HomeMy WebLinkAbout07 - Central Avenue Public Dock ProjectQ SEW Pp�T CITY OF �m z NEWPORT BEACH c�<,FORN'P City Council Staff Report October 24, 2017 Agenda Item No. 7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Peter Tauscher, Senior Civil Engineer ptauscher@newportbeachca.gov PHONE: 949-644-3316 TITLE: Central Avenue Public Dock Project — Notice of Completion for Contract No. 8197-1 (Project No. 17H12) ABSTRACT: On April 11, 2017, City Council awarded Contract No. 8197-1 for Central Avenue Public Dock Project to Associated Pacific Constructors, Inc. (APC). The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) On April 11, 2017, City Council found this action exempt from the California Environmental Quality Act (CEQA) pursuant to Class 4 Section 15303 Class 3 New construction or Conversion of Small Structures of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release Faithful Performance Bond one (1) year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following accounts: Account Description Contributions Tidelands Capital Account Number 13501-980000-17H12 10101-980000-17H12 Amount $ 75,562.00 $ 172,288.00 Total: $ 247,850.00 7-1 Central Avenue Public Dock Project — Notice of Completion for Contract No. 8197-1 (Project No. 17H12) October 24, 2017 Page 2 DISCUSSION: The Central Avenue Public Dock is located adjacent to the Newport Boulevard bridge near Lido Marina Village. Primary users of this dock are expected to be small dinghies from local anchorage and other smaller craft who will visit local businesses. The plaza area revitalization is currently in construction under a separate contract. The recently installed public dock offers the following features: • The 50 -foot gangway maximizes accessibility to the greatest extent possible. In addition, its diagonal position to the float relative to the seawall also minimizes the extension of the float into the adjacent navigational channel, • Eleven cleats spaced along the backside of the float for small dinghies. A 20 -foot vessel may dock on either end of the float, and at least three to four smaller 20 -foot vessels may dock on the bayward side of the float, • The float is 84 -feet long and 10 -feet wide to better accommodate side -tied 20 -foot vessels, and • A new guardrail system providing added safety to the Central Avenue Plaza. Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Completion Allowance Contract Directed Unforeseen Amount Change Change Change $232,100.00 $247,850.00 10% or less +6.8% 0.0% +6.8% Allowed Contract Time + Approved 89 Actual Time -14 Extensions days) = Under (-) or Over (+) Contract No. 8197-1, Cental Avenue Public Dock has now been completed to the satisfaction of the Public Works Department. A summary of this contract's construction cost is as follows: Original Bid Amount: $232,100.00 Actual Cost of Bid Items Constructed: $232,100.00 Total Change Orders: $ 15,750.00 Final Contract Cost: $247,850.00 Two change orders were issued totaling $15,750.00, a 6.8 percent increase over the original contract amount, and were within the contingency allowance. The change orders included changes to the guardrail system, adding a top rail to the gangway, skim coating the new bulkhead section, and additional sawcutting along the bulkhead. 7-2 Central Avenue Public Dock Project — Notice of Completion for Contract No. 8197-1 (Project No. 17H12) October 24, 2017 Page 3 A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 5/1/2017 Actual Start of Construction Per Notice To Proceed 6/14/2017 Extended Contract Completion Date Inclusive of Extra Work 10/19/2017 Actual Substantial Construction Completion Date 9/29/2017 ENVIRONMENTAL REVIEW: On April 11, 2017, City Council found this action exempt from the California Environmental Quality Act (CEQA) pursuant to Class 4 Section 15303 Class 3 New construction or Conversion if Small Structures of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 7-3 D W J 0 m CENTRALAVENUE PUBLIC DOCK CENTRAL AVENUE PUBLIC DOCK 17H12 LOCATION MAP ATTACHMENT A NEWPORT HARBOR X NOT TO SCALE PROJECT LIMITS CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-8197-1 I 10/24/17 7-4