Loading...
HomeMy WebLinkAbout05 - Irvine Avenue Pavement & Median Rehabilitation ProjectQ SEW Pp�T CITY OF z NEWPORT BEACH �ItIFOR P City Council Staff Report TO: FROM: PREPARED BY: PHONE: TITLE: ABSTRACT: June 27, 2017 Agenda Item No. 5 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov Alfred Castanon, Civil Engineer, acastanon@newportbeachca.gov 949-644-3314 Irvine Avenue Pavement & Median Rehabilitation Project — Notice of Completion for Contract No. 5869 (15R16) On June 14, 2016, City Council awarded Contract No. 5869 for construction of the Irvine Avenue Pavement and Median Rehabilitation Project to All American Asphalt of Corona, California. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. (On June 14, 2016, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after the acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description General Fund Gas Tax Neighborhood Enhancement Account Number 01201927-980000-15R16 12101-980000-15R16 53601-980000-15R16 Total: Amount $326,185.65 $803,914.54 $500,000.00 $1,630,100.19 5-1 DISCUSSION: Irvine Avenue Pavement & Median Rehabilitation — Notice of Completion for Contract C-5869 June 27, 2017 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $1,662,662.00 $1,630,100.19 10% or less -2% -2% - Allowed Contract Time + 240 Actual Time -26 Approved Extensions (days) = Under (-) or Over (+) The work necessary to complete this contract consisted of removing existing pavement, reconstructing sidewalk, curb and gutter, curb access ramps, cross -gutters, landscaping and irrigation, and a new asphalt concrete overlay for Irvine Avenue between Santiago Drive and Monte Vista Avenue. Landscape and irrigation work for the existing Irvine Avenue medians (between Santiago Drive and University Drive) included existing turf removal, installation of a new high efficiency sprinkler system, with new control boxes, valves and California friendly drought tolerant plants. The median work also included a new drainage system that consisted of new drop inlets, which tie into the existing storm drain on Irvine Avenue. The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: Actual Cost of Bid Items Constructed: Total Change Orders: $1,662,662.00 $1,485,215.84 $144,884.35 Final Contract Cost: $1,630,100.19 The actual cost of bid items constructed was $177,446.16 less than the original bid amount due to less deep -lift asphalt street repairs being completed than originally planned. After grinding operations, it was discovered that the existing underlying street pavement for areas targeted for deep -lift asphalt repairs was in much better condition than was estimated based on surface reviews, thus reducing the amount of street reconstruction payments from those bid items. There were two change orders that addressed additional work needed for new cross gutters, turf removal, and other work items related to landscaping and irrigation within the existing medians. A summary of the project schedule is as follows: Notice to Proceed for Construction October 31, 2016 Contract Completion Date with Approved Extensions August 23, 2017 Actual Substantial Construction Completion Date April 14, 2017 5-2 Irvine Avenue Pavement & Median Rehabilitation — Notice of Completion for Contract C-5869 June 27, 2017 Page 3 The project was substantially complete as of April 14, 2017. The 90 -day landscape maintenance phase, which requires the contractor to maintain the new California drought tolerant plants, extends the scheduled contract completion date to August 23, 2017. ENVIRONMENTAL REVIEW: At the June 14, 2016 City Council meeting, the project was found to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (for repair, maintenance and minor alteration of existing public facilities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 5-3 ATTACHMENT A FSS/Ty 5P �� IRVINE AVENUE PAVEMENT & MEDIAN REHABILITATION LOCATION MAP UPPER NEWPORT BAY CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-5869 I 15R16 1 6/27/17 5-4