Loading...
HomeMy WebLinkAbout10_Garg Duplex Coastal Development Permit_PA2017-224CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT SUBJECT: Garg Duplex (PA2017-224) Coastal Development Permit No. CD2017-097 SITE LOCATION: 506 Clubhouse Avenue APPLICANT: Eric Trabert, Architect OWNER: Sushil Garg PLANNER: Gregg Ramirez, Principal Planner 949- 644-3219, gramirez@newportbeachca.gov GENERAL PLAN/ZONING DISTRICT • General Plan: RT (Two -Unit Residential) • Zoning District: R-2 (Two -Unit Residential) • Coastal Land Use Category: Two -Unit Residential (RT -D) • Coastal Zoning District: R-2 (Two -Unit Residential) PROJECT SUMMARY February 15, 2018 Agenda Item No. 10 Request for approval of a Coastal Development Permit (CDP) to allow the demolition of an existing single-family residence and attached garage and the construction of a new 4,671 square foot, three-story duplex and two attached 2 -car garages totaling 881 square feet. The project also includes hardscape and drainage. The proposed residence complies with all applicable development standards including height, setbacks, and floor area limits. No deviations are requested. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures, because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2017-097 (Attachment No. ZA 1). oami2on 1 Garg Residence CDP Zoning Administrator, February 15, 2018 Page 2 Land Use and Development Standards • The subject property is located in the R-2 Coastal Zoning District, which provides for single or two -unit residential development and is consistent with the City's Coastal Land Use Plan, General Plan and Zoning Code. A Coastal Development Permit is required and the property is not eligible for a Waiver for De Minimis Development because the property is located in the Appeal Area. The property currently consists of one legal lot developed with a single family home and detached garage. The residential neighborhood to the north, south, and west is predominantly developed with two -and three-story, single-family residences and duplexes. Commercial development is located across the alley to the east. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development consistent with applicable development standards. The property is located in an area eligible for a Categorical Exclusion. However, the proposed duplex exceeds the 1.5 floor area limit identified in Categorical Exclusion Order (CEO) CE-5-NPB-16-1. The development otherwise complies with all other applicable CEO limits and standards. Additionally, the proposed residence conforms to all applicable development standards (see below) and height measured from 9.00 feet (North American Vertical Datum of 1988) as the established grade. • The proposed duplex and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. TmpIC 10/10/17 Table t — Development Standards Development Standard Standard Proposed Setbacks min. Front 5 feet 5 feet Sides 4 feet 4 feet Rear 5 feet 5 feet Allowable Floor Area 5,813 square feet 5,641 square feet Allowable 3`d Floor Area 436 square feet 433 square feet Open Space 436 square feet 441 square feet Parking 2 spaces per unit (1 in garage) 2 garage spaces per unit Height 24 feet flat roof 29 feet sloped roof 24 feet flat roof 29 feet sloped roof TmpIC 10/10/17 Garg Residence CDP Zoning Administrator, February 15, 2018 Page 3 ILF.iMOM The property is not located on the shoreline. The finished floor elevation of 9.00 feet North American Vertical Datum (NAVD) complies with the minimum 9 -feet (NAVD) standard. • The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality • The property is located more than 200 feet from the shoreline. Project design addresses water quality with a construction erosion control plan and a post construction drainage system that includes drainage and percolation features to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City's storm drain system. Public Access • The project site is not located between the nearest public road and the sea or shoreline and will not change or affect the public's ability to gain access to, use, and/or view the coast and nearby recreational facilities. The project design complies with setbacks, height limitations, and floor area limitations. • The subject property is not located near a Public View Point or Coastal View Roads, as designated in the Coastal Land Use Plan. Due to the distance of the proposed development from public views, the pattern of surrounding development and, the project's compliance with height and setbacks, the project will not impact coastal views. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The Class 3 exemption includes the construction of limited numbers of new, small structures, including one duplex. The TmpIC 10/10/17 Garg Residence CDP Zoning Administrator, February 15, 2018 Page 4 exemption also allows the demolition of single-family home. The proposed project includes the demolition of one single-family home and the construction of a new duplex. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: Gregg mirez Principal Planner gbr Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans Tmp1C. 10/10/17 .y. Attachment No. ZA 1 Draft Resolution 08/17/2017 RESOLUTION NO. ZA2018-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2017-097 TO DEMOLISH AN EXISTING SINGLE FAMILY RESIDENCE AND CONSTRUCT A NEW DUPLEX AND TWO ATTACHED 2 -CAR GARAGES LOCATED AT 506 CLUBHOUSE AVENUE (PA2017-224) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. An application was filed by Eric Trabert, Architect, with respect to property located at 506 Clubhouse Avenue, requesting approval of a coastal development permit. 2. The lot at 506 Clubhouse Avenue is legally described as Lot 1, Block 532, Canal Section, Northerly Half 34th Street, Abandoned. 3. The applicant is requesting approval of a Coastal Development Permit (CDP) to allow the demolition of an existing duplex and attached garage and the construction of a new 4,671 square foot, three-story duplex and two attached 2 -car garages totaling 881 square feet. The project also includes hardscape and drainage. The project complies with all applicable development standards and no deviations are requested. 4. The subject property is designated RT (Two -Unit Residential) by the General Plan Land Use Element and is located within the R-2 (Two -Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RT -D (Two -Unit Residential Detached) and is located within the R-2 (Two -Unit Residential) Coastal Zone District. 6. A public hearing was held on February 15, 2018, in the Corona del Mar Conference Room (Bay E -1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to and considered by the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303 , Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures, because it has no potential to have a significant effect on the environment. t2 -2t-2017 Zoning Administrator Resolution No. ##1## Paqe 2 of 6 2. Class 3 exempts the construction of limited numbers of new, small structures, including one duplex. The proposed projects consists of the demolition of one single family residence and the construction of a new duplex located in the R-2 Coastal Zoning District. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 5,813 square feet and the proposed floor area is 5,641 square feet. b. The proposed development provides the minimum required setbacks, which are 5 feet along the front property line abutting Clubhouse Avenue, 4 feet along each side property line and 5 feet along the rear property line abutting the alley. C. The highest guardrail is less than 24 feet from established grade (9.00 feet NAVD88) and the highest ridge is no more than 29 feet from established grade, which comply with the maximum height requirements. d. The project includes garage parking for a total of four vehicles, complying with the minimum two -car parking requirement (minimum one space in a garage and one covered space per unit) for duplexes. 2. The neighborhood is predominantly developed with two- and three-story, single-family residences and a commercial building across the alley. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. 3. The property is not located on the shoreline. The finished floor elevation of the proposed dwelling is 9.00 feet North American Vertical Datum of 1988 (NAVD88), which complies with the minimum 9.00 feet (NAVD88) elevation standard. 4. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) iz-zi-zon Zoning Administrator Resolution No. ##1## Paqe 3 of 6 and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 5. The property is not located within 200 feet of the shoreline. The project design addresses water quality with a construction erosion control plan and a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City's storm drain system. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is not located between the nearest public road and the sea or shoreline and will not change or affect the public's ability to gain access to, use, and/or view the coast and nearby recreational facilities. The project design complies with setbacks, height limitations, and floor area limitations. 2. The subject property is not located near a Public View Point or Coastal View Roads, as designated in the Coastal Land Use Plan. Due to the distance of the proposed development from public views, the pattern of surrounding development and, the project's compliance with height and setbacks, the project will not impact coastal views. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2017-097, subject to the conditions set forth in Exhibit "A," which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. 12-21-2017 g Zoning Administrator Resolution No. #### Paqe 4 of 6 PASSED, APPROVED, AND ADOPTED THIS 15TH DAY OF FEBRUARY, 2018. Patrick J. Alford, Zoning Administrator 12-21-2017 9 Zoning Administrator Resolution No. ##1## Paqe 5 of 6 EXHIBIT "A" CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. 3. Best Management Practices (BMPs) and Good Housekeeping Practices (GNPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Pollution Prevention Plan (CPPP). 4. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 5. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 6. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 7. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 8. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 9. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 10. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 12-21-2017 -T Zoning Administrator Resolution No. ##1## Paqe 6 of 6 11. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit "A" shall be incorporated into the Building Division and field sets of plans. 12. Prior to issuance of a building permit, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Coastal Development file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Coastal Development Permit. 13. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 14. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 15. This Coastal Development Permit No. CD2017-097 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 16. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of the Garg Duplex CDP including, but not limited to, Coastal Development Permit No. CD2017-097 (PA2017-224). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 12-21-2017 ss Attachment No. ZA 2 Vicinity Map 08/17/2017 12 Coastal Development Permit No. CD2017-097 PA2017-224 506 Clubhouse Avenue Attachment No. ZA 3 Project Plans 08/17/2017 14 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES Notes must be shown as worded, on the title sheet of the plan I. In the case of emergency, call SUSHIL 6AR6 at Work Phone # or Home Phone q4q 561-7035. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. 5tockplle5 of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facllities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction -related materials, wastes, spills shall be Implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants. 6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated construction staging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed In trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 GFR Parts 117 and 302. q. Potential pollutants Include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent orfloatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporary area on -site, physically separated from potential stormwater runoff, with ultimate disposal In accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion Is prohibited. Dewatering of non -contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautlons to prevent public trespass onto areas where Impounded water creates a hazardous condition. 13. The permittee and contractor shall Inspect the erosion control work and Insure that the work is In accordance wlth the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals Into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made ovallable at all times during the rainy season. Necessary materials shall be avallable on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain Is Imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5 -Day Rain Probability Forecast exceeds 40%. 17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff, vehicle tracking, or wind. 18. Appropriate BMPs for construction -related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff. ::)EFEKKE::� SUBM177A1.5 * FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 15D NOTES: I. DEFERRED 50BMITTAL5 TO BE REVIEWED BY PROJECT ARCHITECT OR ENGINEER OF RECORD 4 GERTIFIED PRIOR TO SUBMITTAL FOR PLAN REVIEW 2. OBTAIN FIRE SPRINKLER PERMIT PRIOR TO GALLING FOR ROOF 5HEATHING INSPECTION. NOTES I. CONSTRUCTION PLANS 4 CALCULATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE 2016 CALIFORNIA BUILDIN6 (G.B.C), 2016 CALIFORNIA RESIDENTIAL (G.R.G), 2016 CALIFORNIA ELECTRICAL (G.E.G), 2016 CALIFORNIA MECHANICAL (G.M.G), 2016 CALIFORNIA PLUMBING (G.P.G) d 2016 CALIFORNIA ENERGY EFFICIENCY STANDARDS CODE (E.E.5) 2016 GAL6REEN GODE5 CHAPTER 15 OF THE NEWPORT BEACH MUNICIPAL CODE (NBMG) 2. MINIMUM BUILDIN6 CODE REQUIREMENT5 FOR GON5TRUGTION IDENTIFIED IN SPECIFIC AREAS ARE TO 13E ADDRESSED FOR SIMILAR CONSTRUCTION IN OTHER AREAS. 3. OBTAIN PLAN REVIEW APPROVAL FROM THE FOLLOWING: a. BUILDIN6 DIVISION - 6RADIN5 b. BUILDING DIV151ON - EMP c. PLANNING DIVISION d. PUBLIC WORK5 DEPARTMENT 4. APPROVED ENCROACHMENT PERMIT 15 REQUIRED FOR ALL WORK ACTIVITIES WITHIN THE PUBLIC R16HT-OF-WAY. 5. SEPARATE PERMIT 15 REQUIRED FOR EACH BUILDING OR STRUCTURE, FENCE WALLS, RETAINING WALLS, INDOOR/OUTDOOR POOLS d SPAS AND BBQ COUNTER AT REAR OR 510EYARD. 6. A PUBLIC WORK5 DEPARTMENT ENGROAGHMENT PERMIT INSPECTION 15 REQUIRED BEFORE THE BUILDIN6 DEPARTMENT PERMIT FINAL GAN BE 155UED. AT THE TIME OF PUBLIC WORK5 DEPARTMENT INSPECTION, IF ANY OF THE EXISTING PUBLIC IMPROVEMENTS 5URROIWIN6 THE 51TE 15 DAMAGED, NEW CONCRETE 51DEWALK, CURB AND GUTTER, AND ALLEY/STREET PAVEMENT WILL BE REQUIRED. ADDITIONALLY, IF EXISTING UTILITIES INFRASTRUCTURE ARE DEEMED SUBSTANDARD, A NEW I-INGH WATER SERVICE, WATER METER BOX, SEWER LATERAL AND/OR GLEANOUT WITH BOX AND LID WILL BE REQUIRED. 100% OF THE COST SHALL BE BORNE BY THE PROPERTY OWfER (MUNIGIPAL CODES 1424.020 AND 14.08.030). SAID DETERMINATION AND THE EXTENT OF THE REPAIR WORK SHALL BE MADE AT THE DISCRETION OF THE PUBLIC WORKS INSPECTOR 1. CITY ENGROAGHMENT AGREEMENT 15 REQUIRED FOR ALL NON-STANDARD PRIVATE IMPROVEMENTS WITHIN THE PUBLIC RIGHT-OF-WAY. 8. BUILDIN6 HEIGHT GERTIFIGATION 15 REQUIRED. q. ALL PERMITS RELATED TO THE PROP05ED PROJECT SHALL BE ISSUED AT THE SAME TIME, OR SEPARATE PLANS d PLAN REVIEW WILL BE REQUIRED FOR ITEMS NOT ISSUED WITH THI5 REVIEW. HOLD ON FINAL THE FOLLOWING HOLD(5) ON FINAL WILL BE APPLIED TO THE BUILDING PERMIT: I. HEIGHT CERTIFICATION OF CRITICAL ROOF HEIGHT ELEVATIONS. 2. LAND50APE CERTIFICATION - FOR PROJECTS REQUIRING LANDSCAPE DOCUMENTATION PAGKA&E, APPLICANT MUST PROVIDE THIRD -PARTY STAMPED AND 516NED CERTIFICATE OF COMPLETION (APPENDIX E OF DE516N 5TANDARD5). \/IGINITY MAP oa,e. ry ealSoa baa ,aa PaNlle Coa , •. AVPQ 9 .z SITE] Sush I f Garg0 806 Cfubhouse,4vell, Newport Beach, CA INDEX OF SHEETS 1.0 2 S 4 5 6 7 8 q 10 11 12 1B 14 15 16 117 15 161 20 21 22 23 24 n1 n2 n4 5UILI::�ING DATA COVER SHEET SITE PLAN FIRST AND SECOND FLOOR PLAN THIRD AND ROOF PLAN EXTERIOR ELEVATIONS BUILDING SEC,7ION5 FLOOR AREA AND OPEN VOLUME CALC1,1LATION5 60VERNIN6 AUTHORITY CITY OF NEWPORT BEACH, GA GOVERNING CODE 2016 G.B.G., 2016 G.R.G., 2016 G.E.G. 2016 G.M.G. 2016 G.P.G. 2016 E.E.S. 2016 GALGREEN AND LOCAL AMENDMENTS OCCUPANCY GROUP R3/U CONSTRUCTION TYPE V -B SPRINKLERED YES / NFPA 15D APN No. 423-101-08 MAX BUILDIN6 HE16HT = 201'-O" FROM FIN. I5T FLR. GI -TY OF NEWPORT BEACH 4 STATE OF CALIFORNIA ADOPTED AMENDMENTS 5UILZ�ING STATISTICS ALLOWABLE BUILDABLE AREA = 26106.50 x 2 = 5813.00 sgft SQUARE EOOTA6E FIRST FLOOR 1666.42 soft SECOND FLOOR 2661.28 sgft THIRD FLOOR 432.78 soft JT TOTAL LIVING 4160.48 sgft GARAGE 880.03 sgft TOTAL STRUCTURAL AREA 5640.51 soft BALCONIES 561.22 sgft COVERED DEGK5 328.80 sgft OPEN DECKS 466.50 sgft OPEN SPACE 15%+ 441.30 sgft LOT STATISTIGS ALLOWABLE BUILDABLE AREA (2,1406.50 x 2) 5813.00 sgft REQUIRED OPEN SPACE (2,0106.50 x 15%) 435.618 sqft SHOWN OPEN SPACE 441.30 sgft ALLOWED MAX. THIRD FLOOR (2,6106.50 x 15%) 435.618 sgft SHOWN THIRD FLOOR 432.78 sgft LEGAL flESCKIPTION LOT I, BLOCK 532, CANAL SECTION NORTHERLY HALF 34TH ST A.P.N.: 423-101-08 VESCwKIPTION OF ^OKK PROPOSED NEW THREE-STORY DUPLEX DWELLING ERIC, TRABERT $ ASSOCIATE5 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.efadesign.com SUSHIL OAR& 506 CLUBHOUSE NEWPORT BEACH, GA 612663 APN 423-101-08 W K O is) DATE 0-7.1e.201-7 STYLE 12-06-I1 I AIG PG -I - JT O DRAWN BY: JT U )OB NO. 01.0-GVR-GLUBHOU5E Z SCALE NOT TO SCALE 1.0 SHEET 0 F 0 2 1212/201? 2:38:27 PM, JT AC NEW EENGE WALL 42" MAX ABOVE EXT6 / NATURAL 6RA1 ------------ I � CF.W. 2.0 GUTTER -II 15.0 F- - NEW EENGE WALL 42" MAX ABOVE EXT6 / NATURAL GRADE C0NC. III -- 10.4 -1'-- 4.3 1 STORY ROOEOE EXTG. EENGE WALL v v v v v Npr2�fH 2 STORY RESIDENCE BUILDING STATISTICS I I I I 1 STORY RESIDENCE 20.5 __--- nlr OWNER SITE NOTES SUSHIL GAR& I. DRIVEWAY SLOPE SHOULD GOMPLY WITH THE COUNTY OF ORANGE ZONING GODE SEG. 7 -q -145.2.e.5. 21621 HIDDEN TRAIL ROAD LA6UNA HILLS, GA c12655 2. SEPARATE PERMIT 15 REQUIRED FOR FENCE WALLS, (q4q) 510-3556 RETAINING WALLS, INDOOR/ OUTDOOR SWIMMING POOLS 4 SPAS. (BLDG. ORDINANGE) .JOB AZ7PRESS 3. TEMPORARY IN6RE55-E6RE55, 5TOGKPILIN6 MATERIALS, LAND5GAPIN6, DRIVE APPROAGHES BRIG TR�tB�RT ASSOCIATES UTILITY INSTALLATION WITHIN PUBLIC, RI6HT 506 CLUBHOUSE AVE. OF WAY REQUIRES AN ENGROAGHMENT PERMIT. NEWPORT BEACH, GA 82663 4. GRG R31q.1 ADDRESS NUMBERS. SALL HAVEADDRESS LEGAL DESCRIPTION NNUMBEIRS, BURL ING NUM ERSROVED OR APPROVED BUILDING IDENTIFIGATION PLACED IN A POSITION THAT IS LOT I, BLOCK 532, PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR GANAL SECTION NORTHERLY HALF 34TH ST O ROAD FRONTING THE PROPERTY. THESE NUMBERS A.P.N.: 423-101-05 SHALL CONTRAST WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE ARABIG NUMBERS OR S.Z7ESCRIPTION OF WORK MINIMUMBEOF 4`INGHESEHIGH WITBH ERS A MINMUMSHALLBSTROKE WIDTH OF 1/2 INCH. WHERE AGGES5 15 BY MEANS OF In PROPOSED NEW THREE-STORY A PRIVATE ROAD AND THE BUILDING ADDRESS DUPLEX DWELLING CANNOT BE VIEWED FROM THE PUBLIC, WAY, A 9521 IRVINE CENTER DRIVE MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE 5TRUGTURE. IRVINE, CALIFORNIA 92618 SITE FOOTAGE NOTE 5. ADDRESS NUMBERS SHALL BE OF NON-GOMBU5TIBLE TEL: 949.861.2244 MATERIALS IN 5PEGIAL FIRE PROTEGTION AREAS, LOT AREA 3,g8q.81 SQ. FT. SHALL BE A MINIMUM 4" HIGH AND ILLUMINATED AT FAX: 949.861.2233 NIGHT. PER OGFA GUIDELINE B-Oq. www.etadesign.com ALLOWABLE BUILDABLE AREA 5,813.00 So. FT. 6. FOOTINGS AT TREE LOGATION5 MUST BE BOARD NOTE: BUILDING FOOTPRINT 4 AREA UNDER FORMED TO ELIMINATE BOIL OVER, AND ALL THE ROOF EAVES 4 SOLID ROOFS ARE EXTRANEOUS GONGRETE MUST BE REMOVED FROM INCLUDED IN THE GALGULATION OF THE THE PROJEGT SITE BUILDING GOVERA6E -7. ALL DOORS FROM HOUSE TO POOL/SPA YARD MUST BE EQUIPPED WITH AN APPROVED DROWNIN6 SUSHIL 6,AR6 PREVENTION DEVICE PER 2016 GRG. 506 GLUBHOUSE 8. BOTH SIDES OF THE PERIMETER WALLS, FENGE5 4 NEWPORT BEACH, GA 92663 PILASTERS MUST BE GOMPLETELY FINISHED PER APN 423-101-08 - - - A55OGIATION DE51ON GUIDELINES. q. ALL SEWER GOLLEGTION SYSTEMS, WATER AND/OR GAS DISTRIBUTION SYSTEMS ARE PUBLIC. 10. EDISON GOMPANY APPROVAL 15 REQUIRED FOR METER LOCATION PRIOR TO INSTALLATION. 11. GATES IN FENGE5 IMPEDING FIREFIGHTER AGGE55 TO THE STRUCTURE SHALL BE PROVIDED WITH A KNOX BOX (OR A KEY SWITGH IF THE GATE 15 ELEGTRIGALLY OPERATED) TO ALLOW AGGE55 TO THE 5TRUGTURE. PER GFG 503.1.1 12. AB5 AND PVC, INSTALLATIONS ARE LIMITED TO �c RESIDENTIAL CONSTRUCTION NOT MORE THAN TWO (2) STORIES IN HEIGHT. 0 13. PROPERTY MARKERS MUST BE VISIBLE AT ALL THE TIME OF INSPEGTION OR SURVEY WILL BE REQUIRED. 14. ALL WALLS, GATES, FENGE5 4 PILASTERS OUTSIDE BUILDING ENVELOPE GANNOT EXGEED 6-0" ABOVE EXISTING NATURAL GRADE. 1 15. THERE SHALL BE NO TRENCHES OR EXCAVATIONS 5 FEET OR MORE IN DEPTH INTO WHIGH A PERSON 15 REQUIRED TO DE5GEND; OR OBTAIN PERMIT FROM STATE OF CALIFORNIA, DIVISION OF OGGUPATIONAL SAFETY AND HEALTH (GAL/OSHA). THIS PERMIT AND 1 ANY OTHER SAFETY PERMIT SHALL BE OBTAINED PRIOR TO GOMMENGE OF ANY WORK. GONTAGT GAL/OSHA AT 714-558-4451 FOR ADDITIONAL INFORMATION. 16. REFER TO GIVIL DRAWINGS FOR EXACT PROPERTY LINE DIMENSIONS, LOGATION(5) OF EXISTING CURB 4 GUTTER, UTILITY EA5EMENT(5), TOPOGRAPHY, PREGISE GRADING PLAN, EROSION CONTROL PLAN, TOP OF WALL HEIGHTS, PAD 4 FLOOR ELEVATIONS, SITE 1 DRAINAGE, LOGATION(5) OF BAGKWATER VALVES, LOGATION 4 DIRECTION OF FLOW OF THE STORM 4 10 SAF SEWER GONNEGTIONS, LOGATION OF NATURAL GAS 4 0 WATER METERS, ETC. 1 17. REFER TO 5TRUGTURAL DRAWINGS FOR ALL (if any) SITE RETAINING WALL INFORMATION 1 18. GENPREEGONTRAGTORRAL M EING WI HHT 6RADHE GITY INSPECTOR, A I ARGHITEGT, 6EOTEGHNIGAL ENGINEER, GIVIL ENGINEER 4 GRADING GONTRAGTOR AT THE 51TE PRIOR TO THE START OF GRADING. -0 Iq. ALL NEW BUILDINGS SHALL BE SOLAR 4 EV READY PER 2016 CALOREEN CODE. n PROVIDE 2" CONDUIT FROM ELEGTRIGAL SERVICE TO aa- IROOF. tu 20. ALL WOOD FRAMING MEMBERS THAT REST ON GONGRETE OR MASONRY EXTERIOR FOUNDATION WALLS 4 ARE LE55 THAN 8" TO THE EXPOSED _ ^ GROUND SHALL BE PRESSURE TREATED OR v , NATURALLY DURABLE TO DECAY. (GRG 8317.1, ITEM 2) GONG.. 1 21. SILLS 4 SLEEPERS IN DIBEGT GONTAGT WITH DRIVEINA.YJ CONCRETE OR MASONRY THAT 15 IN DIRECT CONTACT WITH THE GROUND 4 GIRDERS WITH LESS THAN GLEARANGE TO MASONRY 4 CONCRETE SHALL BE oF0 PRESSURE TREATED OR NATURALLY DURABLE TO > 1 DECAY. (GRG 8317.1, 3 4 4). DATE 0�.18.2on �F 22. FIELD -GUTTING ENDS, NOTCHES 4 DRILLED HOLES OF co PRESERVATIVE -TREATED WOOD SHALL BE TREATED 1 IN THE FIELD IN AGGORDANGE WITH AWPA M4. (GRG APPROVED: - - 8317.1.1) 12-06-17 � 0o. 23. THERE SHALL BE POOL/SPA SAFETY WALLS AND REVISIONS A10 PG -I - JT GATES AROUND THE PROPERTY. WALLS SHALL BE O . � 5-0" H16H MINIMUM AND GATES SHALL BE 5' HI6H 5ELF-GLOSIN6 AND SELF-LATCHIN6 SWINGING N OUTWARD. 24. JOINTS 4 OTHER OPENIN65 IN THE BUILDING J. �. ENVELOPE THAT ARE POTENTIAL 5OURGE5 OF AIR I zo LEAKAGE SHALL BE CAULKED, 6ASKETED, . O WEATHER5TRIPPED, OR OTHERWISE SEALED TO LIMIT GONG.:... 00 INFILTRATION 4 EXFILTRATION (2016 BEES SEG. 110.7) DRIVEWAY 25. AN APPROVED AUTOMATIC, FIRE SPRINKLER SYSTEM 15 REQUIRED FOR ALL NEW GONSTRUGTION 4 REGON5TRUGT 5TRUGTURE5. AGCE55ORY 5TRUGTURE5 5UGH AS PATIO GOVER5, STORAGE SHEDS, BRIDGES, DECKS, GARPORTS, GREENHOUSES OR SIMILAR 5TRUGTURE5 ARE EXEMPT FROM THE REQUIREMENTS 1 OF THI5 5EGTION. { REFERENCE NOTES I •I 4.7 -O O I. REFER TO 6RADIN6 PLAN FOR ALL PREGISE GRADE REFERENGES 4 SPECIFIC, ELEVATION GALL -OUTS 4 PROPERTY LINE TOP OF WALL ELEVATIONS. 2. REFER TO LANDSGAPE PLANS FOR ALL WALL 4 HARDSGAPE DIMENSIONS, MATERIALS 4 COLORS. 3. REFER TO LANDSGAPE PLANS FOR PLANT MATERIAL, PLANT CONTAINER SIZE, AND PREGISE LOCATIONS. FIRE SPRINKLER NOTES I. PROVIDE HOME FIRE SPRINKLER SYSTEM PER NFPA 13d. GONTRAGTOR SHALL SUBMIT PLANS 4 SPEGIFIGATIONS PRIOR TO INSTALLATION. 2, OBTAIN FIRE SPRINKLER PERMIT PRIOR TO GALLING FOR ROOF SHEATHING INSPECTION. 5F` DEFERRED SUBMITTAL TO BE GERTIFIED BY PROJECT DESIGNER PRIOR TO SUBMITTAL. STYLE X O DRAWN BY: JT V JOB NO. 02-5P-GLUBHOU5E N X SCALE NOT TO 5GALE SHEET O �� 1/24/2018 2:53:39 PM, JT - -- -- -- -- -- -- -- -- -- -- -- -- -- --� PROPERWLINE ---------------------------- ------- I I lim q r 5A' FRONT SETBACK A I I O i MASTER BA H — J 71 WG LAV LAV - BAL. II I MASTER BEDROOM ° 15'-0" I I FAu ut-1 PLAN 2 I I MASTER BEDROOM LAV LAV WG MASTER BATH I L --- J Lu O oaj0 NWA N w.l.c. Ili �/ Ln U wG 5'-O" TH IW.I.G. - nATH 3 EAR -- SETBACK TUB USHOWER LoV 1 4'-s" 1 _________________J L------------------------------------------------------------- ---------- ------------------------------- V pQ m A 5'-3 I/2" 7 N W N ------------------------------------------PROPERTI'�INE -- ----- - SEG®NI7 FLOOR PLAN A B 8 8 2,661.25 5Q.FT. 5-4" 74'-8" 20'-4" 4'-2" I I'-e" -----------------------------� PROPERTY LINE ----------------------- ---- I I I I v WJ Q LOCATION I It N � � FOR FUTURBUFETEL/Lu ' N ELEGTRIG O OU 200 .4MP° ��E - - - - I REFR16. �� SIC LAV I — O _ O .I SPADE � 11 I 0sF w I O D 9 -6 l I N 8 TH 5 oo J No 1 FAMILY ROOMP/w 9'-O" GL6 1 I � F.F.: 9.00 = 1--- KITCHEN 1 j F.F.: 9.00 O� _ 01 PLAN 1 I 11 - UPF-1 1 m N II 1 1 11(91-0111�I GgATII PANTRY GARAGE 1 35'-O" L 1 i 551-011 8 GdATII GARAGE O O f—I��----- -- -- -- -- -- I --I I up , p I I 1 1 PLAN 2 J 1 I D Lsw O 11 I �..w' 11 D 9'-O" GL6 FRONT SETBACK I 9'-O" GLG 1 - - -- KITCHEN 00 1 0 FAM I LY ROOM J p/w F.F.: 9.00 � i I F.F.: 9.00 DINING , „ � , � " F - -- l I LAU. R OM F.F.o I 5'-0" 1 1 F.F.: 8.38 _ L — — J REAR L I O REFRi6 I' ° I - W I SETBACK r —- . X X- O LAV SPACE - - -li -I - ____—eer�c— zee w ------------ ---------------- FOR FUTURE GROUND GABLE SOLFlR TV BOX _ W V ELEGTRIG O Qm I � N W - N L--------------------------- ---------------- ----- -Q------I----Q----I------------------- 1 PROPERTY LINE ---------- - -- FIRST 1 L®®K FLAN 1(>8 1,66(b.42 5Q.FT. ERIC TRABERT I$ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL 6,AR6 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 DATE 0-7.16.201-7 APPROVED: 12-06-17 REVISIONS ZjAIC Pr --I - JT STYLE X O DRAWN BY: JT V JOB NO. 05-IFP-2FP-GLUBHOU5E X SCALE 1/4"= 1'-0" SHEET � 1:2/12/201-72:55:01 PM, JT - -- -- -- -- -- -- -- -- -- -- -- -- -- --� PROPERWLINE -- ---------------------------- v v <4 o N I Y N� Lu N - 7------------I�-----1----- -- --. _ N -----L------ L- I I I I I I I I I ' I lim 5A' FRONT SETBACK A I --------=----- ---= ---- D I LF LS -------------- ---- � 211 to --------' C-- RID6E 1 I BUILT-UP ROOF I I 211 II (GLASS A) 1 I 5:12 yy I N 1 m 1 m F-1 CRICKET 1 II L - 1 n 1 L-----�--------- ---1 r-- r CRICKET 11 �------ - -II -----------------------= 11 1 1 J------- J L I I I II � I III m it m III 1 1 1 I I I I rJ L------iL---------L---1---JL-----JL-------------------------------JL-------J�-------------J-1---------L-------------- L - - - - - -- 2„ ---=BUJLT_UJ'RQOF =--- _ - _BU1LT_UPRQOF= I -----1-------------- RID6E--------------- --------------------- RI06E - _---- ---------- T----------------------------------------------I------------------___---_______________-____-= ------(GLASS-A)----- --I--(GLASS A�- 1 ----------------------------- - - - - - - - - - - - - --------------- 1 1 1 1 1 1 u 1 5:12 e I I I 1 I I N I I N 1 I I j II L 1 JL JL---- --------- 1 --------- 1 r---- L u L I 1 BUILT-UP ROOF (GLASS A) N I m N 5:12 I m 2" RIDGE , I I I I r N I 0 d7 5 -0 REAR �R--------------- -- —� 211 I SETBACK -i------------------------ ------ ---- 41 L L ] C - - - - - - - - - - - m L C J L- - - - - ] L- - - - - - - - J - - - - N - - - - - - - - - - - - - 77 - - - - - - - - - - - - - - - ------------ - J - - - - - - - - - - - 4'-5'---"----- ---J 1 - - - - --------- N � - ' Qm I v - w 7 N W N ------------ A B 8 8 ROOF PLAN 1 I<Vr LRI l LIIV� TH I RP FLOOR PLAN 432.78 SO.FT. ERIC TRABSRT $ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL GARS 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 DATE 0-7.16.201-7 APPROVED: 12-06-17 REVISIONS 1 AIG PG -1 - JT STYLE X DRAWN BY: JT H V JOB NO. O6-3FP-RP-CLUBHOU5E X SCALE 1/4"= 1'-0" SHEET � 12/12/2011 5:02:20 PM, JT MAX. ROOF HT. 38.00 _ _ _ _ _ _ _ T.P. 36.1-7 20' MIN - 3RD STORY FRONT SETBACK - - - - - - - - - - - - - - - - - - - - - - - - - - O i r 5'-4" --------------------- J LJ L L I I I I I I 34'-8" 20' MIN - 3RD STORY REAR SETBACK - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - G Ell LuT- z Q J m m 5'_O" REAR SETBACK 0 — N — Q VENT ° — - iu--I - 4 I I MAX. ROOF HT. 38.00 12 �3 T.P. 36.17_ 6-011 6-011 SIDE SETBACK SIDE SETBACK o 3RD STORY - - - - - 3RD STORY - - O i II II II II II II �I III II I II 2 II Iii 4'-O" SIDE SETBACK X F.F. 28.33 DRAWN BY: JT 1 = T.P. 21.42 I H I JOB NO. Ol-ELE-CLUBHOUSE I x z SCALE O 07 SHEET � _ z z 12/12/2011 3:03:34 PM, JT Q N � � X i O v v N N Z F.F. 18.92 JI T.P. 18.00u 0. 1 ai 1 1 O I v 1 1 I I 1 F.F. 9.00 --------------------- J LJ L L I I I I I I 34'-8" 20' MIN - 3RD STORY REAR SETBACK - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - G Ell LuT- z Q J m m 5'_O" REAR SETBACK 0 — N — Q VENT ° — - iu--I - 4 I I MAX. ROOF HT. 38.00 12 �3 T.P. 36.17_ 6-011 6-011 SIDE SETBACK SIDE SETBACK o 3RD STORY - - - - - 3RD STORY - - O i II II II II II II �I III II I II 2 II Iii 4'-O" SIDE SETBACK I r REAR ELEVATION l T.P. 21.42 4'-O" SIDE SETBACK I ID F.F. 18.92_ 1 I � T.P. 18.00 ° X ��a.a DRAWN BY: JT 1 = I r REAR ELEVATION l T.P. 21.42 4'-O" SIDE SETBACK I ID F.F. 18.92_ 1 I � T.P. 18.00 ° X DRAWN BY: JT 1 = I I JOB NO. Ol-ELE-CLUBHOUSE I I — I — I- O.F. 6.50_ I SIPE ELEVATION I MAX. ROOF HT. 38.00_ 12 I �9 T.P. 36.17 - - -n57 - - - - i - - - - - - - El]I I L- O � I I i II III III II II III III II I I li it I I li it I I I I I I I I I I I I I II III III II II III III II 6'-O" II III III II I II III III II 6'-O" II III III II II III III II SIDE S ST GK I I I I I I I I I I I I I I I I I I I I SID SETBACK II III III II II III III II ®3RD STORY i �-----� i �-----� i�----- � i I i �-----� i �-----� i �-----� i a RD STORY T.P. 21.42_ i0 4'-0" I 4'-0" � $ SIDE SIDE lb O SETBACK FFIREF?LAG SETBACK Lu 0 p VENT, O z 0 I� N IO c0 J N F li li i li OI � N N O N LILT IW N ZZ I i I Z F.F. 18.92 T.P. 18.00_ – – – – – – T – – – – – – – < IKI I I(Y <} 1 1 I , I 1 1 I F.F. 9.00 FRONT ELEVATION HEIGHT CERTIFICATION INSPECTION REQUIREMENT IF AN INSPECTION IS REQUIRED, THE PLANNER SHALL PLACE A NOTICE IN PERMIT PLUS 50 THE INSPECTOR KNOWS A HEIGHT CERTIFICATION INSPECTION IS REQUIRED. ERIC TRABERT $ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL GARG 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 d) z ci tu tu DATE o1.I8.2on APPROVED: 12-06-I1 REVISIONS I AIG PG -I - JT STYLE X DRAWN BY: JT H V JOB NO. Ol-ELE-CLUBHOUSE z SCALE 1/4"= 1'-0" 07 SHEET � O 12/12/2011 3:03:34 PM, JT 1 GOVERED OUTDOOR Lu N 11 BAL. MASTER BEDROOM" MASTER BATH MAX. ROOF HT. 38.00 T.P. 36.17_ F.F. 18.92_ :}1 DRAWN BY: JT H 20' MIN - 3RD STORY FRONT 5ETBAGK T.P. 18.00 O -- - - - - - - - - - - - - - - - - - - - - - - - - X T5�-4" 1/4"= 1'-0" SHEET � FRONT 0 (31 aI F N ETBAGK 12/12/201-7:2:25:00 PM, JT F.F. 28.33 FLAT ROOF DECK T.P. 27.42 _ H Lu F 2 lb O z = N m i0 J m o Q i 1 GOVERED OUTDOOR Lu N 11 BAL. MASTER BEDROOM" MASTER BATH I O r F.F. W.I.G. MAX. ROOF HT. 38.00 T.P. 36.17 34'-8" 20' MIN - 3RD STORY REAR SETBACK -------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ O r DEN BONUS ROOM ILI] DECK 0 BATH 2 BEDROOM 2 DINING KITCHEN BATH 5 SECTION - P MAX. ROOF HT. 38.00 LAUNDRY F.F. 28.33 _ T.P. 27.42 El BATH 5 F.F. 18.92: L _ T.P. 18.00 _ _ I _I I _ _ 6_F. 6.50 _ I I SECTION - 8 :m I 0 r HEIGHT CERTIFICATION INSPECTION REQUIREMENT IF AN INSPECTION 15 REOUIRED, THE PLANNER SHALL PLACE A NOTICE IN PERMIT PLUS 50 THE INSPECTOR KNOWS A HEI6HT CERTIFICATION INSPECTION 15 REQUIRED. I SECTION - A ERIC TRABERT $ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL GARG 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 DATE 07.18.2017 APPROVED: 12-06-17 REVISIONS 1 AIG PG -I - JT STYLE F.F. 18.92_ :}1 DRAWN BY: JT H T.P. 18.00 JOB NO. O7-5EG-0LUBHOU5E X SCALE 1/4"= 1'-0" SHEET � 0 (31 aI F N 12/12/201-7:2:25:00 PM, JT I O r F.F. W.I.G. MAX. ROOF HT. 38.00 T.P. 36.17 34'-8" 20' MIN - 3RD STORY REAR SETBACK -------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ O r DEN BONUS ROOM ILI] DECK 0 BATH 2 BEDROOM 2 DINING KITCHEN BATH 5 SECTION - P MAX. ROOF HT. 38.00 LAUNDRY F.F. 28.33 _ T.P. 27.42 El BATH 5 F.F. 18.92: L _ T.P. 18.00 _ _ I _I I _ _ 6_F. 6.50 _ I I SECTION - 8 :m I 0 r HEIGHT CERTIFICATION INSPECTION REQUIREMENT IF AN INSPECTION 15 REOUIRED, THE PLANNER SHALL PLACE A NOTICE IN PERMIT PLUS 50 THE INSPECTOR KNOWS A HEI6HT CERTIFICATION INSPECTION 15 REQUIRED. I SECTION - A ERIC TRABERT $ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL GARG 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 DATE 07.18.2017 APPROVED: 12-06-17 REVISIONS 1 AIG PG -I - JT STYLE X DRAWN BY: JT H V JOB NO. O7-5EG-0LUBHOU5E X SCALE 1/4"= 1'-0" SHEET � 0 �� 12/12/201-7:2:25:00 PM, JT 29.61 50. FT 29.61 50. FT F____________________________________________ -- --------------------- F---------------------- II II El II 65.50 S0. FT. / 164.40 50. FT. I I ----------- ----- � rrT-rrTT-rTT-rr I L__________________ I I T I I I I I I I I I IL --,-T � 'I L 'Il 'Il 'Il II I I I I I I I I 1-1 I I I I I I I I L r______________________ I I I f ------ Ti-rTi-rTT-1-T i -i V J-1_______________1 I I I fLl I I I I I I I I I I I I L ----_J_L1J_L1J=L1J_Ll �� h 65.50 SQ. FT. 164.40 50. FT. j i II - - - s Lx_________________________________________________________________ THIRD FLOOR ---------------- I ------------- SEGOND FLOOR 50. FT. x 10'-4" 50. FT. LIVING AREA SQUARE FOOTAGE FIRST FLOOR FIRST FLOOR (Soft) SEGOND FLOOR (Soft) THIRD FLOOR (Soft) THIRD FLOOR 432.18 sgft JT Oi 1361.00 SQ. FT. 2606.61 SQ. FT. 432.78 SQ. FT. 0 137.71 SQ. FT. 51.67 SQ. FT. TOTAL STRUGTURAL AREA O 137.71 SQ. FT. BALGONIES 56.22 5gft COVERED DECKS 328.80 5gft OPEN DECKS 466.50 sgft TOTAL = 1666.42 50. FT. TOTAL = 2661.28 50. FT. TOTAL = 432.78 50. FT. 91.E 50. ROOF BUILDING GOVERA6E FIRST FLOOR LEGEND / LIVING AREA 6ARA&E BALGONY OPEN DECKS GOVERED DECKS OPEN SPACE BUILDING GOVERA6E BUIL=7INS STATISTICS ALLOWABLE BUILDABLE AREA = 2606.50 x 2 = 5813.00 5gft SQUARE FOOTAGE FIRST FLOOR 1666.42 5gft SEGOND FLOOR 2661.28 sgft THIRD FLOOR 432.18 sgft JT H TOTAL LIVING 4-760.48 5gft GARAGE 880.03 5gft TOTAL STRUGTURAL AREA 5640.51 5gft BALGONIES 56.22 5gft COVERED DECKS 328.80 5gft OPEN DECKS 466.50 sgft OPEN SPAGE 1595+ 441.30 soft LOT STATISTIGS ALLOWABLE BUILDABLE AREA (2,606.50 x 2) 5813.00 sgft REQUIRED OPEN SPAGE (2,606.50 x 15%) 435.68 sgft SHOWN OPEN SPAGE 441.30 5gft ALLOWED MAX. THIRD FLOOR (2,606.50 x 15%) 435.68 scLft SHOWN THIRD FLOOR 432.18 sclft ERIC TRABERT $ ASSOCIATES 9521 IRVINE CENTER DRIVE IRVINE, CALIFORNIA 92618 TEL: 949.861.2244 FAX: 949.861.2233 www.etadesign.com SUSHIL 6AR6 506 CLUBHOUSE NEWPORT BEACH, GA 92663 APN 423-101-08 tu 0 z 111 0- C3 DATE 0-7.16.201-7 APPROVED: REVISIONS STYLE X DRAWN BY: JT H v JOB NO. 09-FAR-CLUBHOU5E X SCALE SHEET � O z �� 12/12/2011 2:32:29 FK JT LL- V) LV) o 0 SEGTION AI I S W b" 2j 1 TORY RECIDENCE 08.70 i6 2 6.80 INV 51W 0� r . eo4' I QI II U 4 1 ❑ o 00 to Q 2% ❑ os lin- - 10.1 ElIlli ❑ u TW l II Al TW \� II -II ti II IIrvC CHECKER: R. DEMA-ALA PROJECT -No: ❑I REVISIONS e ❑I II I e STATUS: SUBMITTAL I '� oI FIR5T FLR 9.00 TOS 8.08 PAD SEE NOTE 5 rz ILL LJ c rH INV (SEE NOTE b) TW U TW 0.1 b on TW �13 615 IN CONI G - l4S 8.66 TGI 6.40 INV 6.55 moo: --- 90 00 __90,00 r PLAN SCALE: 1/8"=1'-O" 2 STORY RESIDENCE N n 0 115 W 0 H79°1 58"W 90,00' IT CNC 1% ,RO __ AII -1 4 8.61 TG 6.851N 2 I STORY RE-=ENCE 2056 RIDGE COW 11 d .n 39 10% _ 12 o 0 SECTION A 21 g45r 10 % e" cc) 26 n v AT CU e ri m SNI QF 10% 0 4� z4 r 8— TO 8.65 G TOO INV 2 O h�A� 1.151t�V 57 s. 4i ,4 I� b� Ib4 11 CONSTRUCTION NOTES: ON SITE: 0 INSTALL 12" 50 CATCH BASIN PER NDS 1200 WITH GRATE OR CITY APPROVED EQUAL. O INSTALL b" 5OUARE GRATE 8 ADAPTER, NDS 640 OR EQUAL. O NOT USED O INSTALL 4" DRAIN PIPE, 51?R 35 PVC OR EQUAL. OGONNEGT ROOF 00104145POUT TIED DIRECTLY TO 51TE DRAINAGE PIPING A5 PER SOILS REPORT 5 RECOMMENDATIONS. I CONSTRUCT 5" GONG. FLATHORK ON GRADE PER SOILS REPORT RECOMMENDATIONS. PROVIDE DRAINAGE SHALE ON CONCRETE FLATHORK (5=0.5%). 12 CON5TRU(T 5" THICK DRIVEWAY BASE PER SOILS REPORT RECOMMENDATIONS- DRIVEHAY PROFILE TO CONFORM TO PER CITY 5TD-I60-L-G (TYPE B). 3 NEW 51DE PROPERTY LINE HALL (MAX Ill ABV N.G.) EXTERIOR FIN15H AND TREATMENT PER ARCHITECTURAL PLAN AND DETAILS. 4 NEW FRONT YARD 51TE HALL (MAX 4'-b" ABV N.GJ WITHIN SETBACK EXTERIOR FIN15H AND TREATMENT PER ARCHITECTURAL PLAN AND DETAILS. 21 REMOVE ALL EXI5TING LANDSCAPE ELEMENTS (HALL, BRICK STEPS ETC.) 22 EXISTING PROPERTY LINE HALL -PROTECT-IN-PLACE 2g EXISTING CONCRETE SIDEWALK - PROTEGT-IN-PLACE 24 NOT USED OREPAIR EXISTING DAMAGED CURB, GUTTER AND 51DEMLK PER CITY STANDARD 5TD5 25 180-L 8 182-L. SEE GENERAL NOTE l 26 REMOVE EXISTING DAMAGED PAVEMENT IN ALLEY AND RECONSTRUCT ALLEY PER CITY STANDARD 5TD 140-L. SEE GENERAL NOTE l OEXISTING WATER METER SERVICE BE GAPPED AT MAIN WITH CORPORATION STOP. 21 REMOVE EXISTING METER BOX AND (OVER[ REMOVE AND RE -INSTALL NEW 6A5 METER ON PRIVATE PROPERTY PER SOUTHERN 28 CALIFORNIA GAS COMPANY STANDARDS 2q REMOVE EXISTING 5EHER CLEANOUT AND (OVER 31 INSTALL NEW 4" SEWER LATERAL AND CLEANOUT PER CITY OF NEWPORT BEACH STANDARD DRAWING 5TD-406-1. WITH TRAFFIC BOX AND LID. 32 GON5TRU(T NEW HATER METER AND SERVILE LATERAL PER CITY OF NEWPORT BEACH STANDARD DRAWING 5TD-502-L 33 CONSTRUCT NEW 3" PVC PRIVATE CURB DRAIN PER CITY OF NEWPORT BEACH 5TAN12ARD DETAIL 184-L O 8 16 24 171110d, GRAFHIG 5C ALE: 1/5"= 1'-0" PLANS PREPARED BY: 4401104 d'zn engineering 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 TEL: (949) 305-8920 CLIENT: Su5hil s Lorene Garg Sushil & Lorene Garg 27621 Hidden Trail Road Loguno Hills, CA 92653 SHEET TITLE V 7— tu H tu ltu v LU PROJECT -ADDRESS 506 Clubhouse Ave, Newport Beach, CA 92663 BENCHMARK Lot XX, Tract 532 BASIS OF BEARINGS: APN: 423-101-08 THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: EXP. tv DATE: 08 -JAN -2018 ENGINEER: R. DEMA-ALA CHECKER: R. DEMA-ALA PROJECT -No: 1739 REVISIONS e e e STATUS: SUBMITTAL I SHEET G-2.1 2 OF r SHEETS CF.W. 2.0 I -e I O a 16 24 GRAl"HIG e(:,ALE: 1/8"= 1'-0" EROSION CONTROL NOTES: INSTALL TEMPORARY EROSION CONTROL - GRAVEL BA65 - 2 HIGH 5E-6 BMP INSTALL TEMPORARY CONCRETE 1NA5H OUT BASIN WITH PLASTIC LINER - NM -5 BMP F3 STREET SWEEPING AND VACUUMING A5 REQUIRED - 5E-1 R4 INSTALL STOCKPILE MANAGEMENT - NM -3 F5 INSTALL 5ANITARY/5EPTIC YNA5TE MANAGEMENT - NM -9 PR4I SEASON REQUIREMENTS (MAY -SEPTEMBER) 1. WIND EROSION BMPS (DUST CONTROL) SHAL BE IMPLEMENTED. 2. SEDIMENT CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED AT ALL OPERATIONAL STORM DRAIN INLETS. 3. BMPS TO CONTROL OFF-SITE SEDIMENT TRACKING SHALL BE IMPLEMENTED AND MAINTAINED. 4. APPROPRIATE WA5TE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMP5 SHALL BE IMPLEMENTED TO PREVENT THE CONTAMINATION OF STORM WATER BY WASTES AND CONSTRUCTION MATERIALS. 5. APPROPRIATE NON -STORM WATER BMPS SHALL BE IMPLEMENTED TO PREVENT THE CONTAMINATION OF STORM WATER FROM CONSTRUCTION ACTIVITIES. 6. THERE SHALL BE A "WEATHER TRIGGERED" ACTION PLAN AND THE ABILITY TO DEPLOY STANDBY SEDIMENT CONTROL BMPS AS NEEDED TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM 15 DEFINED A5 A FORECASTED, 50010 CHANGE OF RAIN). 1. SUFFICIENT MATERIALS NEEDED TO INSTALL STANDBY SEDIMENT CONTROL BMP5 (AT THE SITE PERIMETER, SITE SLOPES AND OPERATIONAL INLETS WITHIN THE SITE) NECESSARY TO PREVENT SEDIMENT DISCHARGES FROM EXPOSED PORTIONS OF THE SITE SHALL BE STORED ON SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS AS DE5GRIBED IN ITEM H ARE NOT GON51DERED TO BE "EXPOSED" FOR PURPOSES OF THI5 REQUIREMENT. 8. DEPLOYMENT OF PERMANENT EROSION CONTROL BMP5 (PHYSICAL OR VEGETATION) SHOULD GOMMENGE AS 50ON AS PRACTICAL ON SLOPES THAT ARE COMPLETED FOR ANY PORTION OF THE SITE. STANDBY BMP MATERIALS SHOULD NOT BE RELIED UPON TO PREVENT ER05ION OF 5LOPE5 THAT HAVE BEEN COMPLETED. ^ET SEASON REQUIREMENTS (OCTOBER -APRIL) 1. WHERE APPROPRIATE SEDIMENT CONTROL BMPS SHALL BE IMPLEMENTED AT THE 51TE PERIMETER, AT ALL OPERATIONAL STORM DRAIN INLETS, AND AT ALL NON-AGTIVE SLOPES, TO PROVIDE SUFFICIENT PROTECTION FOR STORMS LIKELY TO OCCUR DURING THE RAINY SEASON. 2. ADEQUATE PHYSICAL OR VEGETATION EROSION CONTROL BMPS (TEMPORARY OR PERMANENT) SHALL BE INSTALLED AND ESTABLISHED FOR ALL COMPLETED SLOPES PRIOR TO THE START OF THE RAINY SEASON. THESE 13MP5 MUST BE MAINTAINED THROUGHOUT THE RAINY SEASON. IF A 5LEGTED BMPS FAILS, IT MUST BE REPAIRED AND IMPROVED, OR REPLACED WITH AN AGGEPTABLE ALTERNATE A5 50ON AS IT 15 SAFE TO DO 50. THE FAILURE OF A BMP MAY INDICATE THAT THE BMP, AS INSTALLED, WA5 NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS U5ED. REPAIRS OR REPLACEMENTS MUST RESULT IN A MORE ROBUST BMP, OR ADDITIONAL BMPS SHOULD BE INSTALLED TO PROVIDE ADEQUATE PROTECTION. 3. THE AMOUNT OF EXPOSED SOIL ALLOWED AT ONE TIME SHAL NOT EXCEED THAT WHIGH CAN BE ADEQUATELY PROTECTED BY DEPLOYING STANDBY EROSION CONTROL AND SEDIMENT CONTROL BMP5 PRIORT TO A PREDICTED RAINSTORM. 4. A DISTURBED AREA THAT 15 NOT COMPLETED BY THAT 15 NOT BEING ACTIVELY GRADED (NON-AGTIVE AREA) SHALL BE FULLY PROTECTED FROM EROSION WITH TEMPORARY OR PERMANENT BMPS (EROSION AND SEDIMENT CONTROL). THE ABILITY TO DEPLOY STANDBY BMP MATERIALS 15 NOT SUFFICIENT FOR THESE AREAS. EROSION AND SEDIMENT CONTROL BMPS MUST ACTUALLY BE DEPLOYED. THI5 INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, AND SLOPES. 5. SUFFICIENT MATERIALS NEEDED TO INSTALL STANDBY EROSION AND SEDIMENTS BMPS NEGE55ARY TO COMPLETELY PROTECT THE EXP05EP PORTIONS OF THE SITE FROM ER05ION AND TO PREVENT 5DEIMENT DISCHARGES SHALL BE STORED ON-SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PERMANENT PHYSICAL STABLILZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURP05ES OF THI5 REQUIREMENT. Y -s.a (�RAVFI (5F-(,) SECTION A -A NOT TO 5CAL MIN. LATH AND FLAGGING ON ALL 51DE5-N\�-o 0 O O O 0 0 PLAN NOT TO SCALE TYPE "BELOW GRADE" LTJ GRAVEL (5E-6) 0 10 MIL. PLASTIC Q LINING CONCRETE WASTE MANAGEMENT (BMP -WIN -B) N.T.5. N.P.7.E.S. NOTES: 1. IN CASE OF EMERGENCY, GALL 5U5HIL GAR* AT OFFICE PHONE a (949) 510-3556 2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON 51TE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE. 3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE 51TE TO STREETS. DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TACKING, OR WIND. 4. APPROPRIATE BMP'S FOR CONSTRUCTION -RELATED MATERIALS, WA5TE5, AND SPILLS, SHALL BE IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTIES BY WIND OR RUNOFF. 5. RUNOFF FROM EQUIPMENT AND VEHICLE WA5HING SHALL BE CONTAINED AT CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS. 6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PER50NNEL ARE TO BE MADE AWARE OF THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING MEASURES FOR THE PROJECT SITES AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS. T. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND 1NA5TE MATERIALS SHALL BE COLLECTED AND PROPERLY DISP05ED IN TRASH OR RECYCLE BINS. 5. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY AA5TE5 OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL OTHER THAN STORMAATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY RATER QUALITY STANDARD: CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE: OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 GFR PARTS 11'1 $ 302. 9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WA5TES FROM PAINTS, STAINS, SEALANTS, GLUES, LIME5, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS: FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/ EQUIPMENT AASH RATER AND CONCRETE AASH RATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM GLEANING OR CHEMICAL DEGREASING; AND SUPER CHLORINATED POTABLE WATER LINE FLUSHING. DURING CONSTRUCTION, PERMITEE SHALL DISPOSE OF SUCH MATERIALS IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE. PHY516ALLY SEPARATED FROM POTENTIAL STORM WATER RUNOFF, WITH ULTIMATE P15POSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 10. DEWATERING OF CONTAMINATED GROUNDAATER, OR D15GHAR6ING CONTAMINATED SOILS VIA SURFACE ER05ION 15 PROHIBITED. DEWATERING OF NON-GONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. 11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AINAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE 15 TO BE DIRECTED TOWARD DE5ILTING FACILITIES. 12. THE PERMITEE AND CONTRACTOR SHALL BE RESPONSIBLE AND TAKE NEGE55ARY PRECAUTIONS TO PREVENT PUBLIC, TREPA55 ONTO AREAS WHERE IMPOUNDED WATER CREATES A HAZARDOUS CONDITION. 13. THE PERMITEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT THE WORK 15 IN ACCORDANCE WITH THE APPROVED PLANS. 14. THE PERMITEE AND CONTRACTOR SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO THE STORM DRAIN SYSTEM OR THE WATERSHED 15 PROHIBITED. 15. EQUIPMENT AND WORKER5 FOR EMERGENGY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LAGATION5 TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN 15 IMMINENT. 16. ALL REMOVABLE ER05ION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40%. 11. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON 51TE USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE, AND STOCKPILES OF SOILS SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE 51TE STREETS, DRAINAGE FACILITIES OF ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND. 15. APPROPRIATE BMPS FOR CONSTRUCTION -RELATED MATERIALS, WASTES SPILLS OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON 51TE TO MINIMIZE TRANSPORT FROM THE THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND OR RUNOFF. NOTES: 1. ACTUAL LAYOUT DETERMINED IN FIELD 2. THE CONCRETE YVA5HOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WA5HOUT FACILITY. 1/8"d) STEEL HIRE v STAPLE PETAIL NOT TO SCALE PLYWOOD 45"1 PAINTED NHITE. 1/2" LAG - 5CREN5 0 m CONCRET WASHOUT BLACK LETTERS 6" HEIGHT WOOD POSTS 3" X3" XS' 0 in CONCRETE Y- tSHOUT SISNEfl Z ETAIL (OR E01JIYALENT) SCALE N.T.5. PLANS PREPARED BY: 40104 ( d'zn engineering 166 MAT155E CIRCLE AL150 VIEJO, GA 92656 TEL: (949) 305-8920 CLIENT: SUSHIL SARS 2'1621 Hidden Trail Road Laguna Hills, GA 92653 P: (949) 510-3556 SHEET TITLE: -A � z O > OL Z O O � v� Q O v V - O O PROJECT ADDRESS: -1 ALEXA LANE LAPERA RANCH, GA 92694 BENCHMARK: DESCRIBED BY OG5 3004 - FOUND BY OG5 ALUMINUM BENOHMARK DISK STAMPED AF -04-94 =`.116001 (NAVD55) 5ET IN THE TOP OF A 6 IN BY 6 IN CONCRETE P05T. 5AID MONUMENT BEING 22 FT EASTERLY OF THE ASiERLY GARB ALONG ANTONIO PARKWAY, 15 FT SOUTHERLY OF AN ANG POINT INA CONII V-DRCH. 621.59 - Ohieled Box in 5t. BASIS OF BEARINGS: AFN: 050-343-10 THESE PLANS WERE PREPARED UNDER THE SUPERVISION OF: P�oFEss)� w m 7 A * EXP. 51/11 sT CIV IL �Y DATE 23 -MAY -2016 ENGINEER: R. DEMA-ALA CHECKED R. DEMA-ALA PROJECT NO: 1136 REVISIONS A A A STATUS: 5UBMITTAL 1 SHEET CPPP 1 OF SHEETS 2s u LEGEND DESCRIPTION (123.45) MEAS. ELEVATIONS C ) REC. BRG. & DIST. = DECK # BRICK WALL - - BUILDING PROPERTY LINE FENCE BENCH MARK N.G. NATURAL GRADE P.P. POWER POLE WM WATER METER F.F. FINISH FLOOR G.F. GARAGE FLOOR CONC. CONCRETE F. S. FINISH SURFACE M.H. MAN—HOLE P PLANTER A.C. ASPHALT T.G. TOP—GRATE RdM SURVEYING INC RON MIEDEMA L.S. 4653 23016 LAKE FOREST DR. #409 LAGUNA HILLS, CA 92653 (949) 858-2924 OFFICE (949) 858-3438 FAX RDMSURVEYING@COX.NET `h. CF.W. 2.0 GUTTEI AC l L Ld W Z W ZZ W .. U J T❑P❑GRAPHIC SURVEY JOB: 67-9 DATE: 6/16/17 I STORY RESIDENCE 2 STORY RESIDENCE NSU"Uc_"'I V W JU.uu OWNER: SUSHIL AND L❑RENE GARG I STORY RESIDENCE _ (20.56) _ RIDGE LEGAL DESCRIPTION LOT 1, BLOCK 532, CANAL SECTI❑N NORTHERLY HALF 34TH ST, ABANDONED S� a L 5.0 NORTH 0' 8' 16' SCALE: V=8' NOTE: RECORD EASEMENTS ARE NOT PLOTTED IE ANY. BENCH MARK J-782 NAVD88 7,142 1" IRON PIPE ELEVATION= 6.60 ADDRESS OF PROJECT; 506 CLUBHOUSE NEWPORT BEACH, CA 24