Loading...
HomeMy WebLinkAboutN2017-0034,Ewrr„� City of Newport Beach T 100 Civic Center Drive: Newport Beach, CA 92660 Permit Counter Phone (949)644-3311 y Q Online Inspection Request - www.newportbeachca.gov / Online c ' ' Services '�4tPi1F=i�� Job Address: 2304 REDLANDS DR NB Description : NEW CURB DRAIN PER STD 184-I. Parcel # : 1193-330-8 - Legal Desc : N TR 3476 LOT 3 Owner: ARROW JASON Phone: Address: 2304 REDLANDS DR NEWPORT BEACH, CA 92660 Applicant: ARROW JASON Phone: 714-876-4668 [ Address : 2304 REDLANDS DR NEWPORT BEACH, CA 92660 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Ilpiiiiiliiiiiiiiiii II SCANNED Permit No: N2017-0034 Project No : 2024-2015 Inspection Requests Phone (949)644-3255 Thomas:Guide: 889C3 Contractor : J G CONSTRUCTION Phone: Address : 2338 MOUNTAIN AVENUE LA CRESCENTA CA 414.) OEM Contractor State Lic: 522329 License Expire : 01 31, 2018 Permit Processing Fee : $241.00 Sewer Connection : $0.00 Agreement Fee: $0.00 4TT Box Cover: $0.00 Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Inspection Fee : $165.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Utilities Approval Traffic Approval : General Services Approval Date Date Date Date Business License: BT30057717 Business Expire: 06 15, 2017 Workers' Compensation Insurance - - Carrier: EXEMPT Policy No : W. C. Expire: Total Fee $406.00 Paid: $406.00 Balance: $0.00 Receipt No: Other Department : Date Permit Denied Date Issued Permit : Date -/1P )7 CITY OF NEWPORT h3EACH PUBLIC WORKS DEPARTMENT _ 7 CO PL fT : _k BL O NI 110 7, PROJECT ADDRESS: 2304 Redlands Dr Newport Beach CA 92660 DETAILED DESCRIPTION OF PROPOSED WORK: One 3 inch curb core on the North Eastern ri ht of wav for drainage APPLICANT: Jason Arrow Phone: 714-876-4668 Email Address: iasonarrow79@gmail.com Mailing Address: City/State/Zip: 2304 Redlands Dr Newport Beach, CA 92660 OWNER: Jason Arrow Phone: 714-876-4668 Email Address: jasonarrow79 mail.com Mailing Address: CitylStatelZip: 2304 Redlands Dr Newport Beach CA 92660 ALL CONTRACTOR INFORMATION IS REQUIRED -PLEASE COMPLETE CONTRACTOR: J G Construction lOffice Phone: 818-957-2659 Company (if different): Jobsite Phone: 818-957-2659 Other Phone: Email Address: Mailing Address: 2708 Foothill Blvd #275 City/State/Zip: La Crescents CA 91214 State License Number &Class: 522329 B Ex Tres: 01-31-187 City Business License Number: Expires: 06-15-17 WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Exempt Policy No: Expires: ........... ................................... ., ,..., :: :::..::...:.:... ,:::..::.:.... f'EF:UIVU/1fS4E:p.Ef'CiS.IT:INFORMAT.IQN:(16:App/lcable.::::::::;::::::-::<::..... ::; :::........::::::::::: ... ftefiind Pa 'able To .. .. Mail.Refund To ., FOR OFFICE USE ONLY Special Conditions of Permit: ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: General Services: Traffic: Fire: 0 Other: Engineering Technician: Public Works Specialist: Date: ( 1L)�� Permit No. t/userslVbwlshareO/cncroaGVmasierslepwoMshpelals Public Works Department 949.644.3311 Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Street/AlleyMalk Closure: Traffic Control Plan Check 8-1/2"x 11" 24" x 36" Inspection Fee: $241.00 Public Works Field Inspection $275.00P Utilities Field Inspection General Services Inspection Water Quality/Artificial Turf Inspection $192.00 $192.00 Refundable Deposit: $502.00P Improvements $65.00= Newspaper Rack Inspection $65.00 Sewer Connection Fee $143.00� 4TT Box & Cover $165.00 1 $121.00 $165.00 $108.00 $.00" $64 $64.00 I Qry• t4 (Water Meter: Installation Charge < $528.00 , 1314" Meter $50.25 Water Meter Boxes: 11" Meter $121.50 For Parkway & Sidewalk Area (Box + Cover = Cost) 11 1/2"`Meter $285.00 1" Meter. 13.00 + 37.00 $50.00 11 1/2" Turbine Meter $700.00 ' 2: Meter: 27,00 + 61.25 $88.258 12" Meter $425.00 ,1 12" Turbine Meter $845,00 For Traffic & Alley Areas (Box + Cover = Cost) 13" Meter $3,310.00 1" Meter. ' 13.00 + 38.00 $51.00 � 4" Meter $4,730.00 2" Meter: 27.00 + 162.00 $189.00 1 r6" Meter $7,190.00 1 Certificate of Compliance Fee (+100% of My over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone _ TBD 405-470_ Street EasemenWacationFee (+100%ofhriyover 4hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBDI 030-2284 Engineering Tech: Total Amount Due: For Finance use only Permit Specialist Receipt No. f /usersfpbw/sharedlencroach/masters/ep front and back masters/ Rev. 1/5/2017 epfeesheetAs-revised 10/21/2016 J G Contruction 2708 Foothill Blvd #275 La Crescenta, CA 91214 818-957-2659 BT30057717 City of Newport Beach Public Works Department 100 Civic Center Dr Newport Beach, CA 92660 RE: Encroachment Permit for 2304 Redlands Dr, Newport Beach, CA 92660 To Whom It May Concern: I, James Goldsworthy, owner of J G Construction Lic # 522329, give authorization to Jason Arrow to apply and pay for encroachment permit for 2304 Redlands Dr, Newport Beach, CA 92660. This permit is for a curb core to complete the drainage system at the above location. Please contact me with any further questions at 818-957-2659. Thank you, James Goldsworthy TERMS AND CONDITIONS OF ENCROACHMENT PERMIT Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved cop of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior t(Fysi n, d a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence w"j1,- s after date of issuance. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. Pennines guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by t Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. F construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate inspections by the Municipal Operations Department may be required depending on scope of work performed. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities tie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser. Property lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current,;?,Manual,of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways', issued`by„(he, California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $'(0.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lariats) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. Applicant must notify USA at 1.800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. All USA marks shall be removed prior to Final Public Works Inspection. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 94584A-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-ofdyay,, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify that I have a Certificate of consent to self -insure, Certificate of Worker's Compensation Insurance, or a Certified Copy thereof. Date: Signature: CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate 1 become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: i ' (P' i'-1 Signature: Tto CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: insp®cUch's"should; ba requested" bY`cailtn'g'th� Pttibltc;W9rks:`Jnspactfon Raqusstt tne-a4„9$8.644 3255, INITIALS: 15. All above ground facilities shall comply with the Municipal Code, including but not limited to Chapter 13.20. 16. Homeowner, contractors, and subcontractors may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill. 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the Municipal Operations Department, Parks and Street Trees Division. 19, All work in the public right-of-way must meet the approval of the Public Works Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20, Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21, Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. i 1100.50 TG /-9-8.22INV 2% MIN, I, 2%MIN. v 4 u. m PA EX. CONC. 25.7 LF PALRV �b 3 _ °/nG.N 2M f irr 4 �� �98.14 is B 3 PA INV f _ d ® .._ T , s �ii(! .PoTY^'• __.arts _ _ ��PL M. . w 7 02. o®� ,z CONSTRUCTION NOTES: l `� O CONSTRUCT 3" CURB CORE PER CITY OF NEWPORT BEACH STANDARD PLAN NO. 184-L 2O CONSTRUCT 4" TO 3" PVC REDUCER O CONSTRUCT 4" PVC (SDR35) STORM DRAIN 4O CONSTRUCT 12" X 12" NDS GRATE INLET O CONSTRUCT 5 1/2" P.C.C. OVER 4" A.B. DRIVEWAY. FINISH PER LANDSCAPE ARCHITECT PLANS OG CONSTRUCT BOTTOMLESS TRENCH DRAIN PER DETAIL ON SHEET 3 SpG )NS APP'D. DATE Plans prepared by: GIL E T ENGINEERING & ASSOCIATES, INC. 2 MERRIWEATHER PLACE LADERA RANCH, CA 92694 PH. (949) 218-8075 FAX (949) 218-8041 www,gllbert-englneering.com DRAWN: R.W.G. DESIGN: R.W.G. CHECKED: R.W.G. SCALE: V = 5' JOB NO.: 397.000 SHEET OF