Loading...
HomeMy WebLinkAboutN2017-0061, kV,4,-o,T City of Newport Beach II'l N2017-0061 - Civic Center Drive, Newport Beach, CA 92660 N 2 0 1 7 0 0 Permit No: 6 , 4 �100 { Permit Counter Phone (949)644-3311 Project No : 1990-2015 Online Inspection Request - www.newportbeachca.gov / Online Services Inspection Requests Phone (949)644-3255 Job Address: 540 REDLANDS AVE NB Thomas:Guide: 888J5 Description : DECORATIVE MAILBOX, DECROATIVE CARRIAGE WALK, ABANDON DRIVEWAY PER STD-165-L, 2 CURB DRAINS. GS DENIED THE PROPOSED OLIVE TREES. EXISTING STREET TREES (2) ARE IN POOR CONDITION, GS REQUIRED 48-INCH BOX REPLACEMENT. Parcel # : 0490-322-9 - �,,. 'f��` ANMED Legal Desc : FIRST ADD TO NEWPORT HEIGHTS LOT 11 BLK 34 AND POROF LOT 10 BILK 34 Owner: MCMILLAN ILA JEAN Contractor : INSTANT LANDSCAPES Phone: 0 Phone: 949-347-0700 Address : 501 REDLANDS AVE Address: 28562 OSO PKWY #D-243 NEWPORT BEACH, CA RSM CA 92688 Contractor State Lic: 842586 Applicant: MCMILLAN ILA JEAN License Expire : 07 31, 2018 Phone: [ Address: Business License: BT30011792 Business Expire : 10 31, 2017 Special Cond.: PRE-CONSTRUCTIONMEETING Workers' Compensation Insurance -- REQUIRED Carrier: WESCOINSURANCE Policy No: WWC3225863 W. C. Expire: 08 15, 2017 Permit Processing Fee : $0.00 Sewer Connection : $0.00 Total Fee $1,147.00 Agreement Fee: $817.00 4TT Box Cover: $0.00 Paid : $1,147.00 Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Balance : $0.00 Inspection Fee : $330.00 Water Meter Connection : $0.00 Receipt No: :} Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment: $0.00 Processed By: Date: _/_/ Other Department : —Date: Utilities Approval : Date: _/_/_ Permit Denied Date: .__......... Traffic Approval: Date: _/_/_ Issued Permit : Date General Services Approval: Date: _/_/ TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed 1 certify that I have a Certificate of consent to so -injure, Ce ' icate of Worker's contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the Compensation Insurance, or a C rtified Copy th %of. permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days ate: Signature: after date of issuance. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and CERTIFICATE OF EXEMPTION (Sec fo Lab ode) employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit, any person so as to become subject to California Worker's Compensation Laws. If, All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. provisions of the Stale Labor Code, I must comply with the provisions of Section Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall 3700 or this permit shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or CONTRACTOR LICENSE EXEMPTION connection to sewer lines a valid State Contractor License Class C-42 is required. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. HOLD HARMLESS STATEMENT The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backflling, or applicant may be required to excavate site. Separate inspections by encroachments. I will be responsible for replacing the improvements if the City the Municipal Operations Department may be required depending on scope of work performed, removes them for maintenance of utilities or other public need. I shall indemnify All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed and hold the City harmless for any liability associated with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole encroachments. existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouls require VCP or PVC SDR35 be used with a Date: Signature: 4TT box over the riser. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All "Manual -: x .-. . (h$ifgOiCflQ $ffOU(f b8-:f8Qkl9 bY. �dd�I1f1§ thy` iiilftt (H'C:�01t signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of _..�.. R8(.jW98t.IflQt�t:fla8^�41t2S6' INITIALS. Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to 15. All above ground facilities shall comply with the Municipal Code, including but not limited protect the general public. Access to fire hydrants must be maintained at all times. to Chapter 13.20. 0. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day 16. Homeowner, contractors, and subcontractors may each be liable for violations of Water weekend, summer between June 15 and September 15, and during the holiday season from December 19 to Quality Laws. Best Management Practices will be enforced. It is against the law to January 1, unless approved by the Public Works Department. 1. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in State acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and prison plus the full cost to clean up an illegal discharge or spill. emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lanes) closure Evidence of a Slurried Backfiil and request a final inspection from the Public Works on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by Department. Monies may be held for six months after final inspection before a refund will the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way be processed. will require a Caltrans Permit. All vehicles shall be lawfully parked. 2. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. without approval from the Municipal Operations Department, Parks and Street Trees Division. 3. Applicant must notify USA at 1.800-227-2600 2 days before starting any underground construction. Applicant c r19 All work in the public must meet the approval of the Public Works Department must notify all affected residents 24 hours in advance of restricted access and any inconveniences. All USA marks or corrections will be required (i.e. removals, exposing connections, etc.). Additional shall he removed prior to Final Public Works Inspection. 4. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City inspection fees may be required. 20 Permit is for standard materials in the public right-of-way only, unless previously approved may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a by Public Works and an Encroachment Agreement has been processed. Temporary Street Closure Permit must be obtained from the Public Works Department. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. COMPLETE THE BELOW INFORMATION )ETAICL`EDjDERIPTI �PRO,O713WZ ri '�Cr✓G a �ZX 12 14, .3 lJ �1/l1rC $ 1 G(o3c old phut o! �o�c� ('� l.✓ (vP.w Cw� ¢- uf' ✓' Phone: 4PPLICANT: j� 1VJtylb 3mail Address: Nailing Address: 'z$T62- oso CttiY lt_ Z� 3 �) `Yr City/ tatelZip: Srvt er�1- �I26 � DWNER: ij e::!� r �-r/ jPhone: E-mail Address: any (if different): Address: �sSb2 Osa OCL,-J C - rzq VtAI ct4 I z1(- State License Number & Class: City Business License Number: VAZTMI Ex ires: Z� \�T300 t\ 2 Expires: l� WORKERS COM ENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: NpcV%&( I tc6 ! I Policy No: k1WG'6q-S'k<:� Expires: Munici aloperations: 949.644.3065 Utilities: 949.644-3011 Urban Forester: 949-644-3083 Conditions of Permit: Utilities: Traffic: Fire: Municipal Operations Other: Engineering Technician: Permit Specialist Date: Permit No. Clusers/pbw/shared/encroach/masters/epwoMsheet.xls Public Works Department 949.644-3311 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee:" Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Street/AlleyNNaik Closure: Traffic Control Plan Check 8-1/2" x 11" 24" x 36" Additional THE FOLLOWING IT I REVENUE DIVIS i (Water Meter: 13/4" Meter 11" Meter 11 1197 MPtfhr Q Inspection Fee: Q $241.00 Public Works Field Inspection $165.00 '2,_- $275.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 $817.00 $192.00 Refundable Deposit: $502.00 Improvements $65.00= Newspaper Rack Inspection $65.00 Sewer Connection Fee $143.00[ 4TT Box & Cover I $.00 $64P 64.00 Ion ----_ i Q $528.00 • Cover = Cost atin nn Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone _ TBD 405-470_ Street Easement/Vacation Fee (+100% of hrly over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBDI 030-2284 E gi i Tech: Total Amount Due: For Finance use only =' Z P,�lRrmit Specialist Receipt No. ) 2, y f./users/pbw/shared/encroach/masters/ep front and back masters/ "'' Rev. 1/5/2017 epfeesheatAs-revised 10/2112016 m 21 M Keely, David From: Pekar, Kevin Sent: Friday, February 03, 2017 7:49 AM To: Keely, David Cc: Sereno, Dan; Bennett, Brenda Subject: RE: 540 Redlands Avenue Attachments: 540 Redlands Ave.pdf; Parkway Tree Designation List.pdf No Olive Trees (fruitless or otherwise) would be permissible. They can install them on their private property. Also, it looks as though one of the existing Camphors will need to be replaced by them (see Google Maps photo). The ROW space provided should only accommodate a maximum of three trees. They can replace the dead tree and add another tree (from our City list - attached). Thanks, Kevin From: Keely, David Sent: Thursday, February 02, 2017 1:04 PM To: Pekar, Kevin <KPekar@newportbeachca.gov> Subject: 540 Redlands Avenue Hi Kevin, Contract came in for an encroachment permit to install items in the public right of way (walkway, decorative mailbox, curb drains, etc). They are also requesting to install 3 fruitless olive trees within the parkway. There are already 2 city trees in the parkway that are to be retained. So a total of 5 trees will be in the parkway along the project frontage. I told them that the 3 additional trees would be unlinkely but that I would ask. Please let me know if the 3 additional olive trees are ok within the right of way. Thanks David Keely, P.E. Senior Civil Engineer City of Newport Beach, Public Works Department Tel: (949) 644-3349 RECORDING REQUESTED BY: North American Title Company Order No.: 1331062 AND WHEN RECORDED MAIL TO; AND MAIL TAX S!'ATEMENT TO: Gary B. Genske 1835 Newport Blvd., suite D-263 Costa Mesa, CA 92627 Recorded in Official Records, Orange County Hugh Nguyen, Clerk -Recorder 11111111 1111111 1111111111111111111111111111 jJJJJ 11111lllll lllil 11 li l t 111 Jill 12.00 *$ R 0 0 0 7 3 6 7 8 2 4$ 201500013578012:22 pm 03117115 66 Sec2 G02 3 07 797.50 797.50 0.00 0.00 6.00 0.00 0.00 0,00 THE UNDERSIGNED GRANTOR(S) DF.CLARF(S) THAT DOCUMENTARY TRANSFER TAX IS $1,595.00 X computed on full value of property conveyed, or computed on full value less liens or encumbrances remaining at the time of sale. unincorporated area: X City of Newport Beach, and FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Ila .lean McMillan, Trustee of The Ila Jean McMillan Trust dated March 22, 2000, and any amendments thereto hereby GRANTS to Gary B. Genske and Carol A. Genske, husband and wife as community property the following described real property in the City of Newport Beach, County of Orange, State of California: Lot Eleven (11) and portion of Lot Ten (10), Block Thirty -Four (34) of First Addition to Newport Heights, in the City of Newport Beach, County of Orange, State of California, as per Miscellaneous Maps, records of said Orange County, California. Also Known as: 540 Redlands Avenue, Newport Beach, CA 92663 APNtl: 049-032-29 GRANT DEED CONTINUED ON NEXT PAGE Mail Tax Statements to: SAME AS ABOVE or Address noted below CONTINUATION OF GRANT DEED N'o.: 1331062 A P N": 0.19-032-29 Pi opertc Address: 540 Redlands Avenue, Newport Beach, CA 92663 Dated liebruary 26, 2015 The Ila Jean McMillan Trust dated March 22, 2000, and any amendments thereto B Ila Jeal c Milian, nlstec A notary public or othei officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached and not the truthfulness accuracy or validity of that document. STATE OF CALIFORNIA 1 COUNTY OF CALIFORNIA f S.S. On 2/26/2015 , before me, L_R._ Walin, a Notary Public personally appeared Ila Jean McMillan ' who proved to me on the basis of satisfactory evidence to be the person(s) whose nalne(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in iris/her/their authorized capacity(ios), and that by his/hec'their signature(s) on the instrument tho person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY Under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature L %/.w"t - Seal ( ) L. Fi. .iN NOTARY PUBLIWAC • tCAL.IfOMA i) COMMISS)ON 6 2n36994 . ORANGE COUNTY Comm. Ex . A--- a3. 201 LEGAL DESCRIPTION Real property in the City of Newport Beach, County of Orange, State of California, described as follows: LOTS 10 AND 11, EXCEPT THEREFROM THE SOUTHWESTERLY RECTANGULAR ONE-HALF OF SAID LOT 10, IN BLOCK 34 OF FIRST ADDITION TO NEWPORT HEIGHTS, AS SHOWN ON A MAP THEREOF RECORDED IN BOOK 4, PAGE 94, OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY, APN: 049-032-29 Velasco, Julio A. From: Sent: To: Subject: Got it, thanks! Thank you, Julio A. Velasco Interwest Consulting Group, Inc. mobile: 714-315-4860 Velasco, Julio A. Wednesday, March 08, 2017 12:43 PM Keely, David Re: 540 Redlands Avenue N2017-0061 On Mar 8, 2017, at 12:21 PM, Keely, David <DKeely@newportbeachca.gov> wrote: Hi Julio [old David Keely, P.E. Senior Civil Engineer City of Newport Beach, Tel: (949) 644-3349 From: Pekar. Kevin Public Works Department Sent: Wednesday, March 08, 2017 12:05 PM To:'valenzuelamh@email.com' <valenzuelamh@gmail.com>; Bennett, Brenda <BBennett@newportbeachca.gov> Cc: Sereno, Dan <dsereno@newportbeachca.aov>; Keely, David <DKeely@newoortbeachca.gov> Subject: RE: 540 Redlands Avenue The replacement trees are acceptable. Brenda, can you remove MOD's tree hold on this property with the comment that "the original trees were removed and replaced with two 48- inch box Camphor Trees." Thanks, Kevin From: Pekar, Kevin Sent: Friday, February 03, 2017 11:18 AM To: Keely, David <DKee ly@newportbeachca.gov> Cc: Sereno, Dan <dsereno@newportbeachca.gov> Subject: RE: 540 Redlands Avenue They would need to be replaced with 48-inch box -sized trees. Thx. From: Keely, David Sent: Friday, February 03, 2017 10:55 AM To: Pekar, Kevin <KPekar@newportbeachca.gov> Subject: RE: 540 Redlands Avenue Hi Kevin, The contractor indicated that both existing trees are dead or dying and they want to replace both with ones from the list. The olive trees will be placed on private property. David Keely, P.E. Senior Civil Engineer City of Newport Beach, Public Works Department Tel: (949) 644-3349 From: Pekar, Kevin Sent: Friday, February 03, 2017 7:49 AM To: Keely, David <DKeely@newportbeachca.gov> 3 Cc: Sereno, Dan <dsereno@newoortbeachca.gov>; Bennett, Brenda <BBennett@newportbeachca.gov> Subject: RE: 540 Redlands Avenue No Olive Trees (fruitless or otherwise) would be permissible. They can install them on their private property. Also, it looks as though one of the existing Camphors will need to be replaced by them (see Google Maps photo). The ROW space provided should only accommodate a maximum of three trees. They can replace the dead tree and add another tree (from our City list - attached). Thanks, Kevin From: Keely, David Sent: Thursday, February 02, 2017 1:04 PM To: Pekar, Kevin <KPekar@newportbeachca.gov> Subject: 540 Redlands Avenue Hi Kevin, Contract came in for an encroachment permit to install items in the public right of way (walkway, decorative mailbox, curb drains, etc). They are also requesting to install 3 fruitless olive trees within the parkway. There are already 2 city trees in the parkway that are to be retained. So a total of 5 trees will be in the parkway along the project frontage. I told them that the 3 additional trees would be unlinkely but that I would ask. Please let me know if the 3 additional olive trees are ok within the right of way. Thanks David Keely, P.E. Senior Civil Engineer City of Newport Beach, Public Works Department Tel: (949) 644-3349 3/1/2017 City of Newport Beach Page 2 of 15 6:34:08AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 03/01/2017 Inspection Type: ENCROACH Inspection Area : PW Site Address : 540 REDLANDS AVE Activity : N2017-0061 SubType: Status : APPROVED OWNER: MCMILLAN ILA JEAN Phone: 0 Description: DECORATIVE MAILBOX, DECROATIVE CARRIAGE WALK, ABANDON DRIVEWAY PER STD-165-L, 2 CURB DRAINS. GS DENIED THE PROPOSED OLIVE TREES. EXISTING STREET TREES (2) ARE IN POOR CONDITION, GS REQUIRED 48-INCH BOX REPLACEMENT. Item: 10200 PRE JOB - PW Requested Time: 3/1/2017 12:00:OOAM Entered By: NBIVR Comments: AM Requestor: NBIVR 9497950648\"�J '0 r\ Assigned to: Inspector: J / Date: 3 it i `r Time: 7:,s—S__ AM M Comments: / ! ( �_T� 1 ��' �� V I E� F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.do C try M;por� t��vrN ��.r� 149 REPT131 Run Id: 4018