HomeMy WebLinkAbout09 - Fire Station No. 6 Apparatus Bay Replacement ProjectSEW Pp�T CITY OF
-? NEWPORT BEACH
<,FORNP City Council Staff Report
April 11, 2017
Agenda Item No. 9
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Fong Tse, Assistant City Engineer, ftse@newportbeachca.gov
PHONE: 949-644-3321
TITLE: Fire Station No. 6 Apparatus Bay Replacement Project - Reject All
Bids - Contract No. 6422-1 (16F11)
ABSTRACT:
Staff has received bids for the Fire Station No. 6 Apparatus Bay Replacement Project. Staff
believes the best course of action is to reject all bids and re -advertise the project for new bids.
RECOMMENDATION:
a) Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15302 (Replacement or
Reconstruction) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter
3, because it has no potential to have a significant effect on the environment;
b) Reject all bids received for Contract No. 6422-1; and
c) Direct staff to re -advertise for bids.
FUNDING REQUIREMENTS:
No fiscal impact.
DISCUSSION:
At 2:00 PM on March 1, 2017, the City Clerk opened and read the following bids for this project:
BIDDER TOTAL BID AMOUNT
Low New Dynasty Construction $ 997,500.00
2 Metro Builders & Engineers Group, Ltd. $ 1,077,900.00
3 PCN3, Inc. $ 1,118,000.00
4 Dalke & Sons Construction, Inc. $ 1,278,457.00
5 Optima RPM $ 1,395,000.00
9-1
Fire Station No. 6 Apparatus Bay Replacement Project - Reject All Bids -
Contract No. 6422-1 (16F11)
April 11, 2017
Page 2
After the bid opening, the second low bidder submitted a letter to the City protesting the low
bidder's bid claiming it was non-responsive in complying with the contract's subcontracting
requirements. The low bidder then submitted a response. However, after reviewing the
information and non-responsive claim in more detail with the City Attorney's office, Staff
recommends that City Council reject all bids and direct staff to re -advertise the project for new
bids.
ENVIRONMENTAL REVIEW:
The Project consists of the demolition of the existing fire station garage and the construction of
a new taller garage to house fire vehicles that are taller than the existing garage openings. The
new garage structure will occupy the same space as the existing garage and will have the
same purpose and capacity to house fire station vehicles. As such, Staff recommends the City
Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant
to Section 15302 (Replacement or Reconstruction) of the CEQA Guidelines, California Code
of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on
the environment.
NOTICING:
The agenda item has been Noticed according to the Brown Act (72 hours in advance of the
meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Bid Protest Letter from Metro Builders & Engineers Group, Ltd.
Attachment C — Bid Protest Response Letter from New Dynasty Construction
9-2
PR
LO
MA
LEGEND
® PROJECT LOCATION
N.T.S. /
FIRE STATION NO. 6
APPARATUS BAY REPLACEMENT
LOCATION MAP
- NE
MARINERS DR
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-6422-1 1 04/11/17
9-3
Attachment B
Metro Builders & Engineers Group, ltd,
March 2, 2017
City of Newport Beach
Public Works Department
100 Civic Center Drive
Newport Beach, CA 92663
Attn: Fong Tse, Project Manager.
RE: Fire Station No, 6 Apparatus Bay Replacement -- Bid Date March 1, 2017
Bid Protest
Mr. Tse,
In. accordance with the Instructions to Bidders for the above referenced project, Metro Builders &
Engineers Group, Ltd. hereby protests the bid from New Dynasty Construction Co, dated March 1,
2017. After review of the aforementioned bid package and the bid documents provided by the City of
Newport Beach, our protest of the responsiveness of the apparent low bidder is as follows:
The special provisions state that all work "shall be done in accordance with ... (4) Standard
Specifications for Public Works Construction (2009 Edition)". Section 2-3.2 of the 2009
Greenbook states "The Contractor shall perform, with its own organization, Contract
work amounting to at least 50 percent of the Contract Price." New Dynasty Construction
Co. has listed a total subcontractor value of 54% of their contract value which violates this
requirement.
Additionally, specification section 08 3513 lists Byron Epp, Inc. as the manufacturer for
the Four Fold Metal Doors. These are specialty items that require experienced crews to
install. New Dynasty Construction. Co. does not list Byron Epp, Inc. or a proposed equal
subcontractor to perform this specialized scope of work.
Metro Builders & Engineers Group. Ltd, respectfully requests that the City of Newport Beach deem the
bid from New Dynasty Construction Co. non responsive and non -responsible and award the contract to
Metro Builders & Engineers Group, Ltd., as the lowest responsible responsive bidder.
Fouad Houalla
President
Metro Builders & Engineers Group, Ltd.
2610 Avon SPreei, Newport Beam, CA 92663-- Phone: 949.515.4350 Fox: 949.515, 3351 - r»etrobvilriers.corn
9-4
MEW ITMISTT
•D N S T R fes' C t I 0 N
yG7)3:1
3002 Dow Avenue, Suite 218 - Tiusi�n • CA 9780 • Te!- 9-49-512-6.300 . Fax: 949-502-6404
March 6, 2017
City of Newport Beach
Public Works Department
100 Ci vie Center Drive
Newport Beach, CA 92663
Attn: Fong Tse
Project Manager
subject: Response to Letter of Protest
Fire Station No. 6 Apparatus Bay Replacement
Contract Number: 6422
Dear Mr. Tse
This letter is being tendered by New Dynasty Construction who is the lowest bidder for Contract
Number 6422, in response to the protest letter dated 2March17 of Metra Builders & Engineers
Group, Ltd. of Newport Beach, CA. which is characterized New Dynasty construction's bid as
non-responsive.
1} Metro Builders have indicated that New Dynasty Construction required self perform
50% of work according to Green Boot: Standard 2009 Edition. In the most recent
case. Ghilotti Construction Co. v. City of Rielunond. an unsuccessful bidder
challenged a bid award because the winning contractor's bid dew,iated from contract
specifications. Atthoubh the lowest 'bidder hail proposed to subcontract more than
55% of the work 'In violation of the contract's 509.11 limit- the court held that the bid
could be brought into compliance with only slight alterations and avitl3out af'f'ecting
the amount of the hid. The court affirmed the contract and held that the public entity
merely waived an "inconsequential irregularity,'" The court was satisfied that the
contract award was fully consistent with public policy concerns and that there was
no evidence of i`avoritisn-i. corruption. fraud. extravagance, or uncompetitive bidding
practices," Although the facts of Valley" Crest were nearly identical to those of
Ghilotti, this court distinguished Valley Crest in reaching its holding. The court stated
that to the extent that its reasoning differed from that of Valley Crest, it respectfully
disagreed. Copies of Ghilotti Construction and Valley Crest are attached for your
convenience.
New Dynasty Construction had proposed 541/0 of the work to be done by the fisted
subcontractors and under Ghilotti Construction case the City should reject Metro
Builders & Engineer's protest on this ground.
9-5
7) Regarding not naming a subcontractor for Four Fold Metal Doors, this is not a
specialty work and can be self performed within New Dynasty Construction. Byron
Epp, Inc., is only named as the Distributor (2.01 A subsection 1). The requirement is
that the Doors have to be instaiied in accordance with manufacturer's instructions.
Therefore, this second arguments of the Metro Builders &Engineers should also be
rejected.
Per Instruction to Bidders, the City of Newport Beach has the right to waive any minor or
informality in such bids. Given the items above, New Dynasty Construction is the responsible
and responsive lowest bidder on the aforementioned project. We would like to request the City
of Newport Beach to recommend and intent to award the contract for the Fire Station No. 6
Apparatus Bay Replacement to New Dynasty Construction Co.
Must you have any need for further inquiry in this regard, please feel free to contact me at the
aforementioned number at your utmost convenience.
Sincerely,
r
Al Chegini
General Manager
cc: Flie
9-6
3002 Claw Avenue, Sure 218 • Tustin -CA 92780 • Tel. 9.49-502-6444 • Fax: