Loading...
HomeMy WebLinkAboutN2018-0016City of Newport Beach IIII�'IIIIIII�Illll��llll�llllllll�lll II Permit No: N201$-001 s: o `r� Perm t Counter Phone (949)644-9 11 Beach, Civic Center Drive, Newport CA 92660 N 2 0 1 a 0 0 1 6 Project NO r� 's Online Inspection Request- www.newportbeachca.gov/Online =rr„ Services Inspection Requests Phone (949)644-3255 01 Job Address : 1456 KEY VIEW NB Thomas:Guide: 919G2 L._ Description: Install new sewer cleanout on existing sewer lateral per City Standard #406-L. Sidewalk restoration per City Standards. SCANNED Parcel # : 4582-311-2 - Legal Desc : N TR 6152 LOT 53 Owner: CHAN KAM-KEE VICTER Contractor: CHASE GENERAL ENGINEERING CONTRACTOR INC Phone: 0Phone: /g �p 714-914-6345 Address: 1456 KEY VIEW ;� 3 Address: � 15332 NEWCASTLE LANE CORONA DEL MAR, CA HUNTINGTON BEACH CA Applicant: CHASE GENERAL ENGINEERING CONTRACTOR INC. Phone: 714-914-6346 [ Address: 16835 ALGONQUIN ST HUNTINGTON BEACH, CA Special Cond.: Pre -job inspection required. Permit Processing Fee : $241.00 Sewer Connection: $0.00 Agreement Fee: $0.00 4717 Box Cover: $64.00 Traffic control Plan Check : $0.00 Total Water Meters: $0.00 Inspection Fee : $330.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Utilities Approval Traffic Approval: General Services Approval Date: Date: Date: Date: Contractor State Lic: 906147 License Expire: 11 30, 2019 Business License: BT30054273 Business Expire : 08 07, 2018 Workers' Compensation Insurance - - Carrier: STATE COMP INSURANCE Policy No: 9047185-16 W. C. Expire: 03 01, 2018 Total Fee $635.00 Paid: $635.00 Balance: $0.00 Receipt No: R-$11ogZ_ Other Department : Date : /_/_ Permit Denied Date : _/_/_ Issued Permit : v Date: fl /G / 11T 1. Encroachment Permits may be taken out by the owner of benefited property.or a licensed contractor. A licensed contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of, a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance. 2. The Perrmittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. 3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. 5. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by ashoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections maybe required depending on scope of work performed. . 8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verity locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser. 9. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed,"barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. 10, Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. 11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from -the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. 12. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. 13. Applicant must notify USA at 1-800.227.2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. 14. Refuse or unused materials shall be removed within 24 hours after completion'. of the work. If not removed, the City may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up daysbycalling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify that I have a Certificate of consent to self -ins a, Certifi to of Worker's- Compensgition insurance, or a Certified Copy there Date: J Signatur l4r . CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachment Permit Inspection is required by calling Public Works at 949-644-3311. '= s� 15. Any above ground utility facilities will require documented approval from the adjacent affected property owner(s). 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill. 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Public Works Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description' of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. v t nAfi��1.`g7� t��1�iv1a, W,,k Allfees Are Non -Refundable Unless Otherwise Stated PROJECT ADDRESS: PERMIT N2018- C70110 ),156 Key V;evv NUMBER: APPLICANJ: (',hose Cs>.ppvtvirol Er\9;�neer;n� Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Street/Alley/Walk Closure: Traffic Control Plan Check 8-1/2" x 11" 24" x 36" Additional Q Inspection Fee: Q $241.00 Public Works Field Inspection $165.00 2 $275.00P Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 $817.00 $192.00 Refundable Deposit: TBD $502.00 Improvements TBD $65.000 Newspaper Rack Inspection $108.00 $65.00 Sewer Connection Fee $250.00 $143.00B 4TT Box & Cover $64.00 i I [Water Meter: ky. Installation Charge .,r.y. $528.00= ;1 [3X' Meter $50.25 `. 11"Meter $12150 Water Meter Boxes: I 11 112" Meter $285.00 1" DFW Meter Box $96.66 I 11 1/2`f Turbine Meter $700.00 2" DFW Meter Box $203.24 12" Meter $425.00 12" Turbine Meter $845.40 [ 13" Meter $3,310.00 f4" Meter $4,730.00 r6" Meter $7.190.00 Certificate of Compliance Fee (+100 of hrly over 3 hrs) Development Services Fee (Plan check hourly) Final Tract Map Checking Fee Final Parcel Map Checking Fee - Moderate Lot Line Adjustment Fee Park Dedication Fee Zone _ Street Easement/Vacation Fee (+1o0% of hriy over 4 hrs) Street Tree Fee ($700 Planting Fee) -------------------------------- $288.00 $155.00 $2,488.00 $2,488.00 $1,079.00 TBD $1,022.00 TBDI 5200-5029 5200-5015 5200-5026 5200-5027 5200-5028 405-470_ 5200-5031 030-2284 Engineering Tech: Total Amount Due: For Finance Use only !R�, e (osq. — ?A-17 f —9 — M6 Permit Specialist Receipt No. • z _ a - G'`O M R ^ a �,� f/userslpbw/shared/encroach/masters/ep front and back masters/ Rev. 12/18/2017 epfeesheetxls-revised 1118/17 d 1 5 2A i e � x0 :! r 01"r�4.� PROJECT"ADDRESS: DETAILED DESCRIPTION OF OSED y�`P Pe ate' APPLICANT: > hone:/ Email Address: _ J L'�u3i'1�lst Mailing Address: v — -C--`— Cityl ate/Zip: . OWNER: Phone: Email Address., Mailing Address: Cit /State/Zip: CONTRACTOR: s p Mice Phone: 711 Company (if different): Jobsite Phone: Other Phone: Email Address: Mailinci Address: Cl /State/Zip: State Licenseliquinder & class: Ex Tres City Buskless License Number: Expires: % WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: 672w-e Policy No: = Expires: 3�/ I�EFU4iDA 1E PEPS3SITtNFORMA3IQN.flfApp/rcaf leT.. ............ .: .... (iePWtld Etayable T.o .. i .: _ ......: :. . ; .....:..: .. .::..... ..... ; ........ ... ...; . . ail Refupd To:..:.:.. ;........ .... Special Conditions of Permit: Pre -'>b ins e4Ai vH r aired - ";'- ADDITIbNAL APPRbNkL'REQUIRE[J PI�bM TH;FQ� OfhlfigG DPk)�jIP1N�S, ,_?,,„ , Utilities: Traffic: Fire: General Services: Other: Engineering Technician: `,a; Public Works Specialist: tea, Date: p Ci ice Permit No. N2.0vT-601(o I. ENser pbv[shoved/enemaWmasWrs/epwarksheat. s Public Works Department 949-644.3311 o, (E)DRIVEWAY ItN ► DEPUTY SPECIAL INSPECTION REQUIRE® 36.347 RUpp CTURAL y� OBSERVATION REQUIRED f(N)SEWER LATERAL W/ CLEANOUTCITY STANDARD STD-406-L TRATCT TO APPLY FOR "ENCROACHMENT MIT" THRU PUBLIC WORKS KEY VIEW 3TMENT ENCROACHMENT PERMIT BEFORE THE BUILDING DEPARTMENT PERMIT [ THE TIME OF PUBLIC WORKS DEPARTMENT HE EXISTING PUBLIC IMPROVEMENTS S DAMAGED BY THE PRIVATE WORK, :, CURB AND GUTTER AND ALLEY RED AND 100% PAID BY THE OWNER. THE EXTENT OF THE REPAIR WORK SHALL OF THE PUBLIC WORKS INSPECTOR. ENCROACHMENT PERMIT IS REQUIRED FOR A PUBLIC EASEMENT & PUBLIC RIGHT-OF-WAY BY THE CITY OF NEWPORT BEACH DOES NOT RELIEVE APPLICANTS ISERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH MAY BE 4TIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION SCALE- 1'-10'-0' CONSTRUCTION NOTE 0 0 THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. PLANNING NOTE 1. POOLS, SPAS, WALLS, FENCES, PATIO COVERS AND OTHER FREESTANDING STRUCTURES REQUIRE SEPARATE PERMITS. ORK IN THE CITY RIGHT-OF-WAY AN ENCROACHMETN PERMIT MUST Jr WADVC nVDADTIICKM A /10/2018 6:34:20AM City of Newport Beach INSP150 - Daily Inspection Request Report Requested Inspection Date : 01/10/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1456 KEY VIEW Page 10 of 10 Activity : N2018-0016 SubType; Status : APPROVED OWNER: CHAN KAM-KEE VICTER Phone: 0 APPLICANT: CHASE GENERAL ENGINEERING CONTRACTOR Phone : 714-914-6346 Description : Install new sewer cleanout on existing sewer lateral per City Standard #406-L. Sidewalk restoration per Citv Standards. Item: 10030 CLEAN -OUT Requested Time: 1/10/2018 12:00:OOAM Requestor: WEBUSER 714 914-6346 Entered By: WEBUSER Comments: ANY- Assigned to: zzzzzzzzzzz` Inspector: .JDate: L /O 19 Time: Z` AM PM Comments: L,/tfob. ,N GMCnDN awed Refrle F:\Users\PB\MShared\ENCROACH\MASTERS\FORMS\InsoectorSheet.doc. REPT131. Run Id: 4018 ,I a; JI ® 1 ++V3 x � i glow f 4 ,751201e City of Newport B A•4n•9nPM INC''P1Gf1 `_ Ih'ily lncne^finn l )If 13