Loading...
HomeMy WebLinkAbout13 - Newport Elementary Playfield - PowerPointNewport Elementary Field Rehabilitation Award of Construction Contract City Council Meeting February 26, 2018 Item 13 Public Works and Newport Mesa Unified School District 1� 'FOP- Newport Elementary Field The Newport Elementary Field is a Well Used School and Community Asset Physical Education Et School Programs Break Time Et Lunch Time Activities Sunset watching City Recreation Programing Small Group Workouts Enrichment Classes Summer Day Camp Existing Field Conditions Last Major Field Rehabilitation was Several Decades Ag The Field currently Not Protected from Windblown Sar ➢ Sand eventually Builds Up and Creates Uneven Play i Surface F., Higher Maintenance Effort Required F Pr�l Field Rehabilitation - Design Highlights ✓ Regrade existing field &Install New Turf Playing Surface (sod) ✓ Widened Boardwalk to provide Increased Separation of Boardwalk Users & Students/Playfield Users; Correct Drainage/Standing Water Issue ✓ Replace Adjacent Playground Access Sidewalk ✓ Add 21" high Seat Wall Around Field to Protect from Blowing Sand V Install new Water -Efficient Irrigation & Controls It ✓ Relocate Existing Play Equipment further back from Boardwalk (Safety Imp) -. .-.-.-.-._._-.-.-.-.��: - -- - - - - -- - - - - fowl - m.a..-----`. ----- 77 ------ s - - ---------- f -------- --- -- - ------- ------ b ;H m t �H®® Related Items Included to Address Maintenance/Safety Concerns (not in original scope) Remove and Replace existing Access Sidewalk - $13,871 Install 4" Sub -drain to address Field Runoff/Standing Water Conditions - $10,800 Install Concrete Swale to Improve Boardwalk Separation & Drainage - $15,100 y Asphalt Concrete work to Address Drainage Issues - $16,500 Relocation of Small Tot Lot Equipment - $20,000 Total Enhancement Items to Original Scope: $76,271 Project Schedule & Next Steps ➢ April thru July 2018 — Construction • Boardwalk & Hardscape Installed — during Spring Break • Grading, Wall Construction, Black Top modifications, Drainage and Irrigation follows through to the End of School Year • Lastly, Sod Installed right after School Ends ➢ July 2018—June 2019 -Turf Establishment & Maintenance • Turf Establish over Summer (no play on the field) • 240 days Continued Contractor Maintenance (over next school year) Questions £t Comments /o; 01t*1**;�0V1 Nei Your Public Works Department Protecting and Providing Quality Public Improvements and Services