HomeMy WebLinkAbout12 - Sewer Manhole Lining ServicesTO:
FROM:
CITY OF
NEWPORT BEACH
City Council Staff Report
August 8, 2017
Agenda Item No. 12
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
George Murdoch, Municipal Operations Director - 949-644-3011,
gmurdoch@newportbeachca.gov
PREPARED BY: Shelby Morgan, Management Assistant
smorgan@newportbeachca.gov
PHONE: 949-644-3013
TITLE: Approval and Award of Agreement to Zebron Contracting, Inc. for
As -Needed Sewer Manhole Lining Services
ABSTRACT:
The City utilizes manhole lining services to rehabilitate sewer manholes throughout the
City each year. The process includes installing a lining made of polyurethane, which
repairs and extends the life of the manholes. This process is less expensive and less
disruptive to traffic and residents compared to completely replacing the manhole. A
Request for Proposal was issued and it is recommended that the City enter into an
agreement with Zebron Contracting, Inc. for three -years with a not -to -exceed (NTE)
amount of $250,000.
RECOMMENDATION:
a) Determine that the action is exempt from the California Environmental Quality Act
(CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines
because it will not result in a physical change to the environment, directly or indirectly;
and
b) Approve the agreements with Zebron Contracting, Inc. for as -needed sewer manhole
lining services for a three-year term, and authorize the Mayor and City Clerk to execute
the agreements.
FUNDING REQUIREMENTS:
The current adopted budget includes sufficient funding for this agreement. It will be
expensed to the Sewer Manhole Lining budget 7119061-851050, Maintenance and
Repair NOC budget 7119061-851037 in the Municipal Operations Department.
12-1
Approve Agreement for As -Needed Sewer
Manhole Lining Services with Zebron Contracting, Inc.
August 8, 2017
Page 2
DISCUSSION:
The City's wastewater collection system has approximately 197 miles of mainline pipes,
4.7 miles of force mains, 4,922 manholes and cleanouts, and 25,525 sewer laterals (the
pipe from the property to the city sewer main).
Due to the harsh environment, concrete sewer manholes deteriorate over time. Rather
than replace the entire manhole, which would involve street closures, sewer diversions,
and customer outages, the city rehabilitates or lines the manhole. This process includes
cleaning and installing a polyurethane lining on the inside of the manhole. This blocks the
harsh environment from further damaging the concrete structure and adds many years of
life to the manhole. The process is quicker, more cost effective than replacement and less
disruptive to the community.
The City has been using this process for many years successfully. The current agreement
with Zebron Contracting is set to expire on July 31, 2017. A RFP was published on May
16, 2017 and two proposals were received on June 1, 2017. A panel evaluated the
proposals based on qualifications, experience, understanding of the services and
operational methodology. The Finance Department evaluated the responses on cost. The
results are as follows:
Zebron Contracting scored the highest in both the technical and cost categories. Zebron
Contracting has been the City's contractor for this service on its last two contract cycles,
dating back to 2012. The proposed agreement will be for three -years with a total NTE
amount of $250,000. Staff intends to complete approximately $75,000 annually in planned
relining projects. The remainder of the NTE is reserved for unexpected emergency
repairs.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
12-2
SANCON
ENGINEERING
ZEBRON
CONTRACTING, INC.
TECHNICAL SCORE (OUT OF 60):
46.67
54.00
COST RATIO SCORE (OUT OF 40):
37.62
40.00
AGGREGATE SCORE (OUT OF 100):
84.28
94.00
Zebron Contracting scored the highest in both the technical and cost categories. Zebron
Contracting has been the City's contractor for this service on its last two contract cycles,
dating back to 2012. The proposed agreement will be for three -years with a total NTE
amount of $250,000. Staff intends to complete approximately $75,000 annually in planned
relining projects. The remainder of the NTE is reserved for unexpected emergency
repairs.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
12-2
Approve Agreement for As -Needed Sewer
Manhole Lining Services with Zebron Contracting, Inc.
August 8, 2017
Page 3
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — On -Call Maintenance and Repair Services Agreement with Zebron
Contracting, Inc.
12-3
ATTACHMENT A
ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH ZEBRON CONTRACTING, INC. FOR
AS -NEEDED SEWER MANHOLE LINING SERVICES
THIS ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
("Agreement") is made and entered into as of this 8th day of August, 2017 ("Effective
Date"), by and between the CITY OF NEWPORT BEACH, a California municipal
corporation and charter city ("City"), and ZEBRON CONTRACTING, INC., a California
corporation ("Contractor'), whose address is Post Office Box 2874, Newport Beach,
California 92659, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform on-call maintenance and/or repair
services for City ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the maintenance and/or repair services described in this
Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed and
evaluated the specifications set forth by City for the Project, is familiar with all
conditions relevant to the performance of services, and has committed to perform
all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
The term of this Agreement shall commence on the Effective Date, and shall
terminate on August 1, 2020, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall perform the on-call services described in the Scope of
Services attached hereto as Exhibit A and incorporated herein by reference ("Services"
or "Work"). Upon written request from the Project Administrator as defined herein,
Contractor shall provide a letter proposal for Services requested by the City (hereinafter
referred to as the "Letter Proposal"). The Letter Proposal shall include the following:
2.1.1 A detailed description of the Services to be provided;
2.1.2 The position of each person to be assigned to perform the Services,
and the name of the individuals to be assigned, if available;
12-4
and
2.1.3 The estimated number of hours and cost to complete the Services;
2.1.4 The time needed to finish the specific project.
2.2 No Services shall be provided until the Project Administrator has provided
written acceptance of the Letter Proposal. Once authorized to proceed, Contractor shall
diligently perform the duties in the approved Letter Proposal.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this Agreement
and Contractor shall perform the Services in accordance with the schedule included in
Exhibit A and the Letter Proposal. In the absence of a specific schedule, the Services
shall be performed to completion in a diligent and timely manner. The failure by
Contractor to strictly adhere to the schedule set forth in Exhibit A and the Letter Proposal,
if any, or perform the Services in a diligent and timely manner may result in termination
of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall respond
in the most expedient and appropriate manner under the circumstances, by fax, hand -
delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section, the Letter Proposal, and
the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by
reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items, shall not exceed Two Hundred Fifty Thousand Dollars and 001100
($250,000.00), without prior written amendment to the Agreement.
4.2 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
Zebron Contracting, Inc. Page 2
12-5
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
4.3 City shall reimburse Contractor only for those costs or expenses specifically
identified in Exhibit B to this Agreement and the Letter Proposal, or specifically approved
in writing in advance by City.
4.4 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the Project,
but which is not included within the Scope of Services and which the parties did not
reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B
and the Letter Proposal.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Greg Hex to be its Project
Manager. Contractor shall not remove or reassign the Project Manager or any personnel
listed in Exhibit A or assign any new or replacement personnel to the Project without the
prior written consent of City. City's approval shall not be unreasonably withheld with
respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Municipal Operations Department.
City's Wastewater Supervisor or designee shall be the Project Administrator and shall
have the authority to act for City under this Agreement. The Project Administrator shall
represent City in all matters pertaining to the Services to be rendered pursuant to this
Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all existing
relevant information on file at City. City will provide all such materials in a timely manner
so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
Zebron Contracting, Inc. Page 3
12-6
in Exhibit A shall not be installed or utilized unless approved in advance and in writing by
the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a manner
commensurate with community professional standards and with the ordinary degree of
skill and care that would be used by other reasonably competent practitioners of the same
discipline under similar circumstances. All Services shall be performed by qualified and
experienced personnel who are not employed by City. By delivery of completed Work,
Contractor certifies that the Work conforms to the requirements of this Agreement, all
applicable federal, state and local laws and legally recognized professional standards.
8.3 Contractor represents and warrants to City that it has, shall obtain and shall
keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by City,
contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractor's performance of the Services required hereunder; or for damage to
property from any cause arising from the performance of the Project by Contractor, or its
subcontractors, or its workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project, or the Work
of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the "Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorneys' fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate
(directly or indirectly) to any breach of the terms and conditions of this Agreement, any
Work performed or Services provided under this Agreement including, without limitation,
Zebron Contracting, Inc. Page 4
12-7
defects in workmanship or materials or Contractor's presence or activities conducted on
the Project (including the negligent and/or willful acts, errors and/or omissions of
Contractor, its principals, officers, agents, employees, vendors, suppliers, consultants,
subcontractors, anyone employed directly or indirectly by any of them or for whose acts
they may be liable or any or all of them).
9.4 Notwithstanding the foregoing, nothing herein shall be construed to require
Contractor to indemnify the Indemnified Parties from any Claim arising from the sole
negligence orwillful misconduct of the Indemnified Parties. Nothing in this indemnity shall
be construed as authorizing any award of attorneys' fees in any action on or to enforce
the terms of this Agreement. This indemnity shall apply to all claims and liability
regardless of whether any insurance policies are applicable. The policy limits do not act
as a limitation upon the amount of indemnification to be provided by Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original condition
and former usefulness as soon as possible, and to protect public and private property.
Contractor shall be liable for any private or public property damaged during the
performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of conducting
the Work are under the control of Contractor, except to the extent they are limited by
statute, rule or regulation and the expressed terms of this Agreement. No civil service
status or other right of employment shall accrue to Contractor or its employees. Nothing
in this Agreement shall be deemed to constitute approval for Contractor or any of
Contractor's employees or agents, to be the agents or employees of City. Contractor
shall have the responsibility for and control over the means of performing the Work,
provided that Contractor is in compliance with the terms of this Agreement. Anything in
this Agreement that may appear to give City the right to direct Contractor as to the details
of the performance of the Work or to exercise a measure of control over Contractor shall
mean only that Contractor shall follow the desires of City with respect to the results of the
Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
Zebron Contracting, Inc. Page 5
12-8
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in order
to ensure the Project proceeds in a manner consistent with City goals and policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the term
of this Agreement or for other periods as specified in this Agreement, policies of insurance
of the type, amounts, terms and conditions described in the Insurance Requirements
attached hereto as Exhibit C, and incorporated herein by reference.
15. BONDING
15.1 For any Letter Proposal accepted by City of over Twenty Five Thousand
Dollars and 00/100 ($25,000.00), Contractor shall obtain, provide and maintain at its own
expense during the term of this Agreement: (1) a Labor and Materials Payment Bond in
the amount of one hundred percent (100%) of the total amount to be paid Contractor as
set forth in any Letter Proposal accepted by City of over Twenty Five Thousand Dollars
and 00/100 ($25,000.00), and in the form attached hereto as Exhibit D which is
incorporated herein by this reference; and (2) a Faithful Performance Bond in the amount
of one hundred percent (100%) of the total amount to be paid Contractor as set forth in
any Letter Proposal accepted by City of over Twenty Five Thousand Dollars and 00/100
($25,000.00), and in the form attached hereto as Exhibit E which is incorporated herein
by this reference.
15.2 The Labor and Materials Payment Bond and Faithful Performance Bond
shall be issued by an insurance organization or surety (1) currently authorized by the
Insurance Commissioner to transact business of insurance in the State of California, (2)
listed as an acceptable surety in the latest revision of the Federal Register Circular 570,
and (3) assigned a Policyholders' Rating A (or higher) and Financial Size Category Class
VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -
Casualty.
15.3 Contractor shall deliver, concurrently with City's approval of any Letter
Proposal over Twenty Five Thousand Dollars and 00/100 ($25,000.00), the Labor and
Materials Payment Bond and Faithful Performance Bond, a certified copy of the
"Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner,
which authorizes the Insurer or Surety to transact surety insurance in the State of
California.
Zebron Contracting, Inc. Page 6
12-9
16. PREVAILING WAGES
Pursuant to the applicable provisions of the Labor Code of the State of California,
not less than the general prevailing rate of per diem wages including legal holidays and
overtime Work for each craft or type of workman needed to execute the Work
contemplated under the Agreement shall be paid to all workmen employed on the Work
to be done according to the Agreement by the Contractor and any subcontractor. In
accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and requesting
one from the Department of Industrial Relations. The Contractor is required to obtain the
wage determinations from the Department of Industrial Relations and post at the job site
the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any
subcontractor under him/her to comply with all State of California labor laws, rules and
regulations and the parties agree that the City shall not be liable for any violation thereof.
17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall be
construed as an assignment: The sale, assignment, transfer or other disposition of any
of the issued and outstanding capital stock of Contractor, or of the interest of any general
partner or joint venturer or syndicate member or cotenant if Contractor is a partnership or
joint -venture or syndicate or cotenancy, which shall result in changing the control of
Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five
percent (25%) or more of the assets of the corporation, partnership or joint -venture.
18. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A and the Letter Proposal. Contractor shall be fully responsible to
City for all acts and omissions of any subcontractor. Nothing in this Agreement shall
create any contractual relationship between City and any subcontractor nor shall it create
any obligation on the part of City to pay or to see to the payment of any monies due to
any such subcontractor other than as otherwise required by law. City is an intended
beneficiary of any Work performed by the subcontractor for purposes of establishing a
duty of care between the subcontractor and City. Except as specifically authorized herein,
the Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
19. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole right
Zebron Contracting, Inc. Page 7
12-10
to use such materials in its discretion without further compensation to Contractor or any
other party. Contractor shall, at Contractor's expense, provide such Documents to City
upon prior written request.
20. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept confidential
unless City expressly authorizes in writing the release of information.
21. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3) years,
or for any longer period required by law, from the date of final payment to Contractor
under this Agreement. All such records and invoices shall be clearly identifiable.
Contractor shall allow a representative of City to examine, audit and make transcripts or
copies of such records and invoices during regular business hours. Contractor shall allow
inspection of all Work, data, Documents, proceedings and activities related to the
Agreement for a period of three (3) years from the date of final payment to Contractor
under this Agreement.
22. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of
the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
23. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
24. CONFLICTS OF INTEREST
24.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to
disclose any financial interest that may foreseeably be materially affected by the Work
performed under this Agreement, and (2) prohibits such persons from making, or
participating in making, decisions that will foreseeably financially affect such interest.
24.2 If subject to the Act, Contractor shall conform to all requirements of the Act.
Failure to do so constitutes a material breach and is grounds for immediate termination
Zebron Contracting, Inc. Page 8
12-11
of this Agreement by City. Contractor shall indemnify and hold harmless City for any and
all claims for damages resulting from Contractor's violation of this Section.
25. NOTICES
25.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
25.2 All notices, demands, requests or approvals from Contractor to City shall be
addressed to City at:
Attn: Wastewater Supervisor
Municipal Operations Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
25.3 All notices, demands, requests or approvals from City to Contractor shall be
addressed to Contractor at:
Attn: Greg Hex
Zebron Contracting, Inc.
P.O. Box 2874
Newport Beach, CA 92659
26. CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in writing,
all claims for compensation under or arising out of this Agreement. Contractor's
acceptance of the final payment shall constitute a waiver of all claims for compensation
under or arising out of this Agreement except those previously made in writing and
identified by Contractor in writing as unsettled at the time of its final request for payment.
Contractor and City expressly agree that in addition to any claims filing requirements set
forth in the Agreement, Contractor shall be required to file any claim Contractor may have
against City in strict conformance with the Government Claims Act (Government Code
sections 900 et seq.).
27. TERMINATION
27.1 In the event that either party fails or refuses to perform any of the provisions
of this Agreement at the time and in the manner required, that party shall be deemed in
default in the performance of this Agreement. If such default is not cured within a period
of two (2) calendar days, or if more than two (2) calendar days are reasonably required
to cure the default and the defaulting party fails to give adequate assurance of due
performance within two (2) calendar days after receipt of written notice of default,
Zebron Contracting, Inc. Page 9
12-12
specifying the nature of such default and the steps necessary to cure such default, and
thereafter diligently take steps to cure the default, the non -defaulting party may terminate
the Agreement forthwith by giving to the defaulting party written notice thereof.
27.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for which
Contractor has not been previously paid. On the effective date of termination, Contractor
shall deliver to City all reports, Documents and other information developed or
accumulated in the performance of this Agreement, whether in draft or final form.
28. LABOR
28.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor Standards
Act ("FLSA") (29 USCA § 201, et seq.).
28.2 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
28.3 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
28.4 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any applicable
federal, state and local labor laws or law, rules, and/or regulations. This obligation shall
survive the expiration and/or termination of the Agreement.
29. STANDARD PROVISIONS
29.1 Recitals. City and Contractor acknowledge that the above Recitals are true
and correct and are hereby incorporated by reference.
29.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be subject
to approval of the Project Administrator and City.
29.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent breach
of the same or any other term, covenant or condition contained herein, whether of the
same or a different character.
Zebron Contracting, Inc. Page 10
12-13
29.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged herein.
No verbal agreement or implied covenant shall be held to vary the provisions herein.
29.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
29.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
29.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
29.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
29.9 Controlling Law and Venue. The laws of the State of California shall govern
this Agreement and all matters relating to it and any action brought relating to this
Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
29.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religious creed, color, national origin,
ancestry, physical handicap, medical condition, marital status, sex, sexual orientation,
age or any other impermissible basis under law.
29.11 No Attorneys' Fees. In the event of any dispute or legal action arising under
this Agreement, the prevailing party shall not be entitled to attorneys' fees.
29.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
Zebron Contracting, Inc. Page 11
12-14
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
on the dates written below.
APPROVED AS TO FORM:
CITY ATTORN � 'S OFFICE
Date;
By:
Aaron C. Harp M3tilti1-
City Attorney
ATTEST:
Date:
Leilani I. Brown
City Clerk
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
Bv:
Kevin Muldoon
Mayor
CONTRACTOR: Zebron Contracting,
Inc., a California corporation
Date:
Bv:
Roger Decker
President 1 Secretary
[END OF SIGNATURES]
Attachments: Exhibit A
— Scope of Services
Exhibit B — Schedule of Billing Rates
Exhibit C
— Insurance Requirements
Exhibit D —
Labor and Materials Payment Bond
Exhibit E —
Faithful Performance Bond
Zebron Contracting, Inc. Page 12
12-15
EXHIBIT
SCOPE OF SERVICES
• DESCRIPTION OF PROJECT
o The existing wastewater collection system is made up of a network of forcemain
and gravity sewers. This system consists of approximately 197 miles of mainline
gravity pipes, 4.7 miles of forcemains with 4,922 manholes and cleanouts, and
25,525 sewer laterals with an approximate length of 121 miles in the public rights-
of-way. This system requires proper maintenance, and as such, the City has a
need for as -needed manhole sewer lining services to continue the yearly process
of rehabilitating the City's manholes with polyurethane lining.
• QUALITY OF WORK AND MATERIALS
o All material and equipment furnished by the Contractor shall be high grade, and
free from defects and imperfections, unless otherwise hereinafter specified.
Workmanship shall be in accord with the best standard practices. Both materials
and workmanship shall be subject to the approval of the Project Administrator.
LEVEL OF MAINTENANCE
o All work shall be performed in a manner commensurate with community
professional standards and with the ordinary degree of skill and care that would
be used by other reasonably competent practitioners of the same discipline
under similar circumstances. Standards and frequencies may be modified from
time to time as deemed necessary by the City for the proper maintenance of the
sites.
o If, in the judgment of the City, the level of maintenance is less than that specified
herein, the City shall, at its option, in addition to or in lieu of other remedies
provided herein, withhold appropriate payment from the Contractor until services
are rendered in accordance with specifications set forth within this document and
providing no other arrangements have been made between the Contractor and
the City. Failure to notify of a change and/or failure to perform an item or work
on a scheduled day may, at the City's sole discretion, result in deduction of
payment for that date, week, or month. Payment will be retained for work not
performed until such time as the work is performed to City standard.
o The Contractor is required to correct deficiencies within the time specified by the
City. If noted deficient work has not been completed, payment for subject
deficiency shall be withheld for current billing period and shall continue to be
withheld until deficiency is corrected, without right to retroactive payments.
Zebron Contracting, Inc. Page A-1
12-16
SAFETY REQUIREMENTS
o All work performed under this contract shall be performed in such a manner
as to provide maximum safety to the public and where applicable comply
with all safety standards required by CAL -OSHA. The City reserves the right
to issue restraint, or cease and desist orders to the Contract when unsafe
or harmful acts are observed or reported relative to the performance under
this contract. All contractor employees shall have access to a W.A.T.C.H.
(Work Area Traffic Control Handbook) at all times.
o The Contractor shall maintain all work sites free of hazards to persons
and/or property resulting from his/her operations. Any hazardous condition
noted by the Contractor, which is not a result of his/her operations, shall be
immediately reported to the City.
o Warning signs, lights, and devices shall be installed and displayed in
conformity with "The California Manual on Uniform Traffic Devices" for use
in performance of work upon highways issued by the State of California,
Department of Transportation.
• TECHNICAL MAINTENANCE
The section below details the services requested by the City, at a minimum.
Contractor shall be the manufacturer and installer of the lining system. It is the
responsibility of the Contractor to ensure that their proposed service solution
encompasses at least the following services:
o As -needed application of 125 mil polyurethane lining to all interior concrete
surfaces of sewer manholes and all related processes needed to complete the
work, as well as maintenance of existing sewer manholes, which have been
previously lined.
o Contractor shall provide all labor, materials, and equipment necessary for the
scope of work, including, but not limited to: preparation of areas to be lined,
application of primer and lining, prevention of water infiltration, rehabilitation of
channels, troughs and benches, any and all safety procedures, such as
containment, traffic control, etc.
o The lining shall be applied by high pressure, airless equipment maintained by the
lining manufacturer. The equipment shall be of good working order. The lining
application shall follow all proper manufacturer application guidelines.
o At the option of the Project Administrator, the Contractor shall demonstrate the
material on a sample area, which is representative of a job site application. When
approved, the sample area shall serve as a standard for all further work.
o All concrete surfaces to be lined shall be abrasive grit blasted to remove all laitance
and other deleterious material to obtain a clean substrate and a suitable bonding
Zebron Contracting, Inc. Page A-2
12-17
surface for the polyurethane liner. Any and all debris produced shall be removed
from the manhole prior to coating, and the concrete surfaces shall be clean and
dry prior to primer application.
o Where gunite or mortar placement is required, gunitelmortar shall be applied in
continuous lifts with thicknesses as specified in order to restore dimensions as
specified by Project Administrator. Proper containment devices shall be used to
prevent rebound (non -adhering excess gunitelmortar) from entering the sewer
system. Sewer flows shall be maintained unless otherwise specified. Immediately
following placement, the containment device shall be removed and the manhole
cover reinstalled to provide a moist curing environment. Where moist conditions
are not present, Contractor shall provide a water cure to the gunitelmortar.
o Primer used shall be a 100% solids, moisture tolerant, low temperature cure, epoxy
primer, applied at 1-3 mil thickness in one continuous coat.
o Polyurethane lining shall be an elastomeric, 3-1 ratio, high -build type capable of
application thickness as specified, without any runs or sags. Lining shall pass
ASTM D522 - 93a (2008) for flexibility using a cylinder mandrel of 0.5 inch (12.7
millimeters). Flash point of fluid mixture shall be 450 degrees Fahrenheit. The
complete coating shall be properly applied and cured. Lining shall meet the restive
specifications specified by the Project Administrator, be impermeable to sewer
gases and liquids and be non-conductive to bacterial or fungal growth. The lining
shall be capable of repair at any time during its life, be uniformly white or cream,
in color, and free of pinholes, surface imperfections, and blisters. All areas in
question shall be removed, reworked, and patched. Cured polyurethane lining shall
be spark tested for pinholes with a spark tester set at 15,000 volts minimum.
Pinholes, uncured lining, blisters, and other surface imperfections shall be repaired
per manufacturer specifications. Any warranties provided by the
manufacturer/installer for labor and/or materials shall be disclosed to the Project
Administrator.
Zebron Contracting, Inc. Page A-3
12-18
EXHIBIT B
SCHEDULE OF BILLING RATES
Zebron Contracting, Inc. Page B-1
12-19
COST FILE
Labor Costs shall include all essentials necessary
for the performance of the duties specified in the scope of work including, but
not limited to: Prevailing Wage, insurance, related equipment, traffic control and safety, etc.
A. Contractor is advised that the unit prices will enter into the determination of the contract
award. Unit prices
listed below refer to all items installed and include all costs connected with such items,
including but not limited to, materials, labor, overhead, and profit for the contractor.
B. The unit price quoted by the Contractor shall be those unit prices that will be charged or
credited for labor and materials to be provided regardless of the total number units and/or
amount of labor required for added or deleted items of work.
Service
As -Needed Sewer
Manhole lining Services
Cost
All inclusive? (Please Circle one)
$ /Per Vertical Foot \
Yes or No
Service
Cost (If included in above price,
denote with 'Included)
Details, Exceptions, labor
charges, etc.
Mobilization
$ /Per��
Infiltration/Chemical�C�
Grouting
/'Cal
-
I
Concrete Rehabilitation
L
$ /Hr.
Traffic Control
R I F Nu i 7-7A
L iia., rII,
12-20
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury by
disease in accordance with the laws of the State of California, Section 3700
of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance, a
Waiver of Subrogation endorsement in favor of City, its City Council,
boards and commissions, officers, agents, volunteers and employees.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The policy
shall cover liability arising from premises, operations, products -completed
operations, personal and advertising injury, and liability assumed under an
insured contract (including the tort liability of another assumed in a business
contract).
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
Zebron Contracting, Inc. Page C-1
12-21
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation against
City, its City Council, boards and commissions, officers, agents, volunteers
and employees or shall specifically allow Contractor or others providing
insurance evidence in compliance with these requirements to waive their
right of recovery prior to a loss. Contractor hereby waives its own right of
recovery against City, and shall require similar written express waivers from
each of its subcontractors.
B. Additional Insured Status. All liability policies including general liability,
products and completed operations, excess liability, pollution liability, and
automobile liability, if required, shall provide or be endorsed to provide that
City, its City Council, boards and commissions, officers, agents, volunteers
and employees shall be included as insureds under such policies.
C. Primary and Non Contributory. All liability coverage shall apply on a primary
basis and shall not require contribution from any insurance or self-insurance
maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance certificates
and endorsement must be approved by City's Risk Manager prior to
commencement of performance. Current certification of insurance shall be
kept on file with City at all times during the term of this Agreement. City
reserves the right to require complete, certified copies of all required
insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
Zebron Contracting, Inc. Page C-2
12-22
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters into
contracts with on behalf of City will be submitted to City for review. Failure
of City to request copies of such agreements will not impose any liability on
City, or its employees. Contractor shall require and verify that all
subcontractors maintain insurance meeting all the requirements stated
herein, and Contractor shall ensure that City is an additional insured on
insurance required from subcontractors. For CGL coverage,
subcontractors shall provide coverage with a format at least as broad as CG
20 38 04 13.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage,
limits or other requirements, or a waiver of any coverage normally provided
by any insurance. Specific reference to a given coverage feature is for
purposes of clarification only as it pertains to a given issue and is not
intended by any party or insured to be all inclusive, or to the exclusion of
other coverage, or a waiver of any type. If the Contractor maintains higher
limits than the minimums shown above, the City requires and shall be
entitled to coverage for higher limits maintained by the Contractor. Any
available insurance proceeds in excess of the specified minimum limits of
insurance and coverage shall be available to the City.
F. Self-insured Retentions. Any self-insured retentions must be declared to
and approved by City. City reserves the right to require that self-insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance. If Contractor or any subcontractor fails
to provide and maintain insurance as required herein, then City shall have
the right but not the obligation, to purchase such insurance, to terminate this
Agreement, or to suspend Contractor's right to proceed until proper
evidence of insurance is provided. Any amounts paid by City shall, at City's
sole option, be deducted from amounts payable to Contractor or reimbursed
by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely notice
of claims made or suits instituted that arise out of or result from Contractor's
Zebron Contracting, Inc. Page C-3
12-23
performance under this Contract, and that involve or may involve coverage
under any of the required liability policies. City assumes no obligation or
liability by such notice, but has the right (but not the duty) to monitor the
handling of any such claim or claims if they are likely to involve City.
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of the
Work.
Zebron Contracting, Inc. Page C-4
12-24
EXHIBIT D
CITY OF NEWPORT BEACH
BOND NO.
LABOR AND MATERIALS PAYMENT BOND
WHEREAS, the City of Newport Beach, State of California, has awarded to Zebron
Contracting, Inc. hereinafter designated as the "Principal," a contract for maintenance
and/or repair services, in the City of Newport Beach, in strict conformity with the Contract
on file with the office of the City Clerk of the City of Newport Beach, which is incorporated
herein by this reference.
WHEREAS, Principal has executed or is about to execute the Contract and the
terms thereof require the furnishing of a bond, providing that if Principal or any of
Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies
used in, upon, for, or about the performance of the Work agreed to be done, or for any
work or labor done thereon of any kind, the Surety on this bond will pay the same to the
extent hereinafter set forth.
NOW, THEREFORE, We the undersigned Principal, and,
duly authorized to transact business under the laws of the State of California, as Surety,
(referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach,
in the sum of Dollars and _/100 ($ ), lawful
money of the United States of America, said sum being equal to 100% of the estimated
amount payable by the City of Newport Beach under the terms of the Contract; for which
payment well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors, or assigns, jointly and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the
Principal's subcontractors, fail to pay for any materials, provisions, or other supplies,
implements or machinery used in, upon, for, or about the performance of the Work
contracted to be done, or for any other work or labor thereon of any kind, or for amounts
due under the Unemployment Insurance Code with respect to such work or labor, or for
any amounts required to be deducted, withheld and paid over to the Employment
Development Department from the wages of employees of the Principal and
subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with
respect to such work and labor, then the Surety will pay for the same, in an amount not
exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the
obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required
by the provisions of Section 9554 of the Civil Code of the State of California.
The Bond shall inure to the benefit of any and all persons, companies, and
corporations entitled to file claims under Section 9100 of the California Civil Code so as
to give a right of action to them or their assigns in any suit brought upon this Bond, as
required by and in accordance with the provisions of Sections 9500 et seq. of the Civil
Code of the State of California.
Zebron Contracting, Inc. Page D-1
12-25
And Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alterations or additions to the terms of the Contract or to the Work to
be performed thereunder shall in any wise affect its obligations on this Bond, and it does
hereby waive notice of any such change, extension of time, alterations or additions to the
terms of the Contract or to the Work or to the specifications.
In the event that any principal above named executed this Bond as an individual,
it is agreed that the death of any such principal shall not exonerate the Surety from its
obligations under this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the above
named Principal and Surety, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
0
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE
ATTACHED
Zebron Contracting, Inc. Page D-2
12-26
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of }ss.
On , 20 before me,
Notary Public, personally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of }ss.
On , 20 before me, ,
Notary Public, personally appeared ,
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
Zebron Contracting, Inc. Page D-3
12-27
EXHIBIT E
CITY OF NEWPORT BEACH
BOND NO.
FAITHFUL PERFORMANCE BOND
The premium charges on this Bond is $ , being at the
rate of $ thousand of the Contract price.
WHEREAS, the City of Newport Beach, State of California, has awarded to Zebron
Contracting, Inc. hereinafter designated as the "Principal," a contract for maintenance
and/or repair services in the City of Newport Beach, in strict conformity with the Contract
on file with the office of the City Clerk of the City of Newport Beach, which is incorporated
herein by this reference.
WHEREAS, Principal has executed or is about to execute the Contract and the
terms thereof require the furnishing of a Bond for the faithful performance of the Contract.
NOW, THEREFORE, we, the Principal, and
, duly authorized to
transact business under the laws of the State of California as Surety (hereinafter
"Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of
Dollars and _/100 ($ ) lawful money of
the United States of America, said sum being equal to 100% of the estimated amount of
the Contract, to be paid to the City of Newport Beach, its successors, and assigns; for
which payment well and truly to be made, we bind ourselves, our heirs, executors and
administrators, successors, or assigns, jointly and severally, firmly by these present.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the
Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and
well and truly keep and perform any or all the Work, covenants, conditions, and
agreements in the Contract Documents and any alteration thereof made as therein
provided on its part, to be kept and performed at the time and in the manner therein
specified, and in all respects according to its true intent and meaning, or fails to indemnify,
defend, and save harmless the City of Newport Beach, its officers, employees and agents,
as therein stipulated, then, Surety will faithfully perform the same, in an amount not
exceeding the sum specified in this Bond; otherwise this obligation shall become null and
void.
As a part of the obligation secured hereby, and in addition to the face amount
specified in this Performance Bond, there shall be included costs and reasonable
expenses and fees, including reasonable attorneys fees, incurred by City, only in the
event City is required to bring an action in law or equity against Surety to enforce the
obligations of this Bond.
Surety, for value received, stipulates and agrees that no change, extension of time,
alterations or additions to the terms of the Contract or to the Work to be performed
Zebron Contracting, Inc. Page E-1
12-28
thereunder shall in any way affect its obligations on this Bond, and it does hereby waive
notice of any such change, extension of time, alterations or additions of the Contract or
to the Work or to the specifications.
This Faithful Performance Bond shall be extended and maintained by the Principal
in full force and effect for one (1) year following the date of formal acceptance of the
Project by City.
In the event that the Principal executed this bond as an individual, it is agreed that
the death of any such Principal shall not exonerate the Surety from its obligations under
this Bond.
IN WITNESS WHEREOF, this instrument has been duly executed by the Principal
and Surety above named, on the day of , 20
Name of Contractor (Principal)
Name of Surety
Address of Surety
Telephone
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date:
0
Aaron C. Harp
City Attorney
Authorized Signature/Title
Authorized Agent Signature
Print Name and Title
NOTARY ACKNOWLEDGMENTS OF
CONTRACTOR AND SURETY MUST BE ATTACHED
Zebron Contracting, Inc. Page E-2
12-29
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of }ss.
On , 20 before me, ,
Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who
signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity
of that document.
State of California
County of }ss.
On , 20 before me, ,
Notary Public, personally appeared
proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same
in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument
the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
(seal)
Zebron Contracting, Inc. Page E-3
12-30