shall
not arrive prior to the gates opening. Construction workers shall not park on public streets
or in public parking lots.
6. The project approval includes conditions that will minimize disturbances to residents in the
adjacent mixed-use and residential areas.The apeFatien of the 'nteF'M , would eliminate
Finding:
B. The subject lot is adequate in size and shape to accommodate the limited duration use
without material detriment to the use and enjoyment of other properties located adjacent to
and in the vicinity of the lot.
Facts in Support of Finding:
1. The site is 1.2 acres and is located in a predominately commercial area.
2. The site is large enough to provide setbacks to vehicular gates to facilitate efficient vehicle
access to the site without creating significant vehicle conflicts within the abutting right of
way.
Finding:
C. The subject lot is adequately served by streets or highways having sufficient width and
improvements to accommodate the kind and quantity of traffic that the limited duration use
would or could reasonably be expected to generate.
Facts in Support of Finding: AN
1. The site is bounded by three public streets, Via Oporto, Via Malaga and Via Lido. One
driveway is located along the Via Oporto frontage and a second is located on Via Malaga.
No access is provided or proposed from Via Lido. The number of employees parking at the
site will vary per day and is not expected to exceed 100 vehicles.
2. Via Oporto is a 40-foot-wide right-of-way and provides one-way southbound traffic and
parking along both sides of the street. Vehicle traffic for the proposed parking lot will be with
typical passenger vehicles and can be accommodated from Via Oporto.
3. Via Malaga is a 35-foot-wide right-of-way and provides tweone-way traffic and parking only
on both sides anp s da of the street. Entering and exiting the site at the existing driveway
with typical passenger vehicles associated with the previous commercial and institutional
development was accommodated. Vehicle traffic for the proposed parking lot will be with
typical passenger vehicles and can be accommodated from Via Malaga.
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 4 of 8
4. The Public Works Department and Life Safety Services Division have reviewed the
proposed temporary use and find the site, proposed access points from the abutting streets,
and the location of fences and gates appropriate for the proposed use.
Finding:
D. Adequate temporary parking to accommodate vehicular traffic to be generated by the limited
duration use would be available either on-site or at alternate locations acceptable to the
Zoning Administrator.
Facts in Support of Finding:
1. The limited term use is a parking lot and does not generate its own parking demand,
therefore this finding does not apply.
Finding:
E. The limited duration use is consistent with all applicable provisions of the General Plan, any
applicable specific plan, Municipal Code, and other City regulations.
Facts in Support of Finding:
1. The Land Use Element provides guidance regarding the ultimate pattern of development
for Newport Beach at build-out. The General Plan designates the site for residential use
and the proposed interim use for parking does not preclude residential development
consistent with the General Plan at build-out.
2. The Circulation Element includes Goal 7.1 to ensure an adequate supply of convenient
parking be provided throughout the City. The proposed temporary off-street parking lot
avoids construction employees from potentially occupying public parking spaces in the area
during the construction of the Lido House Hotel consistent with Circulation Element Goal
7.1.
3. The site is not subject to a specific plan.
4. The temporary parking lot is an interim use of a vacant property and would not be open to
the general public for parking. As a result, the minimum development standards of the
Zoning Code for the development of a parking lot do not apply.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Limited Term Permit
No. XP2017-001 subject to the findings provided in this resolution and the conditions set forth
in Exhibit A, which is attached hereto and incorporated by reference.
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 5 of 8
2. This action shall become final and effective 14 days following the date this Resolution was
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 20 Planning and Zoning, of
the Newport Beach Municipal Code.
PASSED, APPROVED, AND ADOPTED THIS 16th DAY OF FEBRUARY, 2017.
Patrick J. Alford, Zoning Administrator
00)
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 6 of 8
EXHIBIT "A"
CONDITIONS OF APPROVAL
1. The site is limited to the daily and non-overnight parking of construction worker personal
vehicles for RD Olson Construction and their subcontractors related to their work on the Lido
House Hotel project and directly related construction only.
2. The site shall not be used for the storage of any construction material or debris of any kind
or origin. No construction equipment access or parking, or deliveries of any material is
permitted at the site or within any abutting public right-of-way.
3. Anything not specifically approved by this limited term permit is prohibited and shall be
addressed by a separate and subsequent review.
4. Limited Term Permit No. XP2017-001 shall expire twelve (12) months from the effective
date unless an extension is granted by the Zoni dministrator. Extensions may be
granted up to a total of twelve (12) months.
5. The hours of allowed operation shall be between 6:30 a.m. to 6:00 p.m. daily. Construction
workers shall not arrive prior to the gates opening. Construction workers shall not park on
public streets or in public parking lots.
6. The general public shall not be permitted to use and/or drive through the temporary
parking lot. Signs shall be posted at both entries indicating the site is used for RD Olson
and subcontractor construction worker parking only and that the site is not for general
public parking. The sign shall include the mobile phone number for the Lido House Hotel
job superintendent for any inquiries related to the operation of the temporary parking lot.
7. No queuing of vehicles to gain entry to the site within the public right-of-way is allowed.
Gates shall remain open during the hours of operation and shall be secured at the end of
each working day.
8. A six-foot-high perimeter fence and gates with screening shall be maintained in good
condition at all times. The location of the fencing shall be in accordance with the approved
diagram. Minor adjustments may be made subject to the approval of the Public Works
Department. The fencing shall comply with the City's sight distance requirement. See City
Standard 110-L and Municipal Code 20.30.130. The abutting public sidewalk shall be
maintained free of obstruction at all times.
9. Emergency vehicle access shall be maintained on-site at all times. An emergency drive
aisle loop with a minimum 20-foot width shall be maintained that continues throughout the
temporary parking lot to both vehicular access points.
10. All gates shall swing into the project site and gate providing vehicle access shall provide
a minimum 26 feet of clearance. All vehicle access points/gates shall have Knox padlocks
for fire access.
11. The lot must be kept free of trash, debris and weeds at all times.
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 7 of 8
12. In compliance with SCAQMD Rule 403, excessive fugitive dust emissions shall be
controlled by regular watering or other dust prevention measures, as specified in the
SCAQMD's Rules and Regulations. In addition, SCAQMD Rule 402 requires
implementation of dust suppression techniques to prevent fugitive dust from creating a
nuisance off-site. All active portions of the parking lot shall be watered as necessary to
prevent excessive amounts of dust.
13. The applicant shall install and maintain a perimeter erosion control barrier to the
satisfaction of the City to ensure that soil is not transported off-site during rain events.
14. The applicant shall sweep adjacent streets and sidewalks daily if visible soil material is
carried from the site onto adjacent public streets or sidewalks.
15. All vehicles parked at the site shall be operable at all times. No wrecked or inoperable
vehicles shall be parked or stored on-site.
16. The applicant, contractors, subcontractors and all employees shall observe construction
activity noise regulations of NBMC Chapter 10.28. No person shall generate noise while
using or accessing the site that disturbs, or could disturb, a person of normal sensitivity
who works or resides in the vicinity, on any weekday except between the hours of seven
a.m. and six-thirty p.m., nor on any Saturday except between the hours of eight a.m. and
six p.m. On Sundays and federal holidays, no person shall generate noise while using or
accessing the site that disturbs, or could disturb, a person of normal sensitivity who works
or resides in the vicinity.
17. No audible outside paging system shall be utilized in conjunction with this temporary use.
18. If any temporary lighting is provided, the site shall not be excessively illuminated based
on the luminance recommendations of the Illuminating Engineering Society of North
America, or, if in the opinion of the Director of Community Development, the illumination
creates an unacceptable negative impact on surrounding land uses or environmental
resources. The Director may order the dimming or elimination of light sources or other
remediation upon finding that the site is excessively illuminated.
19. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
20. The applicant shall comply with all federal, state, and local laws. Material violation of any
of those laws in connection with the use may be cause for revocation of this Limited Term
Permit.
21. This Limited Term Permit may be modified or revoked by the Zoning Administrator if
determined that the proposed uses or conditions under which it is being operated or
maintained is detrimental to the public health, welfare or materially injurious to property or
improvements in the vicinity or if the property is operated or maintained so as to constitute
a public nuisance.
01-03-17
ZONING ADMINISTRATOR-FEBRUARY 16,2017
ITEM NO. 1C-ADDITIONAL MATERIALS RECEIVED/STAFF-UPDATED RESOLUTION
RD OLSON CONSTRUCTION EMPLOYEE PARKING LOT(PA2017-009)
Zoning Administrator Resolution No. ZA2017-###
Page 8 of 8
22. Any change in operational characteristics, expansion in area, or other modification to the
approved plans, shall require an amendment to this Limited Term Permit or the processing
of a new Limited Term Permit.
23. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the current
business owner, property owner or the leasing agent.
24. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney's fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City's
approval of RD Olson Construction Worker Parking Lot Limited Term Permit including, but
not limited to, XP2017-001. This indemnification shall include, but not be limited to, damages
awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred
in connection with such claim, action, causes of action, suit or proceeding whether incurred
by applicant, City, and/or the parties initiating or bringing . proceeding. The applicant
shall indemnify the City for all of City's costs, attorneys'fees, a damages which City incurs
in enforcing the indemnification provisions set forth in this condition. The applicant shall pay
to the City upon demand any amount owed to the City pursuant to the indemnification
requirements prescribed in this condition.
25. The applicant shall conspicuously post and maintain signs on the interior side of the fence
and on the exterior of the fence at each entrance advising workers of nearby residences and
requesting that workers be courteous and respectful of our residential neighbors arriving and
leaving the work site and parking areas.
01-03-17