HomeMy WebLinkAbout12 - Newport Elementary Playfield ReconstructionP0 @ CITY OF NEWPORT BEACH mN'P City Council Staff Report </FOR August 14, 2018 Agenda Item No. 12 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Patrick Arciniega, Senior Civil Engineer PHONE: 949-644-3347, parciniega@newportbeachca.gov TITLE: Newport Elementary Playfield Reconstruction — Notice of Completion for Contract No. 8150-2 (17P15) ABSTRACT: On February 27, 2018, City Council awarded Contract No. 8150-2 for Newport Elementary Playfield Reconstruction, to GMC Engineering, Inc. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. On February 27, 2018, the project was found to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332; b) Authorize the City Clerk to release the Labor & Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release Faithful Performance Bond one (1) year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expensed from the following account: Account Description Account Number Amount Oceanfront Encroachment 01201939-980000-17P15 $290,333.85 Contributions — NMUSD 13501-980000-17P15 $250,000.00 Total: $540,333.85 DISCUSSION: This project regraded and re -turfed the existing grass playfield located between the Oceanfront Boardwalk and existing blacktop next to the beach sand. It also removed and replaced the existing CMU (concrete masonry unit) sand/seat walls surrounding the playfield and adjacent concrete sidewalk. Small areas of both concrete sidewalk and asphalt concrete pavement were extended. 12-1 Newport Elementary Playfield Reconstruction — Notice of Completion for Contract No. 8150-2 (171015) August 14, 2018 Page 2 The work necessary for the completion of this contract consisted of removing and replacing an existing block wall; grading; removing and replacing turf; widening a portion of the boardwalk; providing as -built drawings and other incidental items to complete the work in places required by the contract documents. The Contractor had 85 consecutive working days to complete the work. Construction began on April 16, 2018 and was substantially complete by July 25, 2018. Overall Contract Cost/Time Summary Awarded Final Cost Contingency Actual % Due to % Due to Contract at Allowance Contract Directed Unforeseen Amount Completion Change Change Change $520,520.00 $540,333.85 10% 2.6% 1.2% 1.4% Allowed Contract Time + Actual Time Under (-) or Approved Extensions 85 Over (+) 6 (days) = Contract No. 8150-2, Newport Elementary Playfield, has been completed to the satisfaction of the Public Works Department. A summary of this contract's construction cost is as follows: Original Bid Amount: $520,520.00 Actual Cost of Bid Items Constructed: $526,668.85 Total Change Orders: $13,665.00 Final Contract Cost: $540,317.16 A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 4/16/2018 Actual Start of Construction per Notice to Proceed 4/16/2018 Completion Date per Contract and Approved Extension Days 7/31/2018 Actual Substantial Construction Complete Date 7/25/2018 ENVIRONMENTAL REVIEW: On February 27, 2018, City Council found this action exempt from the CEQA pursuant to Class 4 Section 15332 (in -fill development projects) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 12-2 w w ry U) d- T ATTACHMENT A BALBOA BLVD W NEWPORT ELEMENTARY SCHOOL Q w w co r NEWPORT ELEMENTARY SCHOOL CITY OF NEWPORT BEACH FIELD RENOVATION PUBLIC WORKS DEPARTMENT LOCATION MAP C-8150-1 12-3