<,FORNP City Council Staff Report
April 11, 2017
Agenda Item No. 7
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Peter Tauscher, Senior Civil Engineer,
ptauscher@newportbeachca.gov
PHONE: 949-644-3316
TITLE: Central Avenue Public Dock — Award of Contract No. 8197-1 (17H12)
ABSTRACT:
Staff has received construction bids for Central Avenue Public Dock project and is requesting
City Council approval to award the contract to Associated Pacific Constructors, Inc.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant
to Class 4 Section 15303 Class 3 New Construction or Conversion of Small Structures of
the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has
no potential to have a significant effect on the environment;
b) Approve the project drawings and specifications;
c) Award Contract No. 8197-1 to Associated Pacific Constructors, Inc. (APC) for the total bid
price of $232,100.00 and authorize the Mayor and City Clerk to execute the contract; and
d) Establish $23,900.00, approximately 10 percent, contingency amount to cover the cost of
unforeseen work not included in the original contract.
FUNDING REQUIREMENTS:
The current adopted budget includes sufficient funding for this project. The following funds
will be expensed:
Account Description Account Number Amount
Contributions 13501-980000-17H12 $ 75,562.00
Tidelands Capital 10101-980000-17H12 $ 210,438.00
Total: $ 286,000.00
7-1
Central Avenue Public Dock — Award of Contract No
Proposed uses are as follows:
Vendor
Associated Pacific Constructors, Inc
Associated Pacific Constructors, Inc
Various and On -Call Services
8197-1 (17H12)
April 11, 2017
Page 2
Purpose Amount
Construction Contract $ 232,100.00
Construction Contingency $ 23,900.00
Printing, survey, testing, $ 30,000.00
inspection
Total: $ 286,000.00
State grant funds from the California Division of Boating and Waterways in the amount
$75,562.00 was accepted by the City Council at its March 28, 2017 meeting. Additionally, on
October 26, 2016, the City Council accepted a $350,000 donation from Newport Harbor
Yacht Club (NHYC) as a condition of its Coastal Development Permit as mitigation to
providing public access elsewhere in the harbor. Therefore, the State DBAW grant and the
NHYC donation will fund 100 percent of this project. After the public dock is constructed,
remaining funding from the NHYC donation will augment the funding needed for Central
Avenue Plaza improvements. The plaza project is in the final planning stage, and staff
anticipates construction after the pier project is complete.
DISCUSSION:
The Central Avenue Public Dock, located adjacent to the Newport Boulevard bridge and near
Lido Marina Village, has been recommended by the Harbor Commission as an ideal location
for providing public access to and from the water in an underserved part of the harbor.
Primary users of this dock are expected to be small dinghies from the anchorage, and other
smaller craft who will visit the local businesses.
The following summary illustrates a few of the design considerations noted during the bid
process:
• The proposed dock design was developed to allow the bidder to construct the new
dock from a variety of standard material including wood, concrete and even fiberglass.
• The 50 -foot gangway length maximizes accessibility to the greatest extent possible. In
addition, its diagonal position to the float relative to the seawall also minimizes the
extension of the float into the adjacent navigational channel that leads to/from the
Newport Boulevard Bridge.
• Cleat pattern: There are fourteen cleats spaced four feet apart on the backside of the
float for small dinghies. A 20 -foot vessel may dock on either end of the float, and at
least three to four smaller 20 -foot vessels may dock on the bayward side of the float.
• The bulkhead height will be raised less than one foot to comply with the City's Harbor
Standards.
• The float is ten feet wide to better accommodate side -tied 20 -foot vessels.
7-2
Central Avenue Public Dock — Award of Contract No. 8197-1 (17H12)
April 11, 2017
Page 3
At 10:00 a.m. on March 22, 2017, the City Clerk opened and read the following electronic
bids for this project:
BIDDER TOTAL BID AMOUNT
Low Associated Pacific Constructors, Inc. $232,100.00
2nd Bellingham Marine Industries, Inc. $338,762.00
3rd John S. Meek Company Inc. $377,270.00
The low bidder, Associated Pacific Constructors, Inc. possesses a California State
Contractors License Classification "A" as required by the project specifications. A check of
the contractor's references indicates satisfactory completion of similar projects for the City of
Newport Beach and other public agencies.
This proposed project involves constructing an 84 -foot long public dock system, piles,
gangway and accessories. Pursuant to the contract documents, the Contractor will have
eighty (80) consecutive working days to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California Environmental
Quality Act (CEQA) pursuant to Class 4 Section 15303 Class 3 New Construction or
Conversion of Small Structures of the CEQA Guidelines, California Code of Regulations, Title
14, Chapter 3, because it has no potential to have a significant effect on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of the
meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
7-3
W
J
m
CENTRALAVENUE
PUBLIC DOCK
CENTRAL AVENUE PUBLIC DOCK
17H12
LOCATION MAP
ATTACHMENT A
NEWPORT
HARBOR
NOT TO SCALE
PROJECT LIMITS
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-8197-1 I 4/11/17
7-4