Loading...
HomeMy WebLinkAboutIV - A Modern Vision for the Harbor - PowerPoint 2Harbor Design Depths and Dredging Needs Compadson of Existing Bathymetry and Authonzed Depth Elevation Range (ft) Calor A.-. Cr Be]ok-y Dredge Depth C'.0 to 1I.0 1.0 to 2..C, 2.0to3.-D 3.0 to 4.,7 4.0 to E.0 and Greater ■ m E-!,Ic oreaging .. ---'may..%•n 1��'?�K r ' Ede _ - .. �'���� ., ..., - ,..-.......... ►ISR;; .� z1 r fONO I�� a r s� ►til . — �;;'`` lm Basic Dredging I Suction Dredge with Direct Beach Disposal Santa Cruz ethods Suction Dredge with Dump Scow - Upper Bay • Actively Pursue a Federal Dredging Project in Lower Harbor to remove approximately 650,000 cy Legacy Material ➢ Necessary Sediment Testing is Underway ➢ Staff/Council/Harbor Commission Engaging Elected Representatives, Army Corps, and Regulatory Agencies ➢ Requesting $400,000 in 2019 Army Corps Budget for Design • Work with County to set aside funds to Dredge County Tidelands ➢ North and South of PCH ➢ Possibly Join the Larger Project Some Thoughts On A Game Plan Addressing Annual Maintenance Dredging (slips, beaches, shoals, etc.) ? Explore Modifying RGP (Nearshore Dredging) to allow Small Quantities of Material Disposal into Channels prior to Large Project *(provided this is agreeable with Corps & Regulatory Agencies) ➢ Permitted for Small Cost Recovery Fee ➢ Larger Dredging Project later Removes Material at Lower Bulk Rate ➢ Reduces Disposal Cost to Residents = More Attractive to Dredge ? Consider Contracting, or Purchase/Operating Small Suction Dredge System for on-going maintenance of Public &maybe Private Areas