Loading...
HomeMy WebLinkAbout04 - Proposed Harbor Pointe Senior Living Project Located at 101 Bayview PlacePaR m CITY OF �\`S NEWPORT BEACH cy<`o-P City Council Staff Report January 23, 2018 Agenda Item No. 4 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Seimone Jurjis, Community Development Director - 949-644-3232, sjurjis@newportbeachca.gov PREPARED BY: Benjamin M. Zdeba, AICP, Associate Planner, bzdeba@newportbeachca.gov PHONE: 949-644-3253 TITLE: Amendment of Professional Services Agreement with Psomas DBA BonTerra Psomas for Environmental Services for the Proposed Harbor Pointe Senior Living Project Located at 101 Bayview Place (PA2015-210) ABSTRACT: An amendment of a professional services agreement (PSA) with Psomas for environmental consulting services for the preparation of an environmental impact report for the proposed Harbor Pointe Senior Living project located at 101 Bayview Place. RECOMMENDATION: a) Determine that the action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because it will not result in a physical change to the environment, directly or indirectly; and b) Approve the amendment to the Professional Services Agreement, and authorize the Mayor and City Clerk to execute the agreement. FUNDING REQUIREMENTS: There is no fiscal impact related to this item. The applicant, Harbor Pointe Senior Living, LLC, will reimburse the City for the entire cost of $230,530 for the consulting service. DISCUSSION: On November 23, 2015, the applicant submitted an application for legislative and discretionary approvals to accommodate the future redevelopment of the project site with a senior living facility. Attachment C provides an aerial photograph of the project site. 4-1 Amendment of Professional Services Agreement with Psomas DBA BonTerra Psomas for Environmental Services for the Proposed Harbor Pointe Senior Living Project Located at 101 Bayview Place (PA2015-210) January 23, 2018 Page 2 The project site at 101 Bayview Place currently has a single -story restaurant (Kitayama) and is designated by the General Plan for CO -G (General Commercial Office). The applicant is requesting a general plan amendment to change the land use to PI (Private Institutions) and allow the development of an approximately 85,000 -square -foot, 121 -bed congregate care and convalescent senior living facility. Required applications include a General Plan Amendment, Planned Community Development Plan Amendment, Site Development Review, and a Conditional Use Permit. Initial analysis of CEQA compliance concluded that an initial study/mitigated negative declaration (IS/MND) was appropriate. A PSA for the IS/MND was executed for Psomas DBA BonTerra Psomas in March 2016, for $85,530, and an initial study was prepared. Upon further review, it was determined the project may result in one or more potentially significant environmental impacts; therefore, an environmental impact report (EIR) should be prepared. In September 2016, City Council approved an amended PSA for $197,640 to complete the EIR. A scoping meeting was held in August 2016, and the project was subsequently introduced at a Planning Commission study session in February 2017. Based on the feedback received from the community and staff during this time, the applicant revised the proposed project. In October 2017, revised plans were provided to Psomas for review. Based on the significant changes, Psomas submitted a revised scope of work stating that modified analyses are required resulting in additional fees of $32,890. All work completed to date is within the original amount. The current PSA is set to expire in March 31, 2018. This amendment is necessary to continue the process. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A — Amendment of Professional Services Agreement with Psomas Attachment B — Current Professional Services Agreement with Psomas Attachment C — Project Site Exhibit 4-2 Attachment A Amendment of Professional Services Agreement with Psomas M AMENDMENT NO. THREE TO PROFESSIONAL SERVICES AGREEMENT WITH PSOMAS DBA BONTERRA PSOMAS FOR PREPARATION OF INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FOR THE HARBOR POINTE SENIOR LIVING PROJECT THIS AMENDMENT NO. THREE TO PROFESSIONAL SERVICES AGREEMENT ("Amendment No. THREE") is made and entered into as of this 31st day of March, 2018 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and PSOMAS DBA BONTERRA PSOMAS, a California corporation ("Consultant"), whose address is 3 Hutton Centre Drive, Suite 200, Santa Ana, California 92707, and is made with reference to the following: RECITALS A. On March 30, 2016, City and Consultant entered into a Professional Services Agreement ("Agreement") for preparation of Initial Study/Mitigated Negative Declaration (IS/MND) for the Harbor Pointe Senior Living Project in accordance with the California Environmental Quality Act ("CEQA") ("Project"). B. On May 25, 2016, City and Consultant entered into Amendment No. One to the Agreement ("Amendment No. One") to reflect modifications to the Schedule of Billing Rates to the Agreement. C. On September 27, 2016, City and Consultant entered into Amendment No. Two to the Agreement ("Amendment No. Two") to reflect additional Services not included in the Agreement, as amended, to extend the term of the Agreement to March 31, 2018, and to increase the total compensation. D. The parties desire to enter into this Amendment No. Three to reflect additional Services not included in the Agreement, as amended, to extend the term of the Agreement to March 31, 2019, to increase the total compensation, and to update the indemnification provisions. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: TERM Section 1 of the Agreement is amended in its entirety and replaced with the following: "The term of this Agreement shall commence on the Effective Date, and shall terminate on March 31, 2019, unless terminated earlier as set forth herein." 2. SERVICES TO BE PERFORMED Exhibit A to the Agreement shall be supplemented to include the Scope of Services, attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). Exhibit A to the Agreement, Exhibit A to Amendment No. Two, and Exhibit A H to this Amendment No. Three shall collectively be known as "Exhibit A." The City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. COMPENSATION TO CONSULTANT Exhibit B to the Agreement shall be supplemented to include the Schedule of Billing Rates, attached hereto as Exhibit B and incorporated herein by reference ("Services" or "Work"). Exhibit B to the Agreement, Exhibit B-1 to Amendment No. One, and Exhibit B to this Amendment No. Three shall collectively be known as "Exhibit B." Section 4.1 of the Agreement is amended in its entirety and replaced with the following: "City shall pay Consultant for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Two Hundred Thirty Thousand Five Hundred Thirty Dollars and 00/100 ($230,530.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City." The total amended compensation reflects Consultant's additional compensation for additional Services to be performed in accordance with this Amendment No. Three, including all reimbursable items and subconsultant fees, in an amount not to exceed Thirty Two Thousand Eight Hundred Ninety Dollars and 00/100 ($32,890.00). 4. HOLD HARMLESS Section 9.1 of the Agreement is amended in its entirety and replaced with the following: "9.1. To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers, employees and any person or entity owning or otherwise in legal control of the property upon which Consultant performs the Project and/or Services contemplated by this Agreement (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Agreement, any Work performed or Services provided under this Agreement including, without limitation, defects in workmanship or materials or Consultant's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or Psomas dba Bonterra Psomas Page 2 G� omissions of Consultant, its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable, or any or all of them). 5. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] Psomas dba Bonterra Psomas Page 3 Mo IN WITNESS WHEREOF, the parties have caused this Amendment No. Three to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: ! Z,/Z( / / �- Aaron C. Harp 6%M %,L «lig City Attorney ATTEST: Date: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Duffy Duffield Mayor CONSULTANT: Psomas dba Bonterra Psomas, a California corporation Date: By: Kathleen Brady, AICP Vice President, Environmental Planning Date: By: Joan Patronite Kelly Senior Vice President/Principal [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Psomas dba Bonterra Psomas Page 4 G�1 EXHIBIT A SCOPE OF SERVICES Psomas dba Bonterra Psomas Page A-1 4-8 Harbor Pointe Senior Assisted Living and 1lemory Care Project SCOPE OF WORK HARBOR POINT SENIOR ASSISTED LIVING AND MEMORY CARE PROJECT ENVIRONMENTAL IMPACT REPORT November 30, 2017 PROJECT UNDERSTANDING The proposed Harbor Pointe Senior Assisted Living and Memory Care Project (hereinafter referred to as the "Harbor Pointe Project" or the "Project") proposes development of a 120 -bed Senior Assisted Living and Memory Care facility, ancillary uses, and subsurface parking on an approximate 1.5 -acre site. The Project site is located at 101 Bayview Place in Newport Beach, at the northeast corner of the site. The site is bordered by Bristol Street on the northeast and Bayview Place on the southeast. To the northwest and southwest, the site abuts single- and multi -family residential developments. As part of the proposed development, the existing single -story, approximate 8,800 -square -foot restaurant and its associated surface parking lot would be demolished to accommodate the development of a 3 -story, 109,179 -gross -square -foot, 120 -bed Senior Assisted Living and Memory Care facility with 1 level of subterranean parking, which will include a total of 53 parking stalls. The proposed facility will include amenities such as a salon and spa, a fitness room, a movie theater, a community store, living rooms, dining rooms, a bistro, a library, activity rooms, a computer lab, an outdoor courtyard, and an outdoor deck looking down onto the interior courtyard. The site is currently designated CO -G (General Commercial Office) and is part of the existing Bayview Planned Community Development Plan (PC -32). In order to accommodate development of the proposed Project, the following discretionary actions would be required: (1) A General Plan Amendment (GPA) to change the land use designation from the existing CO -G (General Commercial Office) to PI (Private Institutions); (2) a Planned Community Development Plan Amendment to amend the existing Bayview Planned Community Development Plan (PC -32) to allow for Senior Residential and Private Institution uses; (3) a Major Site Development Review to allow the construction of over 109,179 square feet of assisted living gross floor area; and (4) a Conditional Use Permit to allow the establishment of a 120 -bed senior assisted living and memory care community. SUPPLEMENTAL SCOPE OF WORK FOR THE ENVIRONMENTAL IMPACT REPORT TASK 2 DRAFT ENVIRONMENTAL IMPACT REPORT' The City of Newport Beach made a determination that a full -scope EIR, inclusive of all environmental topics, will be the appropriate CEQA document for the proposed Project. Therefore, preparation of a Notice of Preparation (NOP) would suffice and an Initial Study would not be required. BonTerra Psomas prepared and published a Notice of Preparation (NOP) for a 30 -day public review period. BonTerra Psomas additionally, with assistance from the City, conducted a Scoping Meeting during the 30 -day public review of the NOP. This task has been fulfilled, and no additional work is necessary. 1 The task number follows the original scope of work for the EIR R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-113017.docx Scope of Work G • Harbor Pointe Senior Assisted Living and Memory Care Project Task 2.1 Administrative Draft Environmental Impact Report As stated in the previous SOW, BonTerra Psomas will prepare the Administrative Draft EIR in accordance with CEQA (Public Resources Code, Sections 21000, et seq.), the State CEQA Guidelines (California Code of Regulations [CCR], Title 14, Section 15000 et seq.), and pertinent case law. The analysis will be based upon the NOP comments received; community and agency input received at the Scoping Meeting; technical evaluation of the proposed Project; and available and pertinent data. In light of the modified Project Description, the following presents only the supplemental work effort for the preparation of the Administrative Draft EIR: Project Description. While the components of the Project Description would remain as identified in the previous EIR SOW, the modified Project Description would necessitate additional effort not previously anticipated. The revisions to the Project Description will ripple through the EIR document. Although a revised Project Description has been provided, given the level of detail required for an EIR, BonTerra Psomas would provide additional discussion and detail using the Site Plans and other information provided to the City by the Applicant. Some of the details include, but are not limited to, information on building setbacks; grading quantities; landscape and lighting concepts; construction durations; on- and off-site improvements. Environmental Analysis As stated above, the revisions to the Project Description will affect the discussion of the Project and its components throughout the EIR, as appropriate. Below is a brief discussion of the environmental topics that would be affected: Aesthetics. As the proposed facility has been re -designed to reduce the height and density, the visual simulations and shade and shadow studies would need to be re -done in order to correctly reflect the proposed modified structure and its visual and shade and shadow impacts. A revised set of Visual Simulations have been provided to BonTerra Psomas, which will be incorporated into the Aesthetics section and analyzed. The previous shade and shadow study, which was prepared by BonTerra Psomas would also need to be re -done for the analysis of potential impacts. Therefore, the Aesthetics section for the EIR would be re -written to reflect the modified facility and the updated Visual Simulation and Shade and Shadow studies. The following is a brief SOW for preparation of the Shade and Shadow for the modified Project: o BonTerra Psomas will create a three-dimensional model of the proposed structures and surrounding topography, which will be subsequently used to perform one Shade and Shadow analysis for the spring/fall equinoxes, and two analyses for the summer/winter solstices. Three points in time on each day will be analyzed (e.g., morning, noon and dusk) resulting in a total of nine shade/shadow models. Upon completion of the analysis, Psomas will prepare maps and exhibits, including one top-down view of the proposed shade and shadows for each of the nine models (resulting in nine maps). • Air Quality. It has been determined that the existing emissions need to be recalculated as the CalEEMod has been revised and updated since preparation of the previous SOW. The modeling would need to be rerun, and the analysis modified to reflect the updated model runs. Please note, the modified Air Quality analysis will be prepared by the same technical expert who prepared the previous work for the IS/MND as a Psomas employee and has been retired since then. Greenhouse Gas Emissions (GHG). It has also been determined that the existing and future operations and Project construction GHG pollutant emissions will be recalculated using the CalEEMod 2016 model as described for the air quality analysis. The analysis will be modified to reflect the update model runs. Please note, the modified GHG analysis will be prepared by the R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-113017.docx Scope of Work 4-10 Harbor Pointe Senior Assisted Living and Memory Care Project same technical expert who prepared the previous work for the IS/MND as a Psomas employee and has been retired since then. • Hazards and Hazardous Materials. The Part 77 consultation request with FAA was not anticipated to be redone, as the reduced height of the proposed facility is not expected to result in a conflict and hence impacts. However, the No Conflict Determination by the Airport Land Use Commission (ALUC) will expire on December 8, 2017. In light of this, a new Part 77 consultation request will need to be prepared and submitted. • Hydrology and Water Quality. The City is confirming with the Project civil engineer the validity of the previous Water Quality Management Plan (WQMP). If necessary, the WQMP will be updated to reflect the modified Project. In light of the potential revisions in the WQMP, BonTerra Psomas will adjust the analysis, as appropriate. • Land Use and Planning. In light of the modified Project, the policy analysis in this section will be updated to reflect the revised description. • Noise. Existing noise conditions are assumed to be the same as described in the previous SOW. Psomas will take new noise measurements, if updated measurements are deemed necessary. The noise analysis will be updated in light of the modified Project Description, as appropriate. Please note, the modified Noise analysis will be prepared by the same technical expert who prepared the previous work for the IS/MND as a Psomas employee and has been retired since then. • Transportation/Traffic. As construction traffic was determined to be an important issue for the community, per the City's request and the Applicant's concurrence, LLG will conduct a construction traffic analysis and also update the Project Description in the report. The following is the proposed SOW from LLG: o Prepare an estimate of Project Alternative -related vehicle trips based on the appropriate Institute of Transportation Engineers (ITE) Trip Generation rates. o Collect daily roadway segment traffic count data for one segment of Bayview Place adjacent to the Project and one segment of eastbound Bristol Street adjacent to the cross - street for construction impact analysis. o Coordinate with the Project team regarding the number of employees and other transportation related activities (e.g., materials deliveries, equipment deliveries, etc.) anticipated during the construction phase of the proposed Project. o Determine likely trip distribution of construction related traffic, and assign trips. o Evaluate the potential for Project related traffic impacts, based on the estimated construction traffic, in the context of the City of Newport Beach. o Summarize the results of the trip generation and construction assessments in a letter report. Cumulative Impacts. In preparation of the cumulative analysis in the EIR, BonTerra Psomas will work with the City staff to determine if the list of cumulative projects in the area has been modified since the previous SOW, and if so, will update the list. R:\Projects\NEW\3NEW003100\SOWs\SOW Harbor Pointe EIR-113017.docx Scope of Work 4-11 EXHIBIT B SCHEDULE OF BILLING RATES Psomas dba Bonterra Psomas Page B-1 4-12 Harbor Pointe Senior Assisted Living and Memory Care Project FEE ESTIMATE HARBOR POINT SENIOR ASSISTED LIVING AND MEMORY CARE PROJECT ENVIRONMENTAL IMPACT REPORT November 30, 2017 Task Description Fee BonTerra Psomas Professional Fees Task 1 Environmental Impact Report 1.1 Administrative Draft EIR $23,590.00 Subtotal BonTerra Psomas Professional Fees $23,590.00 ESTIMATED DIRECT EXPENSES Traffic Analysis (Urban Crossroads) $4,800.00 Air Quality/Greenhouse Gas Emissions/Noise $4,500.00 Subtotal Direct Expenses $9,300.00 TOTAL FEE ESTIMATE TASKS 1-4 $32,890.00 R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-113017.docz Fee Estimate 4-13 Attachment B Current Professional Services Agreement with Psomas 4-14 AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT WITH PSOMAS DBA BONTERRA PSOMAS FOR PREPARATION OF ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE HARBOR POINTE SENIOR LIVING PROJECT THIS AMENDMENT NO. TWO TO PROFESSIONAL SERVICES AGREEMENT ("Amendment No. Two") is made and entered into as of this 27th day of September, 2016 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and PSOMAS DBA BONTERRA PSOMAS, a California corporation ("Consultant"), whose address is 3 Hutton Centre Drive, Ste. 200, Santa Ana, California 92707, and is made with reference to the following: RECITALS A. On March 30, 2016, City and Consultant entered into a Professional Services Agreement ("Agreement") for Initial Study/Mitigated Negative Declaration (IS/MND) for the Harbor Pointe Senior Living Project in accordance with the California Environmental Quality Act ("CEQA") ("Project"). B. On May 25, 2016, City and Consultant entered into Amendment No. One to the Agreement ("Amendment No. One") to reflect modifications to the Schedule of Billing Rates to the Agreement. C. The parties desire to enter into this Amendment No. Two to reflect additional Services not included in the Agreement, as amended, to extend the term of the Agreement to March 31, 2018 and to increase the total compensation. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: Section 1 of the Agreement is amended in its entirety and replaced with the following: "The term of this Agreement shall commence on the Effective Date, and shall terminate on March 31, 2018, unless terminated earlier as set forth herein." 2. SERVICES TO BE PERFORMED Exhibit A to the Agreement shall be supplemented to include the Scope of Services, attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). Exhibit A to the Agreement, Exhibit A to this Amendment No. Two shall collectively be known as "Exhibit A." The City may elect to delete certain Services within the Scope of Services at its sole discretion. 4-15 3. COMPENSATION TO CONSULTANT Section 4.1 of the Agreement is amended in its entirety and replaced with the following: "City shall pay Consultant for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed One Hundred Ninety Seven Thousand Six Hundred Forty Dollars and 00/100 ($197,640.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City." The total amended compensation reflects Consultant's additional compensation for additional Services to be performed in accordance with this Amendment No. Two, including all reimbursable items and subconsultant fees, in an amount not to exceed One Hundred Twelve Thousand One Hundred Ten Dollars and 00/100 ($112,110.00). 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] Psomas DBA BonTerra Psomas Page 2 4-16 IN WITNESS WHEREOF, the parties have caused this Amendment No. Two to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: Aaron C. Harp a City Attorney ATTEST: t Date: / �• (. �!% By: 6&S- Leilani I. Brown City Clerk L'gLi FORS CITY OF NEWPORT BEACH, a California municipcor or ion I Date::'- ne B. Dixon Mayor CONSULTANT: Psomas DBA BonTerra Psomas, a California corporation Date: lallelllb Kathleen Brady, AICP Vice President, Environmental Pla�ni ng Date: l 6 J an Patronite elly Senior Vice President/Princip�l [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Psomas DBA BonTerra Psomas Page 3 4-17 Psomas DBA BonTerra Psomas Page A-1 Harbor Pointe Senior Living Project ATTACHMENT A SCOPE OF WORK HARBOR POINT SENIOR LIVING PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION August 25, 2016 PROJECT UNDERSTANDING The proposed Harbor Pointe Senior Living Project (hereinafter referred to as the "Harbor Pointe Project" or the "Project") proposes development of a 144 -bed convalescent facility and congregate care home on an approximate 1.5 -acre site. The Project site is located at 101 Bayview Place in Newport Beach, at the northeast corner of the site. The site is bordered by Bristol Street on the northeast and Bayview Place on the southeast. To the northwest and southwest, the site abuts single- and multi -family residential developments. As part of the proposed development, the existing single -story, approximate 8,800 -square -foot restaurant and its associated surface parking lot would be demolished to accommodate the development of a 5 -story, 109,633 -square -foot, 144 -bed convalescent and congregate care facility with 1 level of subterranean parking, which will include a total of 78 parking stalls. The proposed facility will include amenities such as a fitness room, a spa/salon, an outdoor Memory Care garden, a water feature, and seating areas. The proposed massing of the facility corresponds to adjacent uses (i.e., commercial along Bristol Street and residential to the southwest of the Project site) to create compatibility with the adjacent uses. The site is currently designated CO -G (General Commercial Office) and is part of the existing Bayview Planned Community Development Plan (PC -32). In order to accommodate development of the proposed Project, the following discretionary actions would be required: (1) A General Plan Amendment (GPA) to change the land use designation from the existing CO -G (General Commercial Office) to PI (Private Institutions); (2) a Planned Community Development Plan Amendment to amend the existing Bayview Planned Community Development Plan (PC -32) to increase the height and floor area and to change the land use limitations; (3) a Major Site Development Review to allow the construction of over 20,000 square feet of nonresidential gross floor area; and (4) a Conditional Use Permit to allow the establishment of a 144 -bed combined convalescent facility with congregate care housing. SCOPE OF ENVIRONMENTAL IMPACT REPORT Preparation of the EIR will include the following tasks: Task 1 Notice of Preparation (NOP) and Scoping Meeting Task 2 Environmental Impact Report Task 2.1 Administrative Draft Environmental Impact Report Task 2.2 Screencheck Draft Environmental Impact Report Task 2.3 Draft Environmental Impact Report and Distribution for Public Review Task 2.4 Final Environmental Impact Report and Responses to Comments Task 2.5 Findings of Fact and Statement of Overriding Considerations Task 3 Mitigation Monitoring and Reporting Program Task 4 Notice of Determination Task 5 Project Management, Project Meetings, and Public Hearings R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx A-1 Scope of Work 4-19 Harbor Pointe Senior Living Project TASK I NOTICE OF PREPARATION AND SCOPING MEETING The City of Newport Beach has made a determination that a full -scope EIR, inclusive of all environmental topics, will be the appropriate CEQA document for the proposed Project. Therefore, preparation of a Notice of Preparation (NOP) would suffice and an Initial Study would not be required. BonTerra Psomas will prepare of a Notice of Preparation (NOP), pursuant to Section 15082 of CEQA Guidelines, to notify the State Clearinghouse, responsible and trustee agencies, and the public that an EIR will be prepared for the proposed Project. BonTerra Psomas will prepare a Draft NOP for review by the City. The NOP will provide an overview of the Project; expected approvals required for Project implementation; and pertinent graphics. The NOP will also serve as a Scoping Meeting Notice. Upon receipt of comments from the City, BonTerra Psomas will revise the NOP and prepare a final copy prior to public review. BonTerra Psomas will be responsible for coordinating the reproduction and mailing of the NOP based on a distribution list provided by the City and address labels of the surrounding property owners provided by the Applicant. BonTerra Psomas will file the NOP with the State Clearinghouse and other responsible and trustee agencies. The NOP will be distributed via overnight delivery or certified with signed receipt as a proof of delivery, in compliance with the State CEQA Guidelines. Since no Initial Study is being prepared, the full NOP will be to property owners within 300 -foot radius of the Project site rather than preparing a separate notice of availability (NOA). The copies of the NOP to the surrounding property owners will be sent via U.S. mail. Based on discussions with the City, it is assumed that the City will publish a NOA of the NOP in the local paper. BonTerra Psomas will prepare for and attend one EIR Scoping Meeting that will be held during the 30 - day public review of the NOP. Is it assumed that the City will coordinate and organize the Scoping Meeting at the City Hall. BonTerra Psomas will attend and participate in the meeting, as appropriate. If requested by the City, BonTerra Psomas will describe the process to be followed in preparing the EIR for the proposed Project. Comments and issues to be addressed in the EIR will be requested from all meeting attendees. This Scope of Work assumes that BonTerra Psomas will prepare brief Scoping Meeting materials (e.g., handouts, sign in sheets, comment cards). However, any display boards will be provided by the Applicant. If requested by the City, BonTerra Psomas can prepare display boards and a PowerPoint presentation for the Scoping Meeting on a time and materials basis. BonTerra Psomas will prepare a summary of the meeting for inclusion in the EIR and will ensure that the issues raised at the meeting are addressed in the Draft EIR document, as appropriate. However, a standalone scoping report or transcript of the meeting is not assumed to be required. This Scope of Work assumes that visual displays will be provided by the Project Applicant, as necessary. Task I Deliverables ® Electronic copies of Draft and Final NOP (2 submittals) Distribution of up to 45 copies of the NOP via overnight mail or certified mail OR Distribution of NOP to surrounding residents (300 -foot radius) via U.S. mail. Scoping Meeting Materials (i.e., handouts, sign in sheets, comments cards) R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx A-2 Scope of Work 4-20 Harbor Pointe Senior TASK 2 DRAFT ENVIRONMENTAL IMPACT REPORT Task 2.1 Administrative Draft Environmental Impact Report BonTerra Psomas will prepare the Administrative Draft EIR in accordance with CEQA (Public Resources Code, Sections 21000, et seq.), the State CEQA Guidelines (California Code of Regulations [CCR], Title 14, Section 15000 et seq.), and pertinent case law. The analysis will be based upon the NOP comments received; community and agency input received at the Scoping Meeting; technical evaluation of the proposed Project; and available and pertinent data. The analysis assumes that the Project will comply with all applicable federal and State laws and regulations and the City of Newport Beach Municipal Code. The EIR text will be supplemented by exhibits and graphics to enhance and support the analysis and findings. Upon completion of the Administrative Draft EIR, it will be submitted electronically to the City for review and comment. BonTerra Psomas' approach to preparing key sections of the EIR is provided below. This Scope of Work assumes two rounds of review (i.e., Administrative and Screencheck Draft EIRs). Executive Summary. BonTerra Psomas will prepare the executive summary section upon completion of all other EIR sections in order to present the final and updated information. This section will summarize the Project Description, impacts, and mitigation measures. The summary will also discuss the location, areas of controversy and issues to be resolved, and Project alternatives. Introduction. BonTerra Psomas will prepare the introduction section, which will include a description of the purpose of the EIR, public scoping and circulation, and required contents of the EIR. Project Description. BonTerra Psomas will work closely with the City and Project Team members to prepare an in-depth description that articulates the characteristics and overall objectives of the Project. The Project Description will include but not be limited to the Project History; Intended uses of the EIR/Project approvals; EIR focus and effects found not to be significant; Project location; Project characteristics; and Project goals and objectives. Environmental Analysis. Each topical EIR section will contain a discussion of the existing conditions on the site and in the Project vicinity; a summary of the regulatory framework; identification of significant environmental effects anticipated for each environmental issue; and mitigation measures, if required. Thresholds of significance will be stated in each technical section to enable the reader to understand the analytical process used to identify potential Project impacts and, unless otherwise directed by the City, will be taken from the State CEQA Guidelines. For each topical issue, the EIR will identify the level of significance prior to and after mitigation, based on the established thresholds. Establishing a nexus among the Project -specific and cumulative impacts and the suggested mitigation measure(s) is critical. BonTerra Psomas will differentiate among features of the Project (Project Design Features [PDFs]) that serve to partially or completely mitigate potential impacts; City of Newport Beach standard conditions of approval, as applicable; and "conventional" EIR mitigation measures. Project effects that cannot be mitigated to a level considered less than significant will be identified. Alternatives. BonTerra Psomas will provide an assessment of alternatives to the proposed Project. These alternatives will be based on the requirements of CEQA as well as discussions with City staff members and the Project Team. This Scope of Work assumes that up to two development alternatives and a No Project Alternative will be addressed. It is assumed that one of the development alternatives will be the development of the site consistent with the General Plan (i.e., up to 70,000 square feet of General Commercial Office). The second development alternative will be designed to reduce or eliminate, where possible, the impacts identified for the proposed Project. The alternatives will be discussed and further developed through collaboration with the Project Team; however, it is assumed it will be a modification of the design rather than an alternative use. Each alternative will be qualitatively assessed in comparison R:\Projects\NEW\3NEW003100\SOWs\SOW Harbor Pointe EIR-082516.docx A-3 Scope of Work 4-21 Harbor Pointe Senior to the proposed Project; quantitative analysis will be provided if necessary to adequately compare the impacts of the alternatives and the Project. Cumulative Impacts. In addition to the analysis of potential short-term and long-term Project -specific impacts and the analysis of direct and indirect impacts, BonTerra Psomas will conduct a cumulative impact analysis based on the provisions of Section 15130(b)(1) of the State CEQA Guidelines. BonTerra Psomas will work closely with City staff and Project Team members to ensure that appropriate Projects are evaluated. However, to ensure a comprehensive analysis, the regional growth projections, which reflects the adopted General Plan will be utilized. The cumulative assumptions will be identified for each topical issue. Required California Environmental Quality Act Topics. The following CEQA-required sections will be prepared as a part of the EIR: long-term impacts; significant irreversible environmental changes; significant unavoidable adverse impacts; growth -inducing impacts; energy impacts (pursuant to Appendix F of the State CEQA Guidelines); references; and preparers and contributors, agencies, and persons consulted. The Administrative Draft EIR will be submitted electronically to the City for review and comment. BonTerra Psomas will review the comments received from the City on the Administrative Draft EIR and make the necessary revisions to the document. BonTerra Psomas will also be responsible for identifying conflicting comments/direction and ensuring that these issues are resolved. BonTerra Psomas will revise the document and submit a Screencheck Draft to the City for approval prior to public distribution. Task 2.1 Deliverables Electronic copy of the Administrative Draft EIR Task 2.2 Screencheck Draft Environmental Impact Report BonTerra Psomas will review the comments received from the City on the Administrative Draft EIR and make the necessary revisions to the document. BonTerra Psomas will also be responsible for identifying conflicting comments/direction and ensuring that these issues are resolved. BonTerra Psomas will revise the document and submit a Screencheck Draft to the City for approval prior to public distribution. Task 2.2 Deliverables a Electronic copy of the Screencheck Draft EIR Task 2.3 Draft Environmental Impact Report and Distribution for Public Review Upon receipt of comments on the Screencheck Draft EIR, BonTerra Psomas will incorporate additional revisions, as necessary and prepare the Draft EIR. BonTerra Psomas will be responsible for producing and distributing the Draft EIR for a 45 -day public review period, based a distribution list provided by the City, which will include all agencies, interested parties, and members of the public. BonTerra Psomas anticipates 50 CD copies will be distributed, including 15 for the State Clearinghouse. BonTerra Psomas will also prepare a Notice of Completion (NOC) that would be submitted to the State Clearinghouse (SCH) with 15 CDs of the Draft EIR and 15 copies of the SCH electronic submittal form. In addition, BonTerra Psomas will prepare a Notice of Availability (NOA) and mail out copies to property owners within the 300 -foot radius of the Project site. It assumed that the City will be responsible for publishing the NOA in the local newspaper. R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx A-4 Scope of Work 4-22 Harbor Pointe Senior Task 2.3 Deliverables • Electronic copy of the Draft EIR ® Up to 30 CDs of the Draft EIR, including technical appendices, for distribution • Electronic copies of the NOC • Electronic copies of NOA • Distribution of the NOA to property owners (300 -foot radius) • Submittal of the required 15 copies of the NOC and Draft EIR to the State Clearinghouse Task 2.4 Responses to Comments/ Final Environmental Impact Report Following the 45 -day public review period, BonTerra Psomas will review all comments provided to the City from the State Clearinghouse and other parties on the Draft EIR. Based on the comments received, BonTerra Psomas will organize the comments so the Responses to Comments (RTC) effort can be performed in a timely and cost-efficient manner. Following review of the comments received, BonTerra Psomas will coordinate with the City on the approach to preparing the responses. BonTerra Psomas will be responsible for assigning responsibilities to Project Team members for responding to comments; for ensuring that the responses are received; and for incorporating all input from the Project Team into the RTC document. BonTerra Psomas, with assistance from the technical team, will prepare written responses to comments that raise significant environmental issues. The revisions that result from the comments on the Draft EIR will be incorporated into the text of the Draft EIR (Errata). The new and modified text will be underlined, and the deleted text will be stricken -out. Electronic copies of the Draft RTC and the revisions to the Draft EIR will be provided to the City for review. This Scope of Work assumes that BonTerra Psomas will spend approximately 100 hours of professional staff time on this task. If it appears that additional effort will be necessary or if late comment letters are received that raise significant environmental issues, BonTerra Psomas will notify the City and a budget augment may be needed. Upon receipt of comments from the City, BonTerra Psomas will revise the Draft RTC document and prepare the Final EIR; will coordinate with the technical team regarding revisions that are needed; and will provide electronic copies of the Final EIR, including the Draft EIR, RTC, and Errata to the Draft EIR to the City for a final review. BonTerra Psomas will mail responses to public agency comments at least ten days before consideration of certification of the Final EIR, as required by CEQA. Task 2.4 Deliverables a Electronic copies of Draft and Final Responses to Comments a Electronic copy of Final EIR Task 2.5 Findings of Fact and Statement of Overridinu Considerations It is assumed the BonTerra Psomas will prepare the Findings of Fact and Statement of Overriding Considerations (Findings and SOC) for the Project pursuant to Sections 21081 and 21081.6 of the California Public Resources Code and Sections 15091 and 15093 of the State CEQA Guidelines. BonTerra Psomas will coordinate with the City and the Applicant for the identification of benefits of the Project to ensure the SOC reflects the full range of benefits. A draft copy of the Findings and SOC will be submitted to the City for review. Revisions will be made to respond to any comments by the City on the draft document. R:\Projects\NEW\3NEW003100\SOWs\SOW Harbor Pointe EIR-082516.docx A-5 Scope of Work 4-23 Harbor Pointe Senior Task 2.5 Deliverables Electronic copies of the Draft and Final Findings of Fact and Statement of Overriding Considerations. TASK 3 MITIGATION MONITORING AND REPORTING PROGRAM In compliance with Section 21081.6 of the California Public Resources Code, BonTerra Psomas will prepare a Mitigation Monitoring and Reporting Program (MMRP) as part of the Final EIR document and for adoption at the time of the Final EIR. The MMRP will be prepared in matrix format and will provide the timing and responsibility for each mitigation measure. A Draft MMRP will be electronically submitted for review by the City. Upon receipt of comments from the City, BonTerra Psomas will revise the MMRP to address the comments and submit a revised Final MMRP to the City. If the Planning Commission or City Council modifies the Project and/or recommends any additional standard conditions and mitigation measures for the proposed Project, BonTerra Psomas will revise the MMRP. However, substantial modifications are not assumed in the fees for this Project. Task 3 Deliverables ® Electronic copies of Draft and Final MMRP TASK 4 NOTICE OF DETERMINATION BonTerra Psomas will prepare the Notice of Determination (NOD) for the Project, which will be signed by the City upon certification of the EIR and action on the Project. BonTerra Psomas will file the NOD with the County Clerk and the State Clearinghouse. It is assumed that the Applicant will provide BonTerra Psomas with a check for payment of the California Department of Fish and Wildlife filing fees and County Clerk Recorder processing fee at the time the NOD is filed. Task 4 Deliverables go Electronic copy of the NOD for signature a One electronic copy of the NOD stamped as having been filed with the County Clerk TASK 5 PROJECT MANAGEMENT, PROJECT MEETINGS, AND PUBLIC HEARINGS Task 5.1 Proiect Management BonTerra Psomas will be responsible for managing the CEQA process for the City. This includes ongoing coordination with the City and team members to ensure compliance with the Scope of Work and schedule and to ensure that information is disseminated, as necessary. This Scope of Work assumes an approximately 6.5 -month schedule for the EIR after a Notice to Proceed is issued. Task 5.2 Proiect Meetings This task includes attendance at up to three coordination meetings for the EIR with City staff and Project Team members, as necessary. This Scope of Work assumes that the Project Manager and Assistant Project Manager will attend all meetings (three hours each, which includes preparation and travel time). Additional meeting attendance will be billed on a time and materials basis, based on hourly rates and subject to prior approval. R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx A-6 Scope of Work 4-24 Harbor Pointe Senior Living Project Task 5.2 Deliverables a Up to three meetings with the City staff members and the Project Team Task 5.3 Public Hearings BonTerra Psomas will attend up to two public hearings, including Planning Commission and City Council meetings. BonTerra Psomas will be available to make presentations and/or provide advice and input to the City and address questions regarding CEQA; the environmental review process; and the findings of the EIR analyses, as appropriate. The preparation of visual aids and handouts for the public hearings are not included in this Scope of Work. This task assumes public hearings will be attended by the Project Manager. Additional public hearing attendance will be billed on a time -and -materials basis, based on hourly rates and subject to prior approval. Task 5.3 Deliverables Attendance at two public hearings R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx A-% Scope of Work 4-25 Harbor Pointe Senior WORK SCHEDULE HARBOR POINT SENIOR LIVING PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION August 25, 2016 This Scope of Work assumes an approximately 6.5 -month schedule for the EIR after the Notice to Proceed is issued. BonTerra Psomas will work diligently and coordinate closely with the City and Project Team to ensure the EIR is prepared efficiently, on time, and within budget. All time -saving approaches, including use of the existing screencheck IS/MND, will be utilized to speed up the schedule. However, BonTerra Psomas will ensure that time -saving approaches will not jeopardize the quality of the document. The preparation of the NOP and support materials will be initiated upon attendance at the July 12, 2016 meeting with the City and Project Applicant. However, further work on EIR will be at the City's direction; therefore, the following schedule provides estimated durations for each work effort. Prepare NOP - July 12 -duly 15, 2016 City Review of the NOP (1St review) July18 — July 19, 2016 Revise the NOP July 19, 2016 City Review of the NOP (2nd and final review) July 20-21, 2016 Prepare Final NOP for circulation July 21, 2016 NOP 30 -Day Public Review Period July 22 — August 22, 2016 Scoping Meeting August 15, 2016 Task 2: Environmental Impact Report s� Prepare Administrative Draft EIR Week 1-4 City Review of Administrative Draft EIRWeek 5-6 Prepare Screencheck Draft EIR Week 7-8 City Review of Screencheck Draft EIR (2nd and final review) Week 910 Prepare Draft EIR for Reproduction and Distribution Week 11 Draft EIR 45 -day Public Review Period Week 12-19 Prepare RTC Week 20-22 City Review of the RTC ` Week 23-24 '. Prepare Findings of Fact and Statement of Overriding Week 23-24 Considerations Revise RTC and Prepare Final EIR Week 25 26 City Review of the Findings of Fact and Statement of Week 25-26 Overriding Considerations R:\Projects\NEW\3NEW003100\SOWS\SOW Harbor Pointe EIR-082516.docx Work Schedule 4-26 Harbor Pointe Senior Living Project Finalize of the Fin Considerations Task 3: Mitigation Monitoring and Reporting Program City Review of Draft MMRP Week 23-24 Finalize MMRP i f x ry ti z `r` y f` x f,: 2 Week 25-26, . th Submit Final MMRP Week 26 Task 4: Notice of Determination r r Prepare Draft NOD Upon Final EIR Certification City Review of Draft NOD ; '' ` f r t� r 41-0 TBD .. ,Fe Finalize and file NOD ; TBD r Task 5: Project Management, Meetings, and Public Hearings 'A �fi" 11 W E L x, s r x ,, , " . . Project Management Through Project Completion Project Meetings -- Public Hearings (two Planning Commission and two City Council) R:1Projects\NEW\3NEW003100\SOWs\SOW Harbor Pointe EIR-082516.docx Three Meetings (TBD) TBD Work Schedule 4-27 Harbor Pointe Senior Living Project FEE ESTIMATE HARBOR POINT SENIOR LIVING PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION August 25, 2016 Task Description Fee BonTerra Psomas Professional Fees Task 1 Notice of Preparation/Scoping Meeting $4,890.00` Task 2 Environmental Impact Report 2.1 Administrative Draft EIR $31,680.00 2.2 Screencheck Draft EIR $16,780.00 2.3 Draft EIR and Distribution for Public Review $7,460.00 2.4 Response to Comments and Final EIR $19,210.00 3.2 Findings of Facts and Statement of Overriding Considerations $6,220.00 Task 3 Mitigation Monitoring and Reporting Program $2,180.00 Task 4 Notice of Determination $510.00 Task 5 Project Management, Meetings, and Public Hearings 5.1 Project Management $8,360.00 5.2 Project Meetings $3,280.00 5.3 Public Hearings $7,240.00 Subtotal BonTerra Psomas Professional Fees $109,860.00 ESTIMATED DIRECT EXPENSES Traffic Analysis for the Alternatives (Urban Crossroads) $2,500.00 Reproduction $600.00 Mailing $500.00 Mileage $100.00 Miscellaneous $400.00 Subtotal Direct Expenses $4,100.00 TOTAL FEE ESTIMATE TASKS 1-4 $112,110.00 The fees associated with Task 1 are for the scoping meeting. The costs for the NOP were accommodated within the existing budget. Fee Estimate 4-28 Harbor Pointe Senior FEE ASSUMPTIONS FOR THE EIR 1. Modifications to the Project assumptions after the technical analysis has been initiated may require a scope and budget augment. 2. No stand-alone technical documents will be provided for the following analyses: Air Quality Greenhouse Gas Emissions IN Noise 3. Additional review cycles and/or revisions to the EIR may require a budget augment. 4. No Project meetings other than those outlined in this Scope of Work are assumed; additional meetings and/or hearings can be attended on a time and materials basis. 5. Direct costs are based on best available information. Document submittals will be made electronically, except as indicated above. 6. Delays in the schedule after the Project has been initiated may require a budget augment. 7. The additional traffic analysis is a qualitative evaluation of the alternatives and a limited number of hours for responses to comments. No detailed traffic study will be provided. 8. Supporting design concepts for the alternatives will be provided by the applicant. 9. Cross-sections showing the height of the Project in relationship to surrounding uses will be provided by the applicant. Fee Estimate 4-29 Attachment C Project Site Exhibit 4-30 4-31