HomeMy WebLinkAbout07 - Big Canyon Reservoir Flow Metering Vault and Treatment ImprovementsCITY OF
NEWPORT BEACH
City Council Staff Report
TO:
FROM:
PREPARED BY:
PHONE:
TITLE:
ABSTRACT:
August 8, 2017
Agenda Item No. 7
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
Ben Davis, Associate Civil Engineer, bdavis@newportbeachca.gov
949-644-3317
Big Canyon Reservoir Flow Metering Vault and Treatment
Improvements — Award of Contract No. 6104 (16W13)
Staff has received construction bids for the Big Canyon Reservoir Flow Metering Vault
and Treatment Improvements project and is requesting City Council's approval to award
the construction contract to Schuler Constructors, Inc. of Corona, California.
RECOMMENDATION:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15302 (c) Class 2, (replacement or reconstruction of existing utility
systems involving negligible or no expansion of capacity) of the CEQA Guidelines,
because it has no potential to have a significant effect on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 6104 to Schuler Constructors, Inc. for the total bid amount of
$1,610,500.00, and authorize the Mayor and City Clerk to execute the contract;
d) Establish a contingency of $161,000.00 (approximately 10% of Total Bid) to cover the
cost of unforeseen work not included in the original contract; and
e) Approve Budget Amendment No. 18BA-003 appropriating $200,000.00 from the
Water Capital Fund (Non Master Plan) to Account No. 70201932-980000-16W13 for
Big Canyon Reservoir Flow Metering Vault and Treatment Improvements.
FUNDING REQUIREMENTS:
The Budget Amendment records and appropriates $200,000 in increased expenditure
appropriations from the Water Capital (NMP) Fund.
7-1
Big Canyon Reservoir Flow Metering Vault and Treatment Improvements —
Award of Contract No. 6104 (16W13)
August 8, 2017
Page 2
Upon approval of the proposed budget amendment, sufficient funding is available for the
award of this contract. The following funds will be expensed:
Account Description Account Number Amount
Water Capital NMP 70201932-980000-16W13 $ 1,000,000.00
Water Enterprise 70101-980000-16W13 $ 815,500.00
Total: $ 1,815,500.00
Staff recommends establishing approximately ten (10) percent for contingency purposes
for unforeseen conditions associated with construction.
Proposed fund uses are as follows:
Vendor
Schuler Constructors, Inc.
Schuler Constructors, Inc.
Geotechnical Consultant
Various
DISCUSSION:
Purpose
Amount
Construction Contract
$
1,610,500.00
Construction Contingency
$
161,000.00
Special Inspection and Testing
$
41,000.00
Printing and Incidentals
$
3,000.00
Total: $ 1,815,500.00
The City of Newport Beach owns and operates Big Canyon Reservoir (BCR) which is a
two hundred million -gallon potable water reservoir built in 1958. Water leaving the
reservoir is treated with sodium hypochlorite and aqua ammonia to form chloramines for
disinfection of the water. The on-site treatment system is located in the basement of the
BCR control building.
The City conducted a study in November 2014 to analyze flow measurement accuracy
and water disinfection at the BCR flow control building. The analysis found two areas that
could be improved. First, the existing flow meter is a 42 -inch propeller meter which is not
ideal for measuring low flows. The second issue is the water disinfection dosing and
mixing process can be improved with flash mixing devices before entering the water
distribution system.
The City retained Stantec Consulting Services, Inc. to design improvements to flow
metering and mixing. The design involves constructing a concrete vault to house a new
30 -inch magnetic flow meter to replace the 42 -inch propeller meter. Flash mixing will be
achieved by installing two mixing systems to handle high and low flow conditions. The
first mixing device is a 42 -inch Ultra Tab static mixer that will handle the medium to high
flow conditions. The second device is a hydraulic mixing system that uses three jet
nozzles that will mix lower flow conditions. During the design process, the consultant
conducted extensive modeling to confirm the design will meet the mixing requirements at
all flow conditions.
7-2
Big Canyon Reservoir Flow Metering Vault and Treatment Improvements —
Award of Contract No. 6104 (16W13)
August 8, 2017
Page 3
This project will also replace the existing 60 year-old crane that has been identified as
unusable due to a safety recall for defective railway welds. The new crane will assist City
operations' staff with the maintenance of large valves and pipelines in the control building
basement.
At 10 a.m. on July 11, 2017, the City Clerk opened and read the following bid for this
project:
BIDDER
TOTAL BID AMOUNT
Low Schuler Constructors, Inc.
$1,610,500.00
2nd RC Foster Corporation
$1,671,000.00
3rd Gateway Pacific Contractors, Inc.
$1,754,448.00
4th GCI Construction, Inc.
$2,523,000.00
The City received multiple bids for this project and the low bid amount is 28.8 percent
above the engineer's estimate of $1,250,000.00. The majority of the cost differential is
associated to the cost of the concrete meter vault. The proposed improvements require
significant excavation and a complicated shoring system in order to construct the 14 -foot
by 14 -foot concrete vault approximately 30 feet below the ground surface. The contractor
is required to adhere to stringent shoring requirements as stipulated in the geotechnical
report. Also, concrete costs have recently increased because of California Assembly Bill
219. This law requires that all concrete truck drivers be paid prevailing wages. As a result,
the cost of transporting the concrete material was significantly higher than estimated.
These two items combined account for the increase in cost above the engineers estimate.
In post bid discussions with contractors, additional value engineering is limited because
of the depth and complexities. Public Works and Municipal Operations re -reviewed all of
the bid items and jointly agree that this project is necessary, provides value to the water
system, and its costs reflect the current marketplace, and recommend moving forward
with the project.
The low bidder, Schuler Constructors, Inc., possesses a California State Contractors
License Classification "A" as required by the project specifications. A check of the
contractor's references indicates satisfactory completion of similar projects for other
public agencies.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15302 (c) Class 2, (replacement
or reconstruction of existing utility systems involving negligible or no expansion of
capacity) of the CEQA Guidelines, because it has no potential to have a significant effect
on the environment.
7-3
Big Canyon Reservoir Flow Metering Vault and Treatment Improvements —
Award of Contract No. 6104 (16W13)
August 8, 2017
Page 4
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Budget Amendment
7-4
ATTACHMENT A
o j
a 0 GJ�
a
PROJECT
_ LOCATION
D
0
0
00
o
BIG CANYON
pq o RESEVOIR
/F
�c
0
a
s
ti
0
q
�N
y�
4 4
S �
D N.T.S.
BIG CANYON RESERVOIR FLOW METERING VAULT CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
AND TREATMENT IMPROVEMENTS
LOCATION MAP 8/8/2017
7-5
ATTACHMENT B City of Newport Beach
BUDGET AMENDMENT
2017-18
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
X Increase Expenditure Appropriations
Transfer Budget Appropriations
SOURCE:
from existing budget appropriations
from additional estimated revenues
X from unappropriated fund balance
EXPLANATION:
NO. BA- 18BA-003
AMOUNT:J $200,000.00
This budget amendment is requested to provide for the following:
To increase expenditure appropriations for the Big Canyon Reservoir Flow Metering Vault and Treatment
Improvements Proiect,
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund
Increase in Budgetary Fund Balance
ANDX
Decrease in Budgetary Fund Balance
300000
No effect on Budgetary Fund Balance
ONE-TIME?
N
Yes
Or_q
No
This budget amendment is requested to provide for the following:
To increase expenditure appropriations for the Big Canyon Reservoir Flow Metering Vault and Treatment
Improvements Proiect,
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund
Object
Description
702
300000
Water Capital Fund - Fund Balance
REVENUE ESTIMATES
Or_q
Object
Description
EXPENDITURE APPROPRIATIONS
Description
Org Number
70201932
CAP NMP Distribution & Piping
Object Number
980000
CIP Exp
Project Number
16W13
Big Canyon Reservoir Meter Valve
Project String
E -16W13 -CONSTRUCT -702 -UNASSIGNED
Signed: �// p��
�•'l�` Fi fal Approva : Financear
Signed: l
Signed
Administraflve Approval: City Manag
City Council Approval: City Clerk
Amount
Debit Credit
$200,000.00
Automatic
$200,000.00
7 -- 17