HomeMy WebLinkAbout08 - Newport Beach Police Facility Remodel — NOC for Contract No. 7261-1 (17F12)PORT CITY OF O � _ i NEWPORT BEACH City Council Staff Report <i FO RN February 12, 2019 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Peter Tauscher, Senior Civil Engineer, ptauscher@newportbeachca.gov PHONE: 949-644-3316 TITLE: Newport Beach Police Facility Remodel — Notice of Completion for Contract No. 7261-1 (17F12) ABSTRACT: On February 13, 2018, the City Council awarded Contract No. 7261-1, Newport Beach Police Facility Remodel project to TL Veterans Construction, Inc. (TLV) The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Class 1 (maintenance of existing facilities involving no expansion of an existing use) of the CEQA Guidelines, because this project has no potential to have a significant effect on the environment; b) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; c) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and d) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount General Fund 01201925-980000-17F12 $ 510,287.19 Total: $ 510,287.19 RIM Newport Beach Police Facility Remodel — Notice of Completion for Contract No. 7261-1 (17F12) February 12, 2019 Page 2 DISCUSSION: Awarded Final Cost at Contingency Actual % Due to % Due to Contract Completion Allowance Contract Directed Unforeseen Amount Chane Chane Change $496,800.00 $510,287.19 10% or less 3% 0.0% 3% Allowed Contract Time (days) 90 Actual Time -5 Under - or Over + The work remodeled portions of the Police Facility including Detective, Squad, CSI, CSU and Interview Rooms as required by the contract documents. The remodel updated the lighting system, ceiling tiles, and minor room alterations, made the spaces more functional, and prepared the rooms for new office furniture. The Notice to Proceed was issued to begin work on May 21, 2018. The contract was completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original Bid Amount: $ 496,800.00 Actual Cost of Bid Items Constructed: $ 496,152.04 Total Change Orders: $ 14,135.15 Final Contract Cost: $ 510,287.19 One change order totaling $14,135.15, a 2.8 percent increase over the original contract amount, was issued. The change order included painting the Captain's Office to match the Detective's Room, changing walls and floor finishes, freezing the water line to install a shut off valve and drywall repairs from water damage not related to this project. A summary of the project schedule is as follows: Estimated Completion Date per 2018 Baseline Schedule October 31, 2018 Project Award for Construction: February 13, 2018 Contract Completion Date with Approved Extensions November 29, 2018 Actual Substantial Construction Completion Date September 26, 2018 The project was substantially complete on September 26, 2018 and contractor and design team participated in a punch walk to identify any items not completed in accordance with the contract documents. Although the contract was substantially complete, a few items including replacing plumbing angle stops, programming new lighting, painting and drywall repairs, and replacing flooring needed to be completed to the satisfaction of Public Works. The revised completion date was extended until November 29, 2018 for procuring and installing these materials. Newport Beach Police Facility Remodel — Notice of Completion for Contract No. 7261-1 (17F12) February 12, 2019 Page 3 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Class 1 (maintenance of existing facilities involving no expansion of an existing use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. ATTACHMENT: Attachment A — Project Location Map ON ATTACHMENT A NEWPORT BEACH POLICE DEPARTMENT REMODEL • _ •► 1 A_9 a NOT TO SCALE CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7261-01 2/12/2019