Newport Elementary Field
The Newport Elementary Field is a Well Used
School and Community Asset
Physical Education Et School Programs
Break Time Et Lunch Time Activities
Sunset watching
City Recreation Programing
Small Group Workouts
Enrichment Classes
Summer Day Camp
Existing Field Conditions
Last Major Field Rehabilitation was Several Decades Ag
The Field currently Not
Protected from
Windblown
Sar
➢ Sand eventually Builds
Up and Creates
Uneven Play
i
Surface
F.,
Higher Maintenance Effort Required
F
Pr�l
Field Rehabilitation - Design Highlights
✓ Regrade existing field &Install New Turf Playing Surface (sod)
✓ Widened Boardwalk to provide Increased Separation of Boardwalk Users &
Students/Playfield Users; Correct Drainage/Standing Water Issue
✓ Replace Adjacent Playground Access Sidewalk
✓ Add 21" high Seat Wall Around Field to Protect from Blowing Sand
V Install new Water -Efficient Irrigation & Controls It
✓ Relocate Existing Play Equipment further back from Boardwalk (Safety Imp)
-. .-.-.-.-._._-.-.-.-.��: - -- - - - - -- - - - -
fowl
-
m.a..-----`. -----
77
------
s -
- ---------- f
--------
--- -- -
------- ------
b
;H
m t
�H®®
Related Items Included to Address
Maintenance/Safety Concerns
(not in original scope)
Remove and Replace existing Access Sidewalk - $13,871
Install 4" Sub -drain to address Field Runoff/Standing Water
Conditions - $10,800
Install Concrete Swale to Improve Boardwalk Separation &
Drainage - $15,100
y Asphalt Concrete work to Address Drainage Issues - $16,500
Relocation of Small Tot Lot Equipment - $20,000
Total Enhancement Items to Original Scope: $76,271
Project Schedule & Next Steps
➢ April thru July 2018 — Construction
• Boardwalk & Hardscape Installed — during Spring Break
• Grading, Wall Construction, Black Top modifications, Drainage and
Irrigation follows through to the End of School Year
• Lastly, Sod Installed right after School Ends
➢ July 2018—June 2019 -Turf Establishment & Maintenance
• Turf Establish over Summer (no play on the field)
• 240 days Continued Contractor Maintenance (over next school year)