HomeMy WebLinkAbout04 - Balboa Peninsula Pedestrian Crossing Improvement ProjectPaR m CITY OF �\`S NEWPORT BEACH cy<`o-P City Council Staff Report July 24, 2018 Agenda Item No. 4 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Brad Sommers, Principal Civil Engineer bsommers@newportbeachca.gov PHONE: 949-644-3326 TITLE: Balboa Peninsula Pedestrian Crossing Improvement Project— Notice of Completion for Contract No. 7288-1 (18T03) ABSTRACT: On March 27, 2018, City Council awarded Contract No. 7288-1, for the first phase of the Balboa Peninsula Pedestrian Crossing Improvement Project to Excel Paving (Excel). The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. On March 27, 2018, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Class 1 Section 15301(c); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: The construction contract was expensed from the following account: Account Description General Fund (18T03) Account Number 01201927-980000-18T03 Amount $ 408,752.04 $ 408,752.04 4-1 Balboa Peninsula Pedestrian Crossing Improvement Project — Notice of Completion for Contract No. 7288-1 (18T03) July 24, 2018 Page 2 DISCUSSION: The completed (Phase 1) Balboa Crossing Improvement project included signing, striping and pavement enhancements at 45 crosswalk locations along the Balboa Peninsula. (Phase 2 is being planned for this current fiscal year.) Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $386,307.00 $408,752.04 10% or less +5.8% +5.8% +0.0% Allowed Contract Time + 40 Actual Time 2 Approved Extensions (days) = Under (-) or Over (+) The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original bid amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final Contract Cost: $386,607.00 $404,577.38 $4,174.66 $408,752.04 The final contract cost of $408,627.43 is 5.8 percent higher than the original bid amount. This cost increase was primarily due to roadway paving added to repair damaged pavement adjacent to the crosswalk locations. This project included three change orders for a total amount of $4,174.66, which is approximately 1 percent of the original bid amount. Change orders were issued to revise the thermoplastic striping mixture to increase slip resistance and retroreflectivity of the crosswalk striping and to replace additional deteriorated signage within the project area. A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 3/12/18 Actual Start of Construction Per Notice to Proceed 4/16/18 Extended Contract Completion Date Inclusive of Extra Work 6/11/18 Actual Substantial Construction Completion Date 6/7/18 4-2 Balboa Peninsula Pedestrian Crossing Improvement Project — Notice of Completion for Contract No. 7288-1 (18T03) July 24, 2018 Page 3 ENVIRONMENTAL REVIEW: On March 27, 2018, the City Council found this project to be exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15301 Class 1 (c) (maintenance of existing public facilities involving negligible or no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 4-3 �9\ 1-0 09 BALBOA BLVD. BALBOA BLVD. • 44TH ST. • 18TH ST. • 42ND ST. • 17TH ST. • 40TH ST. • 16TH ST. • 38TH ST. • 14TH ST. • 36TH ST. • 13TH ST. • 35TH ST. • 12TH ST. • 34TH ST. • 11TH ST. • 32ND ST. • 10TH ST. • 31ST ST. • 9TH ST. • 30TH ST. • 8TH ST. • 28TH ST. • 7TH ST. • 26TH ST. • 6TH ST. • 23RD ST. • ISLAND AVE. • 22ND ST. • MEDINA WY. • 21ST ST. • CORONADO ST. • 20TH ST. • N/0 CYPRESS • 19TH ST. • ADAMS ST. BALBOA BLVD. ST. • PALM ST. • WASHINGTON • MAIN ST. • E ST. • G ST. • 1 ST. • W/O SERRANO AVE. ATTACHMENT A NEWPORT BLVD. • 23RD ST. ST. • 26TH ST. • 28TH ST. • 30TH ST. BALBOA PENINSULA CROSSWALK IMPROVEMENT PROJECT LOCATION MAP CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT 7/24/2018