Job Address : 1301 MARIAN LN NB
Description : 2 NEW CURB CORES PER CITY STD 184-L.
Parcel # :
1174-930-1 -
Legal Desc :
N TR 1645 LOT 26
Owner:
RICHARDSON GREGORY
Phone:
Address :
1301 MARIAN LN
NEWPORT BEACH, CA 92660
Applicant: WRIGHTJC
Phone: 949-795-0648 [
Address : 28562 OSO PKWY #D243
RSM CA 92688
Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED
Permit No: N2017-0249
Project No: 0826-2017
SCANNED
Inspection Requests Phone (949)644-3255
Thomas:Guide: 889B5
Contractor : INSTANT LANDSCAPES
Phone: 949-347-0700
Address : 28562 OSO PKWY #D-243
RSM CA 92688
Contractor State Lic: 842586
License Expire : 07 31, 2018
Business License:
BT30011792
Business Expire :
10 31, 2017
Workers' Compensation Insurance - -
Carrier:
WESCOINSURANCE
Policy No:
WWC3225863
W. C. Expire:
08 15, 2017
Permit Processing Fee :
$241.00
Sewer Connection :
$0.00
Total Fee
Agreement Fee:
$0.00
4TT Box Cover:
$0.00
Paid:
Traffic control Plan Check :
$0.00
Total Water Meters:
$0.00
Balance:
Inspection Fee :
$165.00
Water Meter Connection :
$0.00
Receipt No:
Refundable Deposit:
$0.00
Total Water Meter Box:
$0.00
Street Tree Fee :
$0.00
Adjustment:
$0.00
Processed By:
Date: _/ /
Other Department : Date
Utilities Approval :
Date: _/ /_
Permit Denied Date
Traffic Approval :
Date : _/ /_
Issued Permit : Date
General Services Approval:
Date:
$406.00
$406.00
$0.00
ORKSHEET FOR ENCROACHMENT PERMIT
CITY OF NEWPORTBEACH
PUBLIC WORKS DERARTMENT. ;
PROJECT ADDRESS: 6 (,(/�
DETAILED DESCRIPTION OF PROPOSED WORK:
APPLICANT: L-D �Ulejj Phone:
Email Address:
MaiT_ldres 4
City/State/: C� ��
OWNER: Phone:
Email Address:
Mailing Address: City/StatelZip:
ALL CONTRACTOR INFORMATION IS REQUIRED
-PLEASE COMPLETE
CONTRACTOR• _7 (fM 0SC411�
Office Phone:
Company (if different):
lJobsite Phone:
Other Phone:
Email Address:
MailiAddre s:
�n Z c�U IcvJ�
City/StatelZip:
F.-SOA 9
Sta License uJ�bar & Class:
T `�7_5, j Expires:
CityBusiness License Number:
00 Expires:
WORKERS COMPENSATION
C��OII3MPENSATION INSURANCE -'Certificate of Insurance Section 3800 Labor Code)
Company: UVJC125`-6 Policy No: �SCU Expires:
NOA .L.. OSITi1NFORMgTION:
REFU.....Q.k:QeP.. (If PA
....i.::::::>: %
ItttPiiriit t'a :able ..o,..............
M..:it Refund Toi : ii ::: >is >i: 2 i>2 :: > :: .... i:2 i ... i> :; : `j:;i ;i: :: i:::i:"< :;::.......
a
.........................
FOR OFFICE USE ONLY
Special Conditions of Permit:
i
ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS
Utilities:
General Services:
Traffic: Fire: 0
Other:
Engineering Technician:
Public W r eclalist:
Date:
Permit No.
h/usersfpNWsharea/ancmachlmaslerslemvO N heebls 1�
4q
Public Works Department 949-644.331
IIYKVJtGI AUUKCdS: I3 o ( ^ t , * � "UMBER: N2017- ��(f
Permit Processing Fee:
Public Works Only
Other Department
Agreement Fee:
Preparation of Report/Agreement
Document Recordation Fee
Monitoring Wells
StreettAlleyfWalk Closure:
Traffic Control Plan Check
8-1/2" x 11"
24" x 36"
Additional
Inspection Fee:
$241.00 Public Works Field Inspection
$275.00L= Utilities Field Inspection
General Services Inspection
Water Quality/Artificial Turf Inspection
$.00
$192192.00 Refundable Deposit:
$502.00 Improvements
$65.00= Newspaper Rack Inspection
$65.00= Sewer Connection Fee
$143.00 4TT Box & Cover
$165.00
$121.00
$165.00
$108.00
TBDPTBD
$108.00 0
$.00 $64P
64.00
Certificate of Compliance Fee (+100% of hrly over 3 hrs)
$288.00
5200-5029
Development Services Fee (Plan check hourly)
$155.00
5200-5015
Final Tract Map Checking Fee
$2,488.00
5200-5026
Final Parcel Map Checking Fee - Moderate
$2,488.00
5200-5027
Lot Line Adjustment Fee
$1,079.00
5200-5028
Park Dedication Fee Zone _
TBD
405-470_
Street EasemenWacationFee (+100%ofhrlyover 4hrs)
$1,022.00
5200-5031
Street Tree Fee ($700 Planting Fee)
TBDI
030-2284
Engineering Tech:
Total Amount Due:
For Finance Use Only
�i/XtN✓� 0
0.
P ' Specialist
Receipt No.
-
f./users/pbw/shared/encroach/masters/ep front and back masters/
Rev. 1/5/2017
epfeesheet.xls+evised 10/21/2016
TERMS AND CONDITIONS OF ENCROACHMENT PERMIT
1. Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed
contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the
permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issv_anse-of,
a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days
after date of issuance.
2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and
employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss
or damage to persons or property occurring as a result of work undertaken under this permit.
3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings
of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances.
4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall
be corrected within two weeks after notification to the satisfaction of the Public Works Director.
5. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the
Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For
construction or connection to water lines a valid State Contractor License Class 0-34 is required. For construction or
connection to sewer lines a valid State Contractor License Class C-42 is required.
6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway, and City Standard 140-L,
in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public
Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of
Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all
excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent
means. Trenches less than 5 feet in depth shall be guarded whemhazardous ground movement may be expected.
7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must
be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be
inspected and approved before backflling, or applicant may be required to excavate site. Separate Utilities
Department or General Services Department inspections may be required depending on scope of work performed. .
8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed
over or within 5 feet of any City utilities, unless approved by the Public Works Department. -Locate and pothole
existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot
clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a
4TT box over the riser.
9. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All
signs, flags, lights and other warning and safety devices shall conform to the requirements of the current " ual I
Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways', issue E-
California Department of Transportation. If needed,barricades can be obtained from the City at a charge of $10.09
per barricade per day, with a minimum charge of $35, 00. It is the responsibility of the applicant to place barricades to
protect the general public. Access to fire hydrants must be maintained at all times.
10. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day
weekend, summer between June 15 and September 15, and during the holiday season from December 19 to
January 1, unless approved by the Public Works Department.
11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to
acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and
emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control
Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any eme(s) closure
on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by
the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way
will require a Caltrans Permit. All vehicles shall be lawfully parked.
12. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of
materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure.
13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant
must notify all affected residents 24 hours in advance of restricted access and any inconveniences.
14. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City
may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066
for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a
Temporary Street Closure Permit must be obtained from the Public Works Department.
D BY A �ICN.SD-
E'CO.N I RACTOR
ance af'Ani Ezdavition.air,800-422-4133
WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code2
certify that I have a Certificate of consent to self -insure, Certificate of Worker's
Compensation Insurance, or a Certified Copy thereof.
Date:—` — i� Signature:
CERTIFICATE OF EXEMPTION (Section 3800 Labor Code)
I certify that in the performance of the work under this permit, 1 shall not employ
any person so as to become subject to California Worker's Compensation Laws. If,
after signing this certificate 1 become subject to the Worker's Compensation
provisions of the State Labor Code, I must comply with the provisions of Section
3700 or this permit shall be deemed revoked.
Date: Signature:
CONTRACTOR LICENSE EXEMPTION
As the Owner of the benefiting property, I certify I am personally performing all
work in the Public Right -of -Way.
Date: Signature:
HOLD HARMLESS STATEMENT
I understand that I am locating minor encroachments within the City Right-of-
Way/Easement. As property owner it is my responsibility to maintain the
encroachments. I will be responsible for replacing the improvements if the City
removes them for maintenance of utilities or other public need. I shall indemnify
and hold the City harmless for any liability associated with the minor
encroachments.
Date: Signature:
2 hour notice for Encroachment Permit Inspection is required by calling
li� at 949-644-3311.
15. Any above ground utility facilities will require documented approval from the adjacent
affected property owner(s).
16. Homeowner, contractors, and subconlracotrs may each be liable for violations of Water
Quality Laws. Best Management Practices will be enforced. It is against the law to
discharge construction debris into the gutter and storm drain. Felony violations of Water
Quality Laws are punishable by fines up to $25,000 and/or up to three years in State
prison plus the full cost to clean up an illegal discharge or spill.
17. If a refundable deposit was paid, applicant must submit a Soils Compaction
Certificate or Evidence of a Slurried Backfill and request a final inspection from the
Public Works Department. Monies may be held for six months after final inspection
before a refund will be processed.
18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated
without approval from the General Services Department.
19. All work in the public right-of-way must meet the approval of the Public Works
Department or corrections will be required (i.e. removals, exposing connections,
etc.). Additional inspection fees may be required.
20. Permit is for standard materials in the public right-of-way only, unless previously
approved by Public Works and an Encroachment Agreement has been processed.
21, Permit is valid for "description" of work noted on front only. Additional work
performed may require issuance of a separate permit and/or additional fees.
6/28/2017 City of Newport Beach Page 2 of 5
4:30:20PM INSP150 - Daily Inspection Request Report
Requested Inspection Date : 06/29/2017
Inspection Type: ENCROACH
Inspection Area: PW
Site Address : 1301 MARIAN LN
Activity : N2017-0249
SubType: NEW
Status : APPROVED
OWNER: RICHARDSON GREGORY Phone:
APPLICANT: WRIGHT JC Phone : 949-795-0648
)escrintinn : 2 NEW CURB CORES PER CITY STD 184-L.
Item: 10250 FINAL - PW
Requested Time: 6/29/2017 12:00:OOAM Requestor: NBIVR
9497950648
Entered By: NBIVR
Comments: AM
Assigned to:
Inspector: f Date: Time: AM PM
Comments:
COMPLETED
F:\Users\PBW\SharedkENCRCACH\MASTERS\FORMS\InspectorSheet.doe
REPT131 Run Id: 4018