Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
N2018-0029
wr City of Newport Beach IIY��uI��I����1 III Permit No: N2018-0029 >` c o 100 Civic Center Drive, Newport Beach, CA 92660 Permit Counter Phone (949)644-3311 - Project No: 0949-2gee flp -. 4r Online Inspection Request - www.newportbeachca.gov / Online g �4 N'F "rcrp.4�v` Services Inspection Requests Phone (949)644-3255 Job Address : 1920 KEWAMEE DR NB Thomas:Guide: 919E1 Description : PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. PEKAR) PER CITY STD. Parcel # : 0503-220-8 - Legat Desc : N TR 2813 LOT 36 Owner: PIERCE JENNINGS D JR R TRUST Phone: Address: 2222 MARTIN #100 IRVINE CA 92612 "' t Applicant: INSTANT LANDSCAPES Phone : 949-347-0700 [ Address: 28562 OSO PKWY #D-243 RSM CA 92688 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Contractor: INSTANT LANDSCAPES Phone: 949-347-0700 Address : 28562 OSO PKWY #D-243 RSM CA 92688 Contractor State Lic: 842586 License Expire: 07 31, 2018 Business License: BT30053469 Business Expire : 10 31, 2018 Workers' Compensation Insurance - - Carrier: WESCOINSURANCE Policy No: WWC3299902 W. C. Expire: 08 15, 2018 Permit Processing Fee: $241.00 Sewer Connection: $0.00 Total Fee $736.00 Agreement Fee: $0.00 4TT Box Cover: $0.00 Paid: $736.00 Traffic control Plan Check : $0.00 Total Water Meters: $0.00 Balance : $0.00 Inspection Fee : $495.00 Water Meter Connection : $0.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment: $0.00 Processed By: Date : _/ /_ Other Department: —Date: Utilities Approval : Date : _/ / Permit Denied Date Traffic Approval: Date: _/_/_ Issued Permit: Date: / I W CTfJ General Services Approval : Date: _/_/_ RK PROJECT ADDRESS: '�::j'ZQ zgr"Mee— l>12 DETAILED DESCRIPTION OF PROPOSED WORK: -t- S ' n e- '--� C� l(c tn (Lew�tvv��` A� �c t 4 . Fi t �C br- Aj: G PfOa L-( (? �ro+r-j elcl sT✓ ` J GQi APPLICANT: (y ( Phone: Email Address: Mailin Address: � Z o sb vle-u T�-t`�3 Cit /State/Zip: 5ron c A q26% 6 OWNER: jPhone:Q -&%0 ' b3'3'- Email Address: Mailing Address• . City/State/Zip: �2p \�ilkwd�cv�n�Z 6JPti3 cvl 97--r.c'V CONTRACTOR: ��� (��r U `��05CI�\�L Office Phone: Company (if different): lJobsite Phone: Other Phone: Email Address: Mailing Address: O b© ('k�`c PZ� 3 City/State/Zip: Z� 6 b �s M c A q State License Number & Class: { C 7 �6�%iS $ Expires: &-y I �� City Business License Number: to (&—T'S o o \ t 7rA Z Ex ires: 19 1 ) -�- WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) CompanyanJ�J� 6 `�S cG1U Policy No WwL1:V1Clga2 Expires: � I 116- I EPUf 17AF)tE.PEPOS1T)NFOt?MATJONOFAp //edbe) Refund Iaable Ttt . > :..:. .:: atiRefurid fo ..., .... .,;.;,:.>..;...:.: Special Conditions of Per t gDDITt NAL P PPROVAL REQiUiRED FROM THE FQILbW54 DEPART.-ENTS N Utilities: General Services: Traffic: Fire: 0 Other: Engineering Technician: rks Specialist: Mr Dater Permit No. '`7,'ts/'yl / V Efuserslpb Wshomd/encmacNmasterWepwarksheeLr t4 ` /VP✓ublic Works Department 949-644-3311 �1A'M+,fit s�+v t be. `wR.r Fa itini i�'i �'sne 'RrmM ➢ X��ao,%m 4Sar4 L-f. -�o� All Fees Are Non -Refundable Unless Otherwise Staled PROJECT ADDRESS: 20 PERMIT N2018- NUMBER: C APPLICANT: W"F=,t;0MFLETF=LYBTVU5UCM.::RKWIDERAKINIEN Permit Processing Fee: Public Works Only $241.00 [!p Other Department $275.00 Agreement Fee: Preparation of Report/Agreement $817.00 Document Recordation Fee $192.00 Monitoring Wells $502.00 Street/AlleyfWalk Closure: $65.00= Traffic Control Plan Check x11" $65.00� 24"x 2436" $143.00 Additional star ar $50. $121`. Bier r $285. irbine Meter $700. $425 to Meter $845 $3,31 G. $4,730. a7 aon. Inspection Fee: Public Works Field Inspection $165.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 Refundable Deposit: Improvements Newspaper Rack Inspection Sewer Connection Fee 4TT Box & Cover TBDBTBD $108.00 0 $250.00F:::] $64.00 IApprovat: $528.0 s: Certificate of Compliance Fee (+100% of hriy over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone _ TBD 405-470_ Street Easement/Vacation Fee (+100 of hrly over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBDI 030-2284 Engineering Tech: Total Amount Due: For Finance use only '% Permit Soecialist Receipt No. f:/userslpbw/shared/encroach/masters/ep front and back masters/ - Rev. 12/18/2017 epfeesheetxls+evised 11/8/17 /�{ t ( C a ,} ..pp""� Y "e x t' �1444tt` iyT�E�.�yy F w 1,yg''� C roTl,0+ �p� F i "y.- r Y�ss4t""yn r�^rr6�� "F +',1 `3 U s ' a sa. z;S d yySS,'�hr y4�Y.�? $-k 11 �`�,y 2 YY .. yQ'j.Y4{?'!'£i1�^. alj1lifr!r.Ah`,�'ks}.WQrvT y k :vGA3vii r�^C `k.+x��5^`- ♦,. ..,, {,% ... .,.tj�i. .. u ",.]. ., :, ala.LF..�.kfa ks_, ... .,t4 ..'.'S'; ...,'{.. ,j<, ia.1°la✓.RhPaiY`�.k 1;at'^r�'.dirz.hxFi`t aiTYv€+-04.n, a�. ,.i ,-a.i-r✓•ita I . TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) 1. Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed I certify that I have a Certificate of consent to self -in ure, Certificate of Worker's, contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the Compe saltion Insurance, or a Certified Copy hereo permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of !f a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days Date:: b 1. Signature. - after date of issuance CERTIFICATE OF EXEMPTION (Section 3800 La or Code) 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit. any person so as to become subject to California Worker's Compensation Laws. If, 3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. provisions of the State Labor Code, I must comply with the provisions of Section 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall 3700 or this shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director. permit 5. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License ClassC-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. CONTRACTOR LICENSE EXEMPTION 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. HOLD HARMLESS STATEMENT 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgmde must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities encroachments. I will be responsible for replacing the improvements if the City Department or General Services Department inspections may be required depending on scope ofwork performed. . removes them for maintenance of utilities or other public need. I shall indemnify 8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed and hold the City harmless for any liability associated with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department, Locate and pothole encroachments. existing City -owned utilities fie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a Date: Signature: 4TT box over the riser. 24-hour notice for Encroachment Permit Inspection Is required by calling 9. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All "Manual signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the Public Works at 949-644-3311. California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 15. Any above ground utility facilihe will require documented approval from the adjacent per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. affected property owner(s). 10, Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day 16. Homeowner, contractors, and subconlracotrs may each be liable for violations of Water weekend, summer between June 15 and September 15, and during the holiday season from December 19 to Quality Laws. Best Management Practices will be enforced. It is against the law to 11, January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to andstormto discharge construction debris into the gutter and storm drain. Felony violations of Water acquire a Temporary Street Closure Permit from -the Public Works Department. Access for fire, police and Quality Laws are punishable by fines up to and/orin. up three years in State emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control prison plus the full cost to clean upon illegal discharge or spill. 17 If a refundable deposit was paid, applicant must submit a Soils Compaction applicant Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by Certificate or Evidence of a Slurried Ba kfill and requesttsu a final inspectionisCo from the the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way Public Works Department. Monies may be held for six months after final inspection will require a Caltrans Permit. All vehicles shall be lawfully parked. before a refund will be processed. 12, This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. without approval from the General Services Department. 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant 19. All work in the public fight -of -Way must meet the approval of the Public Works must notify all affected residents 24 hours in advance of restricted access and any inconveniences. Department or corrections will be required (i.e. removals, exposing connections, 14. Refuse or unused matenals shall be removed within 24 hours after completion of the work. If not removed, the City etc.). Additional inspection fees may be required. may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up daysby calling 949-644-3066 20. Permit is for standard materials in the public right-of-way only, unless previously for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a approved by Public Works and an Encroachment Agreement has been processed. Temporary Street Closure Permit must be obtained from the Public Works Department. 21. Permit is valid for "description' of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. If'!O yl4xr"tF@latedry%x1115'e71GRRfaCflrllx g0ktr(� F � vel+r���� �s2 t p�lr a+i"�l�h� � b coFr21it4pns vo3lllsi'pelrrgd.rdelshpt eeg-*4 "�,P,ternrl#0sfY '{xu,, r[(e� : • 3:- v� v.3 tl." ;�,�n„ � Q"d��i�ilfl �, g` {fr• n� s- d is �t'jrmb$�$-BMnAr1L@ftl'�nde�M'1S.�ut 4F {i"'i ,''"�.,fia�-0. .I ,01, x...r'c`. x.t. X TO DRAIN SYSSTEMTEM 3!4'CRUSNE°RtR:R Ei,-----� "7/rV//(/ \� W/fILTiR C1°TTI SECTION E-E 93z9 ('j )DOWNSPOUT CONNECTION ; afl w„nvre„d,m12"@wP j NO SCALE o Fill bottom oflhe to nob with 3f4" troahetl rock 1 AD d-F wn mM pwrp rimo maeh cmh. e- FiR the real of the hem# with embed rack to 4" fmm tnpaftrenrh. (92.84-) (93.22)TC �G 92 1.r1 (93.25)TC (93.3g) 5.72 92.78 FL (93.42) WiR 18 V° (92-90) — w °I g EG (93.41� l 8 17 ^�4 18 SL -S oz. 7 ) rF q 29 C (93.33) 7 (.fG. ;29(6 (98.71)FW 14 5 ` i TW ACLI 6. - FS (U.6 , ' LJ - (96.06) b (93.3I)1c = t1- ) 9sa 3 Tw (92.85)FL zl 93.03 H 5 I-, 20 E ' ❑ U ) , m v CURB & M U G ETTU R W 93.41 FS v N 6$ FS M1 (93.10) 4 A ) 3 BX _ F (9 . c FS .3• j....� 21 FBI (93.59 NEW (93.06) FS ' O v406D �I 12 p cn3 96.82 ' 0g (93.16) r r 9 3 0 gC. W BX o (9.69) F.F. SLAB= 9.50 93.45)TX FS / PAD= 06.58 ° SMH�7BM (9,3.46) n 4 5°CONC.SLAB FS 17 O 2° LAYER SAND i T `- 93 1 , (� _ 4" GRAVElJROCK � � ;; � (. ... ) CA -Tv 15 cn 22 (g 6) FS ` HHS S \ l a W a o o F �I 8 10 z z z rg3� 19 ! m m C) (96.53 m r� (9 0 FS 93.02 LNTR !G 13 2 21Gp FS pSCjF 9ss _(1� \✓ 18 c N .6 6.66) 9$' GF ° _ M (96.69) (96,82). 94.0) 9 Z FS NTR FFG —.75)T 5 93.70) 65 C 3 gs oo 'l co P GARAGE 00 (9 .30) (.94.13) 11 r(96:, T EG F f`(9 . SLOP+ E@ 2.35% i (94.05) 1` 21 EXISTING HOUSF, 17 2 9S z 7 8 _ _ W o^p (93.7.0 TC A m try (93.20)FL D6 rn 0 on (93.36) to 96( N43°07e12"E Ec s5.4 AD 1 F' 4 z 30.00' (93,23) (1o2s7)rr m (93.73)TC DO 10'-0" (95.68)�1G (93.2 4)FL (93.89) g 93 (96.83) 17 EG (93_99) 9 (99.52) �.85 pW k PROP. LINE- j EXIST. PROP. LINE FENCF,-\ PROP. NEW RESIDENCE OVER -EXCAVATION AND RECOMPACTION TO 90% OVER -EXCAVATION DETAIL SCALE; 1 "-8' SECTION OF CUT EXTERIOR ,_- CONCRETE SLAB SLOPE @ 2% (MIN.) e' d _ v.. .gym• CONCRETE 3" SOIL 8" SILL PLATE/EARTH SEPARATION SECTION A -A SCALE: .1 "=4' 4) NEW PROP. LINE FED EXISTING 0 GRADE Ej (99.59) NG )7 T S,©S4 N SLOPE @ 5% (MIN.) CONSTRUCTION NOTES: 0 CONSTRUCT ON -SITE CONCRETE PATIO/WALKWAY, SEE LANDSCAPE ARC FOR DESIGN PATTERNS. O CONSTRUCT ON -STYE DRIVEWAY. SEE ARCH. PLANS FOR MATERIAL TYPE SUBGRADE SHALL BE PER SOIL ENGINEER'S RECOMMENDATIONS. 3� CONSTRUCT 6" DIA. AREA DRAIN INLET (DOMED GRATE). NDS MODEL 80. 4 CONSTRUCT 4" DIA DECK DRAIN (FLAT GRATE) 5� CONSTRUCT INFILTRATION BASIN (4' DEEP) FOR WATER QUALITY, SEE W( J CONSTRUCT 4" DIA. P.V.C. DRAIN PIPE AT 1 % MIN. SLOPE, PIPE SHALL BE SCHED. 40 OR SDR-35. O CONNECT ROOF DOWNSPOUT TO UNDERGROUND DRAIN SYSTEM PER IaEi7 (8 CONSTRUCT CURB DRAIN PER CITY STDS. 184-L (SEPARATE PUBLIC WORK G9 INSTALL SINGLE ROW OF GRAVEL BAGS (2 BAGS HIGH) FOR EROSION CON 10 INSTALL NEW SEWER CLEANOUT. WITH TRAFFIC RATED COVER ON EXIST] LATERAL PER CITY STD 406-L 11 CONSTRUCT 15 L.F. OF 4" DIA. P. V.C. PERFORATED DRAIN PIPE AT I % MIN.: BE SCHED. 40 OR SDR-35, SEE DETAIL HEREON. 12. REMOVE EXIST. DRIVE APPROACH PER CITY STD. 165-L AND PLANT LOW G DROUGHT TOLERANT GROUND COVER IN THE PARKWAY AREA. 13 CONSTRUCT BOTTOMLESS TRENCH DRAIN PER DETAIL HEREON 14 CONSTRUCT LOW CURBING WALL (TO ALLOW FOR ELEVATION DIFFEREM WITH WOOD FENCE ON TOP I S CONSTRUCT ON -SITE PLANTER WALL 16 PROTECT IN PLACE 17 PROVIDE SILT FENCE ALONG PROPERTY LINE PER BMP SE-1 18. REMOVE EXIST. CURB & GUTTER AND CONSTRUCT NEW DRIVE APPROACH 19. RELOCATE EXIST. GAS METER ONTO PRIVATE PROPERTY 20 REMOVE EXISTING GRAVEL IN THE PARKWAY AND PLANT LOW GROWING GROUND COVER. 21 CONSTRUCT DEEPENED FOOTING WITHIN INOF GRAVEL INFILTRATION TR SPECIFIED BY THE PROJECT SOILS ENGINEER. 22 NEW 48" PARKWAY TREE LOCATION.... TYPE OF TREE AS SPECIFIED BY THE 23 EXISTING PARKWAY TREE TO BE REMOVED. "4 NOTES: �'cFtTy AN APPROVED ENCROACHMENT PERMIT IS REQUIRED FOR ALL WORK ACTIVITIES . • - WITHIN THE PUBLIC RIGHT-OF-WAY. ALL WORK RELATED TO WASTEWATER IN' SOF-WAY ONTRACTOR PERFORMED B I E SEl A PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT INSPECTION IS REQUIRED ENGINEERING CONTRACTOR. BEFORE THE BUILDING DEPARTMENT FINAL CAN BE ISSUED. AT THE TIME OF PUBLIC WORKS DEPARTMENT INSPECTION, IF ANY OF THE EXISTING PUBLIC IMPROVEMENTS NEW CONCRETE SIDEWALK, CURB AND GU' SURROUNDING THE SITE IS DAMAGED BY THE PRIVATE WORK, NEW CONCRETE SIDEWALK, RAMP, AND ALLEY/STREET PAVEMENT MA' 1705 T CURB AND GUTTER, AND ALLEY/STREET PAVEMENT WILL BE REQUIRED. ADDITIONALLY, IF .,THE AT THE TIME OF CONSTRUCTION. I K� EXISTING UTILITIES ATER EINFRASTRUCTURE I FR ACSTRUCT FURE �ATFR EEMxD�SUDBSTrl A SUBSTANDARD,ANEW I -INCH WATER" ' ✓S AL BE MADE AT THE DISCRETION OF TI NEW RESIDENCE .y ,� SECTION B-B SCALE: 1 "=4' DRAWING (STD) / ITEM REVIEWED City of Newport Beach Public Works Dept. PUBLIC WORKS PRE -JOB CHECKLIST Public Works Inspector: JULIO VELASCO Reviewed (Y N) Date: C ( r { ( 10 Permit: N201M Address: Mobile: 714-315-4860 Email: javelasco@newportbeachca.gov STANDARD DRAWING (STD) / ITEM REVIEWED Reviewed (Y I N) Mark -out remove and replace (R&R) limts: These areas can include but are not limited to: Sidewalk ( curb a d gutter (C&G), driveway L f (DIVV) approach, AC street, PCC alley, and walkways. V- STD 105-L-A - Underground Consr uction Requirements Notes - STD 105-L-B - Trench Resurfacing - Types of Pavement Restoration STD 105-L-C - Roadway Utility Trench Detail STD 105-L-D - Parkway Utility Trench Detail STD 105-L-E - Roadway Utility Pothole and Bore Detail STD 105-L-F - Moritorium Roadway Trench Detail STD 105-L-E - Monitoring Well Capping Detail STD 140-L - Typical Alley Section: - STD 160-L-A - Commerical Driveway Approach Type I: STD 162-L- Residential Driveway Approach Type I: Typical D/W Approach STD 164-L- Residential Driveway Approach Type III: - Rolled Curb STD 180-L - Sidewalk Details: - STD 181-L-A -Curb Access Ramp Details L Case "A" to "G" STD 181-L-B -Curb Access Ramp Details II: Case "H" to "J" STD 181-L-C - Curb Access Ramp Notes: STD 181-L-D - Curb Access Ramp Detectable Warning Surface: Wausau Tile Inc of Wisonsin ADA-2 (U3008) Color A-90. STD 182-L - Standard Curb Sections Types A & B: - STD 184-L - Curb Drains: - Tree Planting Detail Parkway Tree Designation List Email Arborist, Kevin Pekar 949-644-3197 kpekar@newportbeachca.gov, a photo of your tree (must be actual tree to be planted), before job -site delivery, for his review. ifs fF « 1 � COPIES OF STDs PROVIDED? C�r! 'r�� M/Z lugs � 6) NOTES: All City stardard drawings can be found in the link below: ht p:1Auww. newportbeachca.gov/govemmenttdepartments/public- works/resources/standard-drawings/view-all-standards#Public_W orks_Department ao r- -.oAs t/VST I- �N € M Page 2 of 2 11 /17/2016 City of Newport Beach Page 2 of 8 6:34:17AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 01/17/2018 Inspection Type: ENCROACH Inspection Area : PW Site Address : 1920 KEWAMEE DR A/PID Information: Activity : N2018-0029 SubType: NEW Status: APPROVED OWNER: PIERCE JENNINGS D JR R TRUST Phone : APPLICANT: INSTANT LANDSCAPES Phone : 949-347-0700 instantlandscape@aol.com Description: PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. item: 10200 1PRE JOB - PW Requested Time: 1/17/20184ITTOWGGXM'7 Requestor: NBIVR 9497950648 Entered By: NBIVR Comments: AM i Inspecirred to : \f Date: I t Time: AM PM l el- L ; •Et—/v D v is G-,w- ems e5�- �- ---` S 5 r17E Tie-E 1�iP� rZ—E� iL7/'! } %� �®,�= V U� /—/ LPL% F:\Users\PB W \Shared\E NC ROACH\MASTERS\FORMS\Ins oectorSheet.doc REPT131 Run Id: 4018 11191 2018 City of Newport Beach Page 1 of 18 6:34:38AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 01/19/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1920 KEWAMEE DR Activity : N20113-UU29 SubType: NEW Status : APPROVED OWNER: PIERCE JENNINGS D JR R TRUST Phone: APPLICANT: INSTANT LANDSCAPES Phone : 949-347-0700 instantiandscape@aol.com Description : PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. Item: 10100 FORMS WITH COMPACTION - PW Requested Time: 1/19/2018 12:00:OOAM Requestor: NBIVR 2� y 9497950648 'J L Entered By: Lv% �. w I LL Gl4Li`i' k b Comments:C �Ins��sCt�?dto:�� Date: i. �Le1 IJ Time: "®:0°� AM PM Comments: C-1 G�i (�' �,-� GU►/) ell _Q99e Reffle F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InsoectorSheet.doc REPT131- Run Id: 4018 11221?018 City of Newport Beach Page 1 of 10 6:34:40AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 01/22/2018 Inspection Type: ENCROACH Inspection Area : PW Site Address : 1920 KEWAMEE DR A/P/D Information: Activity : N2018-0029, SubType: NEW Status: APPROVED OWNER APPLICANT Description PIERCE JENNINGS D JR R TRUST Phone : INSTANT LANDSCAPES Phone : 949-347-0700 instantiandscape@aol.com PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. PEKAR) PER CITY STD. Requested Inspection(i) Item: 10100 Requested Time: 1/22/2018 FORMS WITH COMPACTION - PW 12:00:OOAM Requestor: NBIVR 9497950648 Entered By: NBIVR Comments: AM In2B;gpgd to: Date: \ ZZ l Time: c- � 3 v A PM Comments: V/ 4- A'10� Ld- F:\Users\PBVNSha red\ENCROACH\MASTERS\FORMS\I ns oectorS heet.doc REPT131 Run Id 4018 1/22/2018 City of Newport Beach Page 4 of 14 4:30:48PM INSP15O - Daily Inspection Request Report Requested Inspection Date : 01/23/2018 Inspection Type : ENCROACH Inspection Area: PW Site Address : 1920 KEWAMEE DR Activity : N2018-0029 SubType: NEW Status : APPROVED - - - OWNER: PIERCE JENNINGS D JR R TRUST _ _ Phone: APPLICANT: INSTANT LANDSCAPES Phone : 949-347-0700 instantiandscape@aol.com Description : PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. PEKAR) PER CITY STD. Item: 10100 FORMS WITH COMPACTION - PW Requested Time: 1/23/2018 12:00:OOAM Requestor: Entered By: NBIVR Comments: AM Assigned to: J I % F�702Vt-1 d7 1 e5U— L f NBIVR 9497950648 ,. cv A-L-1 P rvrL. bX/- �y Tz-�> -6-'3ZS-C, lug 3/1 City of Newport Beach Page 1 of 7 PORT INSP150 - Daily Inspection Request RePOATY OF NEWPORT BEACH _ � Requested Inspection Date : Inspection Type: Inspection Area : Site Address : 03/19/2018 Newport Beach, California 92660 ENCROACH PW 1920 KEWAMEE DR newportbeachca.gov Activity : N2018-0029 SubType: NEW Status : APPROVED OWNER: PIERCE JENNINGS D JR R TRUST Phone: APPLICANT: INSTANT LANDSCAPES Phone : 949-347-0700 instantlandscape@aol.com Description : PLUG EXIST DRIVEWAY APPROACH PER STD 165-L, INSTALL NEW D/W APPROACH PER STD 162-L, NEW CURB CORE PER STD 184-L, NEW CURB, GUTTER AND SIDEWALK PER CITY STD AND PLANT NEW 48" BOX STREET TREE (AS PER K. Item: 10250 FINAL - PW Requested Time: 3/19/2018 12:00:00AM Requestor: NBIVR Entered By: NBIVR 9497950648 Comments: PM Assigned to : ,/f (/LV'k /G