Loading...
HomeMy WebLinkAboutX2016-2546 - MiscC ,R2.IFIED AIR BALANCE Co. /754 -z0Ie, 9970 Bell Ranch Drive #101, Santa Fe Springs, CA 90670 Phone: (562)- 1-1200 Fax: (562)-941-1800 AIR DISTRIBUTION Project: /VA oi✓E ZONE ROOM f I Sr/-1G VA v Fnt S77'- Date: Sheet #: Unit #: Job #: Y/g/zoi, iLAI�-6-'- fW.YN ice, ,w/-c f-, r,./-• ,. / -. - - - - - NO. - SIZE I CODE I AK -REQUIRED ACTUAL HTG MIN. FACTOR ,CFM FPM I FPM CFM REQ. ACT. SUPPLY AIR SYSTEM / b e- - ,-T% 7 7 3 y 6'(*. c-P f.,a .7.5 i6 3 /04 ci) . 40 • Zoo /98 - i0,1(4- ci) 1--0 2o 26o .Y %ram 600 _ &al /Bo /9 ! ,,,e0- - cP i'{ o . 9 y 98 2 8' cD 1, 0 9y '7.SP MO' 1 t3 Remarks: STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-01-E Indoor Lighting (Page 1 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 A. General Information Climate Zone: 6 Conditioned Floor Area : 2,321 Unconditioned Floor Area : 0 Building Type: CO Nonresidential ❑ High -Rise Residential 0 Hotel/Motel 0 Schools • Relocatable Public Schools t l Conditioned Spaces 0 Unconditioned Spaces Phase of Construction: 0 New Construction 0 Addition Ei Alteration Method of Compliance: • Complete Building l l Area Category 0 Tailored Project Address: One Hoag Drive B. Lighting Compliance Documents (select yes for each document included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission. YES NO FORM TITLE ✓ NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals. ✓ NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals. ✓ NRCC-LIT-03-E Indoor Lighting Power Allowance I NRCC-LIT-04-E Tailored, Method Worksheets ✓ NRCC-LIT-05-E Line Voltage Track Lighting Worksheets CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-LTI-01-E Indoor Lighting (Page 2 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces 1. Installed Lighting NRCC LTI 01-E, page 4 Watts Installed Lighting NRCC-LTI-01-E, page 4 Watts + 1 528 + 0 2 PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 + 3 Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - 0 Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - 0 4 Adjusted Installed Lighting Power (row 1 plus row 2 minus row 3) = 1 �528 Adjusted Installed Lighting Power (row 1 minus row 3) _ - 0 5. Complies ONLY if Installed 5 Allowed Complies ONLY if Installed <_ Allowed 6 Allowed Lighting Power Conditioned NRCC-LTI-03-E, page 1 1'973 Allowed Lighting Power Unconditioned NRCC-LTI-03-E, page 1 0 D. Declaration of Required Installation Certificates - Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) YES NO Form/Title ✓ NRCI-LTI-01-E - Must be submitted for all buildings 0 Field Inspector ✓ NRCI-LTI-02-E - Must be submitted for a lighting controlsystem, or for an Energy Management Control System (EMCS), to be recognized for compliance. 0 Field Inspector ✓ NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary. overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. 0 Field Inspector ✓ NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance. ❑Field Inspector ✓ NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. ❑ Field Inspector ✓ NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance. 0 Field Inspector E. Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-01-E Indoor Lighting (Page 3 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 YES NO Form/Title NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. 0 Field Inspector I NRCA-LTI-03-A - Must be submitted for automatic daylight controls. 0 Field Inspector I NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. 0 Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE 0 UNCONDITIONED SPACE F. Indoor Lighting Schedule and Field Inspection Energy Checklist ❑ The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. ❑ When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. MI When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines ❑ Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-01-E Indoor Lighting (Page 4 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 G. Installed Portable Luminaires in Offices — Exception to Section 140.6(a) ■ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. • • Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector 1 2 3 4 5 6 7 8 9 10 Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted direct/indirect) Watts per Luminaire Number of Luminaires Installed portable luminaire watts in this office (B x C) Square feet of this office Watts per square foot (D / E) If F <_ 0.3, enter zero; if F > 0.3, (F-0.3) E x G Identify Office area in which these portable luminaires are installed N m . ❑ ■ ❑ ■ ■ i I ■ ❑ ■ . Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages 01-E; Page 1 into NRCC-LTI- CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-01-E Indoor Lighting (Page 5 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: la CONDITIONED SPACE 0 UNCONDITIONED SPACE C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector 1 A B C D E F G H Name or Item Tag Complete Luminaire Description (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballast) Watts per Luminaire How wattage was determined Number Luminaires Total Installed Watts in this area (CxE) Primary Function area in which these luminaires are installed Pass Fail CEC Default from NA8 According to §130.0(c) F1 17.2W LED Downlight Fixture 19.0 ■ 'A 1 19 Office <= 250 sqft p ■ F1/F1 E 17.2W LED Downlight Fixture 19.0 • ! 3 57 Corridor/Restroom/Support ■ 0 F1/F1 E 17.2W LED Downlight Fixture 19.0 ■ ' 12 228 Office <= 250 sqft ■ 0 F3 31W LED 2' x 4' Fixture 34.0 ■ 'A 4 136 Corridor/Restroom/Support ❑ 0 F3 31W LED 2' x 4' Fixture '2' 34.0 0 '2 20 680 Office <= 250 sqft ■ p _ F3/F3E 31W LED x 4' Fixture 34.0 0 '2 12 408 Corridor/Restroom/Support 0 ■ ❑ ■ s • • '• • • 0 0 is INSTALLED WATTS PAGE TOTAL: 1,528 Enter sum total of all pages into NRCC-LTI-01-E; Page 2 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-01-E Indoor Lighting (Page 6 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Leonard Maya Documentation Author Signature: pi v Company: Design West Engineering Signature Date: 3/29/2017 _ Address: 275 W. Hospitality Lane, Suite 100 CEA Certification Identification (if applicable): City/State/Zip: San Bernardino, CA 92408 Phone: 909-890-3700 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Leonard Maya Responsible Designer Signature: Company ` Design West Engineering Date signed: 3/29/2017 Address: 275 W. Hospitality Lane, Suite 100 License: El 9480 City/State/Zip: San Bernardino, CA 92408 Phone: 909-890-3700 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE N RCC-LTI-02-E Indoor Lighting - Lighting Controls Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project. (Page 1 of 3) Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.) YES NO Control Requirements Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9. Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b). One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). ✓ A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b). ✓ All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1. ✓ All luminaires shall be functionally controlled with manually switched ON and OFF. lighting controls in accordance with Section 130.1(a). ✓ General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. The generallighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi -level lighting control requirements in accordance with Section 130.1(b). ✓ All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c). ✓ Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e). ✓ Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF controls, and demand responsive controls. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 (Page 2 of 3) A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: El CONDITIONED SPACES _ ❑ UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST Lighting Control Schedule Standards Complying With 1 (✓ all that apply, or enter 'E' if Exempted) PAF Credit Calculation 2 ✓ if Acceptance Test Required Field Inspector Watts of Controlled Lighting T Control Credit (K x L) A B C D E F GNI J K L M N O Location in Building Type/ Description of Lighting Control (i.e.: occupancy sensor, automatic time switch, dimmer, automatic daylight, etc... ) # of Units CO) 0 N E N 0 o 0- CO) 0 v CO) 0 N n. CO), 0 N ru N 0 rn °1 I-, o en 0-- Pass -n — Office/Workstations Multi Level 10 e ✓ ❑ ■ Office/Workstations Manual Area 9 e e ❑ ■ Storage Multi Level 2 e e ❑ ■ Storage Manual Area 2 ✓ i ❑' ■ ■ ■ . ❑ ■ ❑ ■ Control Credit PAGE TOTAL (Sum of Column M): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): 0 ' Enter Control Credit total into NRCC-LTI-01-E; Page 1. 1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) _ Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING - LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE N RCC-LTI-02-E Indoor Lighting - Lighting Controls Project Name: Hoag HR Optimizing Date Prepared: 3/29/201 7 (Page 3 of 3) DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Leonard Maya Documentation Author Signature: Company: Design West Engineering signature Date: 3/29/2017 Address: 275 W. Hospitality Lane, Suite 1 00 CEA Certification Identification (if applicable): City/State/Zip: San Bernardino, CA 92408 Phone: 909-890-3700 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and, specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Leonard Maya Responsible Designer Signature: Company: Design West Engineering Date Signed: 3/29/2017 Address: 275 W. Hospitality Lane, Suite 100 License: E19480 City/State/Zip: San Bernardino, CA 92408 Phone: 909-890-3700 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 1 of 4) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 ALLOWED LIGHTING POWER A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: a CONDITIONED spaces ❑ UNCONDITIONED spaces A. SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES ❑ If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. ® If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total allowed building watts 1. Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E (below on this page) 2. Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E (below on this page) 3. Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E TOTAL ALLOWED BUILDING WATTS. Enter number. into correct cell on NRCC-LTI-01, Page 2, Row 1 ❑ Check here if building contains both conditioned and unconditioned areas. (a) • (b) 1,973 0 1,973 • B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE A B C D TYPE OF BUILDING (From §140.6 Table 140.6-B) WATTS PER (ft2) X COMPLETE BLDG. AREA = ALLOWED WATTS Total Area: Total Watts. Enter Total Watts into section A, row 1 (Above on this page) C -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (C-2 plus C-3) Watts Total from section C-2 . 1,973 Total from section C-3 . 0 Total Watts. Enter Total Watts into section A, row 2 (Above on this page) . 1,973 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 2 of 4) Project Name' Hoag HR Optimizing Date Prepared: 3/29/2017 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: ❑ CONDITIONED spaces ❑ UNCONDITIONED spaces C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE ❑ Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. I Separately list lighting for each primary function area as defined in §100.1 of the Standards. A AREA CATEGORY (From §140.6 Table 140.6-C) Location in Building Primary Function Area per Table 140.6-C Office/Workstations Office <= 250 sgft Corridors Storage Corridor/Restroom/Support Corridor/Restroom/Support B WATTS PER (ft2) 1.00 0:60 0.60 AREA (ft) 1,452 579 290 Enter sum tot al Area Category allowed watts into section C-1 TOTALS of N RCC-LTI-03-E (th 2,321 is c ompliance form) ALLOWED WATTS 1,452 347 174 1,973 WATTS CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 3 of 4) Protect"ame:Hoag HR Optimizing Date Prepared: 3/29/201 7 A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: El CONDITIONED spaces 0 UNCONDITIONED spaces C-3 AREA CATEGORY METHOD Additional Lighting Wattage Allowance (from Table 140.6-C Footnotes) A Primary Function B Sq Ft or linear ft 1 C 2 Additional Watts Allowed D Wattage Allowance (BxC) E Description(s) and Quantity of Special Luminaire Types in each Primary Function Area F Total Design Watts 3 TOTALS — Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES — S ection C-1 . ALLOWED WATTS Smaller of D or F 0 1. Use linear feet only for additional allowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 . Additional watts are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting; Precision commercial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. 3. Luminaire classification and wattage shall be determined in accordance with §130.0(c) of the Standards. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 4 of 4) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Leonard Maya Documentation Author Signature: Company: Design West Engineering Signature Date:3/29/2017 Address: 275 W. Hospitality Lane, Suite 100 CEA Certification Identification (if applicable): city/state/zip: San Bernardino, CA 92408 Phone:909-890-3700 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Leonard Maya Responsible Designer Signature: Company: Design West Engineering Date Signed: 3/29/2017 Address: 275 W. Hospitality Lane, Suite 100 License: El 9480 city/state/zip: San Bernardino, CA 92408 Phone: 909-890-3700 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 INDOOR LIGHTING Page 1 of 8 California Advanced ,Lighting: Controls Training Program (https://www.calctp.org/) INDOOR LIGHTING NRCC LTI_01 E Hoag HR Optimization Project Orange General Information Climate Zone El Toro Conditioned Floor Area 4 Unconditioned Floor Area 0 Building Type O Nonresidential 0 High -Rise Residential 0 Hotel / Motel ❑ Schools ❑ Relocatable Public Schools ❑ Conditioned Spaces 0 Unconditioned Spaces Phase of Construction Method of Compliance 0 New Construction 0 Addition 0 Alteration ❑ Complete Building 0 Area Category 0 Tailored Lighting Compliance Documents Select the checkbox for each document included. For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Enenergy Commisssion. O NRCC-LTI-01-E Certificate of Compliance. All Pages required on plans for all submittals. NRCC-LTI-02-E https://forms.calctp.org/ComplianceForm/NRCCLTI 01 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 2 of 8 Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals. NRCC-LTI-03-E Indoor Lighting Pwer Allowance ❑ NRCC-LTI-04-E Tailored Method Worksheets ❑ NRCC-LTI-05-E Line Voltage Track Lighting Worksheets Lighting Power Summary of Allowed Lighting Power Conditioned and Unconditioned space lighting must not be combined for Indoor Lighting Power for Conditioned. Spacer, InstalledLighting NRCC-LTI-01-E + 1528.00 PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E + [ 0.00 Minus Lighting Control Credits NRCC-LTI-02-E Adjusted Installed Lighting power Complies ONLY if Installed < Allowed 0.00 1528.00 Allowed Lighting Power Conditioned NRCC-LTI-03-E 1973 Indoor Lighting Power for Unconditioned Spaces Installed Lighting NRCC-LTI-01-E + 0.00 Minus Lighting Control Credits NRCC-LTI-02-E t 0.00 https://forms.calctp.org/ComplianceForm/NRCC LTI 01 E ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 3 of 8 Adjusted Installed Lighting Power 0.00 Complies ONLY if Installed < Allowed Allowed Lighting Power Unconditioned NRCC-LTI-03-E Certificates 0 Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. Retain copies and verify forms are completed and signed. Climate Zone 0 NRCI-LTI-01-E = Must be submitted for all buildings 0 NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance. NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance. NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance. https://forms.calctp.org/ComplianceForm/NRCCLTI 01 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 4 of 8 Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. Retain copies and verify forms are completed and signed. 0 NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. ❑ NRCA-LTI-03-A - Must be submitted for automatic daylight controls. ❑ NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. Checklist A. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines 0 Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed. B. Installed Portable Luminaries in Offices - Exception to Section 140.6 (a) 0 https://forms.calctp.org/ComplianceForm/NRCCLTI 01 E ReadOnly?projectld=d669c6... 3/31/2017 STATE OF CALIFORNIA INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-LTI-01-E Indoor Lighting (Page 4 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 G. Installed Portable Luminaires in Offices — Exception to Section 140.6(a) ❑ This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. ❑ This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office ❑ Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector 1 2 3 4 5 6 7 8 9 10 Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted direct/indirect) Watts per Luminaire Number of Luminaires Installed portable luminaire watts in this office (B x C) Square feet of this office Watts per square foot (D / E) If F 5 0.3, enter zero; if F> 0.3, (F-0.3) E x G Identify Office area in which these portable luminaires are installed tl d — ❑ 0 ❑ ❑ ❑ 0 ❑ 0 ❑ 0 Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages into NRCC-LTI- 01-E; Page 1 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 STATE OF CALIFORNIA , INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-LTI-01-E Indoor Lighting (Page 5 of 6) Project Name: Hoag HR Optimizing Date Prepared: 3/29/2017 A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: 0 CONDITIONED SPACE 0 UNCONDITIONED SPACE C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule installed Watts Location Field Inspector' A B C D E F G H Name or Item Tag Complete Luminaire Description (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballast) Watts per Luminaire How wattage was determined Number Luminaires Total Installed Watts in this area (CxE) Primary Function area in which these luminaires are installed Pass Fail CEC Default I from NA8 According to §130.0(c) F1 17.2W LED Downlight Fixture 19.0 0 121 1 19 Office <= 250 sqft 0 0 F1/F1 E 17.2W LED Downlight Fixture 19.0 0 El 3 57 . Corridor/Restroom/Support 0 ❑ F1/F1 E 17.2W LED Downlight Fixture 19.0 0 21 12 228 Office <= 250 sqft 0 ❑ F3 31W LED 2' x 4' Fixture 34.0 0 El 4 136 Corridor/Restroom/Support ❑ 0 F3 31W LED 2' x 4' Fixture 34.0 0 El 20 680 Office <= 250 sqft 0 0 F3/F3E 31W LED 2' x 4' Fixture 34.0 0 El 12 408 Corridor/Restroom/Support ❑ . 0 ❑ 0 0 0 ❑ 0 0 0 ❑ 0 ❑ 0 INSTALLED WATTS PAGE TOTAL: 1,528 Enter sum total of all pages into NRCC-LTI-01-E; Page 2 CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance May 2015 INDOOR LIGHTING Page 5 of 8 This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of this compliance form. This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance shall not be traded between offices having different lighting systems. s Space Complete Watts , Type . Luminarie (/Comp Descriptio formId} (1.e, 7cd0- LED, 4e47- under 8d6f- cabinte, f95c4aE furniture d8e1- miunted Number Installed per of portable Luminarie Luminarie luminarie (/Complia (/Compiia watts, in formId=9 formId=9 this 7cd0- 7cd0- office 4e47- 4e47- (/Complia 8d6f- 8d6f- formId=9 f95c4a6b' f95c4a6b 1 7cd0- 4d3a- direct/indi d8e1- 80bb- (/Complia 4d3a- f38797 formld=9 80bb- sort=SF 7cd0- f3879708 asc) 4e47- sort=Watt 8d6f- asc) f95c4a6b d8e1- 4d3a- 80bb- f38797081 sort=DesS asc) Square Watts 1 feet of per this ( square office foot (/Complia (/Complia formId=9 formId=9i 7cd0- 7cd0- 1 4e47- 4e47- 8d6f- 8d6f- d8e1- 4e47- f95c4a6b1 f95c4a6bj 4d3a- 8d6f- d8e1- iI d8e1- 80bb- f95c4a6b 4d3a- 4d3a- f3879708 d8e1- 80bb- 80bb- sort=Num 4d3a- Illiii f3879708; f3879708c asc) 80bb- sort=Area sort=Watt f3879708 asc) asc) sort=Insts 00 000 asc) Watts Accountat Indentify ; Field for Watts Office Inspector, calculation (/Complia area in : (/Complia; (/Compliai formId=9; which formId=91 formId=& 7cd0- ; these 7cd0- 7cd0- 4e47- ; portable ' 4e47- 4e47- 8d6f- luminaries; 8d6f- 8d6f- f95c4a6bL are ; f95c4a6b4 f95c4a6b 1 d8e1- installed d8e1- d8e1- 4d3a- (/Complia 4d3a- 4d3a- 80bb- formId=9 % 80bb- 80bb- f3879708 7cd0- If38797081 f3879708 sort=Accq 4e47- sort=IsIn sort=Calc asc) ; 8d6f- asc) 1 asc) f95c4a6b4 d8e1- 4d3a- 80bb- f3879708 sort=Loca, + 1 asc) Sum: o No items to display INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST https://forms.calctp.org/ComplianceForm/NRCC LTI 01 E ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 6 of 8 Space Type (/Comp formId= 7cd0- 4e47- 8d6f- f95c4a d8e1- 4d3a- Name or Complete Item Tag Luminarie (/Complian Description formId=9c3 (/Complian 7cd0- formId=9c: 4e47- 7cd0- 8d6f- 4e47- f95c4a6b4E 8d6f- d8e1- f95c4a6b4 4d3a- d8e1- 80bb- 80bb- 4d3a- f38797 f387970881 80bb- sort=S sort=Name f38797088 asc) asc) sort=Descr asc) CO 000 Watts per Flow Luminarie wattage (/Complian was formId=9c determined 7cd0- 4e47- 8d6f- f95c4a6b4 d8e1- 4d3a- 80bb- f38797088 sort=Watts 'asc) A (CEC Default from NA8), B (According to 130.0 (c ) (/Complian formId=9c 7cd0- 4e47- 8d6f- f95c4a6b4 i1 d8e1- 4d3a- 80bb- f38797088 sort=Select asc) Number Total Primary { Field f of Installed f Function ( Inspector Luminaries Watts in area in i (/Complian4 (/Complian this area { which ' formId=9c1 formId=9c (/Complian these 1 7cd0- i t 7cd0- formId=9c? portable 3 4e47- ' 4e47- 7cd0- luminaries 1 8d6f- 1 8d6f- 4e47- are i f95c4a6b4E f95c4a6b4>_ 8d6f- installed ? d8e1- j d8e1- f95c4a6b41 (/ComplianI 4d3a- 4d3a- d8e1- 1 formId=9c1 80bb- s 80bb- 4d3a- 1 7cd0- f38797088 f38797088( 80bb- ; 4e47- ! sort=IsInsF sort=Numb f38797088 8d6f- asc) asc) sort=Calcul f95c4a6b4q 1 asc) j d8e1- I 4d3a- 1 80bb- f38797088( sort=Locati` r asc) 1 No items to display DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this certificate of Installation document is accurate and complete. Documentation Author NameLeonard Maya Company NameDesign West Engineering Address275 w. Hospitality Lane Suite 100 CitySan Bernardino StateCA Zip Code92408 Phone(909)890-3700 CEA/ATT Certification Identification (if applicable) https://forms.calctp.org/ComplianceForm/NRCC LTI_01 E ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 7 of 8 Author Signature S t.E.- PR ,N7 RESPONSIBLE ACCEPTANCE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. 5. I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person NameDoyle Stone Company NameBriggs Electric, Inc. Address:14381 Franklin Ave. CityTustin StateCA https://forms.calctp.org/ConiplianceForm/NRCC LTI 01 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 8 of 8 Zip Code92780 Phone(714)544-2500 CSLB License297836 Position with Company (Title) service manager Responsible Acceptance Person Signature 0.10 Program/813351972058403) Contact Us (mailto:info@calctp.org) (https://www.facebook.com/pages/The-Cal iforn is-Adva nced-Lig hting-Controls-Training- (https://twitter.com/CALCTP) (https://www.linkedin.com/company/the-california- advanced-lighting-controls-training-program) © 2010 California Advanced Lighting Controls Training Program https://forms.calctp.org/ComplianceForm/NRCC LTI 01 E ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 1 of 6 (https://www.calctp.org/) INDOOR LIGHTING NRCC LTI_02 E Hoag HR Optimization Project Orange General Information The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project. Mandatory Lighting Control Declaration Statments Indiacte if the measure applies by checking yes or no below. Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9. Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b). One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b). A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b). https://forms.calctp.org/ComplianceForm/NRCC LTI 02 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 2 of 6 0 All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1. 0 All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a). 0 General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4. El The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi -level lighting control requirements in accordance with Section 130.1(b). El All installed indoor lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c). Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans. Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e). https://forms.calctp.org/ComplianceForm/NRCC LTI_02 E ReadOnly?projectId=d669c6... 3/31/2017 STATE OF CALIFORNIA INDOOR LIGHTING — LIGHTING CONTROLS CEC-NRCC-LTI.02•E (Revised 05/15) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSIONat NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) P'°I"`" Hoag HR Optimizing Dat` P ep red' 3/29/2017 A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES 0 UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST Lighting Control Schedule Standards Complying With 1 (1 all that apply, or enter 'E' if Exempted) PAF Credit Calculation 2 ✓ if Acceptance Test Required Field Inspector Watts of Controlled Lighting - T Control Credit (K x L) A B C D E F G H I 1 K L M N 0 Location in Building Type/ Description of Lighting Control (i.e.: occupancy sensor, automatic time switch, dimmer, automatic daylight, etc...) # of Units N N a VP o a UTN 0 n W a N 0 .02 §140.6(a)2 N P a. Pass I v Office/Workstations Multi Level 10 r r 0 0 Office/Workstations Manual Area 9 r r 0 0 Storage Multi Level 2 r r 0 0 Storage Manual Area 2 r r ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ Control Credit PAGE TOTAL (Sum of Column M): 0 IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M): 0 Enter Control Credit total into NRCC-LTI-01-E; Page 1. 1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) =Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) _ Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive SecondarySidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out signed, and submitted. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 INDOOR LIGHTING Page 3 of 6 Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF controls, and demand responsive controls. Checklist "^''T^RY AND PRESCRIPTIVE INDOOR LIGHTING ■-r�r�r+A V ;="!DULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST Space Locai Type Type in of (/Comp Build Light Cont (le: form Id' 2050- 4b40- ae5b- 72a8f0 d8e1- 4d3a- 80bb- f38797 sort=S asc) (/Co form 2050 occur 4b40 sens ae5b auto 72a8 time d8e1 switc 4d3a dimn 80bb autos f387J daylil sort asc) etc) (/Cor form] 2050 4b40 ae5b 72a8 d8e1 4d3a 80bb f387 sort= asc) 130.1 130.( of (a) (b) units (/Cor (/Cor (/Cor form] form] form] 2050 2050 4b40 ae5b 72a8 d8e1 4b40 ae5b- 72a8 d8e1 4d3a 2050 4b40 ae5b 72a8 d8e1 4d3a 130.1 (c) (/Cor form 2050 4b40 ae5b 72a8 d8e1 4d3a 4d3a 80bb 80bb 80bb 80bb 80bb 4d3a 80bb f387 f387 f3871 f3879 f3879 80bb f3879 sort— sort— sort= sort— sort f3872 sort-1 asc) asc) asc) asc) asc) sort asc) asc) 130." 130.1 140.E 140.E Watt PAF Conti Chect Field! (d) (e) (a) (d) j of (/Cor' Credi if ; Inspe (/Cor (/Cor 2 (/Cor Conti; form] (/Cor accep (/Corgi form form] (/Cor form], Light 2050 form; test form]. 2050 2050 form] 20501 (/Cor 4b40 2050 requi; 2050! 4b40 4b40 2050 4b4Oi form] ae5b 4b40 (/Cor 4b401 ae5b ae5b 4b40 ae5b 2050 72a8 ae5b form], ae5b 72a8 72a81 ae5b 72a8j 4b40 d8e1 72a8 2050: 72a81 d8e1 d8e1 72a8i d8e11 ae5b 4d3a d8e1 4b4Oi d8e1 4d3a 4d3a d8e1 4d3ai 72a8 80bb 4d3a ae5b; 4d3ai 80bbi d8e1 f3879. 80bb 72a81 80b% f3874 4d3a sort= f3872 d8el. f387c,; sort 80bb asc) sort= 4d3a sort s asc) i f387asc) 80bb; asc) I sort= f387G {l asc) sort-d: I asc) J. Cre PA TO1 i 0 1 https://forms.calctp.org/ComplianceForm/NRCC LTI 02 E ReadOnly?projectId=d669c6... 3/31/2017 'INDOOR LIGHTING Page 4 of 6 �UU CXU0 ( No items to display DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this certificate of Installation document is accurate and complete. Documentation Author NameLeonard Maya Company NameDesign West Engineering Address275 w. Hospitality Lane Suite 100 CitySan Bernardino StateCA Zip Code92408 Phone(909)890-3700 CEA/ATT Certification Identification (if applicable) Author Signature RESPONSIBLE ACCEPTANCE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. https://forms.calctp.org/ComplianceForm/NRCC LTI_02 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 5 of 6 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible- 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements agency. 4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the 5. I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person NameDoyle Stone Company NameBriggs Electric, Inc. Address:14381 Franklin Ave. CityTustin StateCA Zip Code92780 Phone(714)544-2500 CSLB License297836 Position with Company (Title)service manager Responsible Acceptance Person Signature https://forms.calctp.org/ComplianceForm/NRCC LTI_02 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 5 of 6 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. 5. I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person NameDoyle Stone Company NameBriggs Electric, Inc. • Address:14381 Franklin Ave. CityTustin StateCA Zip Code92780 Phone(714)544-2500 CSLB License297836 Position with Company (Title) service manager Responsible Acceptance Person Signature https://forms.calctp.org/ComplianceForm/NRCC LTI 02 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 6 of 6 Contact Us (mailto:info©calctp.org) (https://www.facebook.com/pages/The-California-Advanced-Lig hting-Controls-Training- Program/813351972058403) (https://twitter.com/CALCTP) (https://www.l i n ked i n.com/company/the-ca I iforn ia-advanced-1 ig hti ng-controls-training-program) © 2010 California Advanced Lighting Controls Training Program https://forms.calctp.org/ComplianceForm/NRCC_LTI_02 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 1 of 5 California Advanced Lightinc Controls. Training Program (https://www.calctp.org/) INDOOR LIGHTING POWER ALLOWANCES NRCC_LTI_03_E Hoag HR Optimization Project Orange Lighting Power SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES 0 If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. 0 If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total allowed building watts 1. Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI- 03-E (below on this page) 0.00 2. Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI- 03-E (below on this page) 1973.00 3. Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01, Page 2, Row 1 https://forms.catctp.org/CoinplianceForm/NRCCLTJ 03 E ReadOnty?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 2 of 5 1973.00 El Check here if building contains both conditioned and unconditioned areas. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE Type of Building (from 140.6 Table 140.6-B) Watts per (ft^2) Complete Bldg. Area Allowed Watts Total Area Total Watts. Enter Total Watts into section A, row 1 (Above on this page) C -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (C-2 plus C-3) Watts Total from section C-2 1973.00 Total from section C-3 0.00 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this certificate of Installation document is accurate and complete. Documentation Author NameLeonard Maya Company NameDesign West Engineering Address275 w. Hospitality Lane Suite 100 https://forms.calctp.org/ComplianceForm/NRCC_LTI_03 E ReadOnly?projectId=d669c6... 3/31/2017 INDOOR LIGHTING Page 3 of 5 CitySan Bernardino StateCA ZipCode92408 Phone(909)890-3700 CEA/ATT Certification Identification (if applicable) Author Signature RESPONSIBLE ACCEPTANCE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Installation is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. https://fonns.ealctp.org/ComplianceForm/NRCC_LTI_03 E_ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 4 of 5 4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. 5. I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a -completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person NameDoyle Stone Company Name Briggs Electric, Inc. Address:14381 Franklin Ave. CityTustin StateCA Zip Code92780 Phone(714)544-2500 CSLB License2 Position with Company (Title) service manager Responsible Acceptance Person Signature https://forms.calctp.org/ComplianceForm/NRCC LTI 03 E ReadOnly?projectld=d669c6... 3/31/2017 INDOOR LIGHTING Page 5 of 5 Contact Us (mailto:info@calctp.org) (https://www.facebook.com/pages/The-Ca lifornia-Advanced-Lighting-Controls-Training- Program/813351972058403). (https://twitter.com/CALCTP) (https://www.Iinkedi n. com/company/the-ca liforn ia-advanced-I ig hting-controls-training-program) © 2010 California Advanced Lighting Controls Training Program https://forms.calctp.org/ComplianceFor-m/NRCC LTI 03 E ReadOnly?projectId=d669c6... 3/31/2017 CZIOIHTCATE OF INSTALLATION INRCI-LTI-0I-E Indoor Lighting Project Name: Hoag HR Optimization Project Enforcement Agency: CITY OF NEWPORT BEACH Permit Number: x2016-2546 Project Address: I Hoag Dr General Information City: newport beach 'Zip Code: 92663 Building Type: F Nonresidential r High -Rise Res (Common Area) r Hotel/Motel (Common Area) Phase of Construction: r New Construction r Addition r Alteration r Unconditioned Scope of Responsibility Enter the date of approval by enforcement agency of the Certificate of Compliance that provides the specifications for the energy efficiency measures for the scope of responsibility for this Installation Certificate. Date: 11/28/2016 12:00:00 AM CalifofnlaAdvanbed Lighting £ghtrols Trainfng:Program This is page 1 of 2 r ffiCATE OF INSTALLATION NRCI LTI-01-E 'Indoor Lighting Project Name: Hoag HR Optimization Project Enforcement Agency: CITY OF NEWPORT BEACH IPennitNumber: x2016-2546 Project Address: 1 Hoag Dr City: newport beach DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance document is accurate and complete. Documentation Author Company Name Name Leonard Maya Address City 275 w. Hospitality Lane Suite 100 Zip Code CEA/ATT Certification Identification (if applicable) 92408 Phone Author Signature Zip Code: 92663 Design West Engineering San Bernardino (909)890-3700 Date of Signature: 03/31/2017 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Company Name Person Name Doyle Stone Briggs Electric, Inc. Address: Zip Code CSLB License 14381 Franklin Ave. 92780 297836 City Phone Position with Company (Title) Re onsible Acceptance Person Signature Tustin (714)544-2500 Date of Signature: 03/31/2017 California i4dvancedlighting Coptiols Training,Piiigram This is page 2 of 2