Loading...
HomeMy WebLinkAboutSS3 - Traffic Signal System Update - PowerPointeptember 11, CITY OF NEWPORT BEACH "em No. ss' ie TRANSPORTATION TECHNOLOGY UPDATE 14 A. TyyiLlj�1L]X�R WLLX� Newport Beach City Council - September 11, 2018 Study Session Advance I ffic Signal Svstem Advanced system developed through the Traffic Signal Modernization Program Traffic Management Center—Centralized monitoring Rea I -time i nformation A�" Incident Management ; 4 Quick Response i _ F Enhanced field equipment Increased Reliability Expandable 2211- Newport Boulevard 9 32nd Skeet Newport @ 32nd Jurisdiction Newport Brach M- Type 3 1 Pattern 13 _Patt L TimeDnft 2s ; Comms �r 1� � S s `.. A Fiber Optic Communication Network COASTHWY/ High bandwidth Fiber Optic MORNING CANYON RD CABINETDETF-F AILcommunication network connects � _ASC'3_; City's transportation system along ES arterial roadways to the Traffic Management Center 11 NMI, LF Connects City facilities via traffic signal WA r network Provides communication backbone for future technologies pRaDo rV ad r 0 0TY Oc AEAPMT BEA C4 FWrF%29Ea -14-= Mg -F Benefits of Technology Integration on Roadway Network Leading-edge technology to increase efficiency and address increasing demand on the roadway network Improve traffic flow Reduced delays Reduce frustration 3. Reduce emissions 4 Increase reliability Reduce Costs Prepare for future Bluetooth Traffic Monitoring System Deployed Winter 2018 Monitors placed on Peninsula, in Corona del Mar and Newport Coast, MacArthur Blvd and Coast Hwy. Provides general travel time and corridor use statistics Share information with other agencies Bluetooth Monitoring - Observations Travel time and peak period information Congestion alerts Real-time monitoring Traffic trends ➢ Fine-tune traffic signal coordination ➢ Monitor construction/incidents ➢ Review effectiveness of implemented changes Newport Boulevard "Responsive" Control Demonstration Project S i Advance traffic signal timing strategy System incorporated through a Grant Project in fall 2017 Installed on Newport Blvd (Peninsula) 21s' Street to Via Lido Integrated into existing traffic signal management software - No additional software needed Newport Boulevard "Responsive" Control Demonstration Project Observations Reduction of side street delay during the off-peak and "shoulder" periods ✓ Reduced need for staff to change timing plans ➢ Recommendation — Maintain Responsive operation on Newport Blvd MacArthur Blvd " Adaptive" Control Demonstration Project Leading-edge traffic signal timing strategy Installed on MacArthur Blvd Coast Hwy to Bison Ave System turned on December 2017 Adaptive requires procurement of additional software modules at the central and field locations Software used on a trial basis MacArthur Blvd "Adaptive" Control Demonstration Project Observations Initial benefits to MacArthur flow of traffic 1. Created impacts to side street movements 'IV Labor intensive ➢ Recommendation A ➢ End demonstration project ➢ Consider "Responsive" control strategy ➢ Monitor development of Adaptive control Future Technology Increased motorist and roadway information Connected users/vehicles Autonomous Vehicles preparing for the Future Existing system is a strong foundation for future technology deployment Continue to invest in signal system to ensure integration of future technology Monitor and be active in legislation changes Continued education for Staff Be aware of Leading vs. Bleeding Edge Maintain current system 14 Ongoing/Upcoming Projects Coast Hen City of Ire Fiber optic Communication network expansion Traffic Signal Rehabilitation Project Questions & Comments /o; tiWPo\ 01_11111:�Ovt�� Your Public Works Department A Well -Engineered Machine Protecting and Providing Quality Public Improvements and Services Corona del Mar Sample Traffic Observations Weekend Peak Hour Average (June 2-3 at 3-4 p.m.) Route Travel Time (min:sec) Use (%) Coast Hwy 12:36 75% NCD/SJHR `IEEII 17% Weekday Peak Hour Average (June 4-8 at 4-5 p.m.) Route Travel Time (min:sec) Use (%) Coast Hwy 15:16 55% NCD/SJHR 11:05 21% NCD/BC WOMI 7 NCD/BC 12:03 24% All routes begin at Coast Hwy/Newport Coast Dr and end at MacArthur Blvd/Bison Ave • Coast Hwy: via Coast Highway through Corona del Mar • NCD/SJHR: via Newport Coast Dr and San Joaquin Hills Rd • NCD/Bonita Canyon: via Newport Coast Dr and Bonita Canyon Dr