HomeMy WebLinkAbout08 - Semeniuk Slough Maintenance Dredging Project — NOCPORT CITY OF F SEW O � NEWPORT BEACH C��FOR�P City Council Staff Report September 12, 2017 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb(@_newportbeachca.gov PREPARED BY: Bob Stein, Assistant City Engineer, rstein@newportbeachca.gov PHONE: 949-644-3322 TITLE: Semeniuk Slough Maintenance Dredging Project — Notice of Completion for Contract No. 3636B (Project No. 15X17) ABSTRACT: On October 25, 2016, City Council awarded Contract No. 3636B to restore flood conveyance capacity in Semeniuk Slough to Innovative Construction Solutions (ICS) of Santa Ana, California. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. On October 25, 2016, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15304 (H) (Minor Alterations to Land); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one (1) year after the acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description Tidelands Maintenance Caltrans Contributions Account Number 10001-980000-15X17 13501-980000-15X17 Total: Amount $1,285,400.00 300.000.00 $1,585,400.00 8-1 DISCUSSION: Semeniuk Slough Maintenance Dredging Project — Notice of Completion for Contract No. 3636B (15X17) September 12, 2017 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $1,572,800.00 $1,585,400.00 10% or less +0.8% +0.8% - Allowed Contract Time + 120 Actual Time 25 Approved Extensions (days) = Under (-) or Over (+) The work necessary to complete this contract consisted of constructing a temporary sheet pile cofferdam across the channel at the north end, dewatering the channel, removing 9,600 cubic yards of sediment from the slough which included 1,100 cubic yards of sediment removed from the portion of the slough owned by Caltrans, removing the cofferdam, installing native vegetation in disturbed areas, reinstalling fencing, and restoring the access gravel road (Note that Caltrans elected not to perform any sediment removal at this time from its 14 -foot wide culvert as originally anticipated). The public portion of the Semeniuk Slough has now been restored to its original depth of three feet below the Mean Lower Low Water and the contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: Actual Cost of Bid Items Constructed: Total Change Orders: $1,572,800.00 $1,585,400.00 $ 0.00 Final Contract Cost: $1,585,400.00 The actual cost of bid items constructed was $12,600.00 more than the original bid amount due to actual amount of sediment removed. A summary of the project milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 10/3/16 Actual Start of Construction Per Notice To Proceed 12/27/16 Extended Contract Completion Date Inclusive of Extra Work 4/26/17 Actual Substantial Construction Completion Date 4/1/17 The project was substantially complete as of April 1, 2017. The contractor completed its 60 -day plant maintenance requirements on July 31, 2017. 8-2 Semeniuk Slough Maintenance Dredging Project — Notice of Completion for Contract No. 3636B (15X17) September 12, 2017 Page 3 ENVIRONMENTAL REVIEW: At the October 25, 2016 City Council meeting, the project was found to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15304 (H) (Minor Alterations to Land) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 8-3 e 0 125 Oso Feet Pf Cofferdamn Location Additional Excavation by City Contractor as feasible Base Project by City Contractor Box Culvert Excavation by Caltrans Caltrans Area Excavated by City Contrator Semeniuk Slough Award City of Newport Beach GIS Division September 12, 2016 8-4