Loading...
HomeMy WebLinkAbout09 - City Facilities Painting Project - Award of Contract No. 7499-1 (18F02)Q SEW Pp�T CITY OF �m z NEWPORT BEACH c�<,FORN'P City Council Staff Report March 26, 2019 Agenda Item No. 9 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Kathryne Cho, Civil Engineer, kcho@newportbeachca.gov PHONE: 949-644-3014 TITLE: City Facilities Painting Project — FMMP 2018-2019 — Award of Contract No. 7499-1 (18F02) h\ 3�d_Mfla6 Staff received construction bids for the Facilities Painting Project as part of the Facilities Maintenance Master Plan for 2018-2019 and requests City Council approval to award the work to Tony Painting (Tony) of Garden Grove, California. RECOMMENDATION: a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Class 1 (maintenance of existing facilities involving no expansion of an existing use) of the CEQA Guidelines because this project has no potential to have a significant effect on the environment; b) Approve the project drawings and specifications; c) Award Contract No. 7499-1 to Tony Painting for the total bid price of $398,700.00, and authorize the Mayor and City Clerk to execute the contract; and d) Establish a $60,000.00 (approximately 15 percent) contingency amount to cover the cost of unforeseen work not included in the original contract. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for this project. The following fund will be expensed: Account Description Facilities Maintenance Account Number 57101-980000-18F02 Amount $ 465,000.00 $ 465,000.00 9-1 City Facilities Painting Project — FMMP 2018-2019 — Award of Contract No. 7499-1 (181`02) March 26, 2019 Page 2 Proposed uses of the funds are as follows: Vendor Purpose Amount Tony Painting Construction Contract $ 398,700.00 Tony Painting Construction Contingency $ 60,000.00 Various Printing and Incidentals $ 6,300.00 $ 465,000.00 BACKGROUND: As part of the Facilities Maintenance Master Plan (FMMP) eighty-seven (87) City buildings were inspected in 2013. The FMMP evaluation included electrical panels, ventilation, plumbing, electrical, interior/exterior finishes, weather protection, and site work. Staff prioritized the various capital maintenance needs and completed a number of projects since the FMMP was developed with an emphasis on items that kept the facilities in service. They included replacing backup generators, air conditioning and heating units, roofs, and damaged flooring; sealing leaky windows; painting facilities, and refreshing and remodeling public restrooms. DISCUSSION: At 10:00 AM on March 12, 2019, the City Clerk opened and read the following bids for this project: BIDDER Low Tony Painting 2 Jeff Painting 3 AJ Fistes Corporation 4 C&M Painters, Inc. 5 Pacific Contractors Group Inc. 6 CTG Construction, Inc. 7 Piana Construction & Painting Inc. 8 ISR Painting 9 Color New Co. 10 U.S National Corp TOTAL BID AMOUNT $ 398,700.00 $ 632,565.00 $ 694,976.00 $ 721,000.00 $ 740,000.00 $ 745,000.00 $ 820,000.00 $ 860,000.00 $ 929,000.00 $1,366,200.00 A mandatory pre-bid job walk was held at Big Canyon Reservoir to familiarize contractors with the scope of work expected at the secured facility. More than twenty contractors attended. A photo appendix was provided as part of the specification for all other locations. The bid amount submitted by Tony Painting is substantially less than the advertised engineer's $850,000.00 estimate. This estimate was based on bid pricing included in recent bids. Staff met with the owner of Tony Painting (low bidder) several times to insure they understood what is expected to be completed, verified that his bid is complete and they are able to perform all the work at the price being proposed. Reference checks conducted by staff indicate Tony has satisfactorily completed similar painting projects for school districts and other local, state, and federal agencies. 9-2 City Facilities Painting Project — FMMP 2018-2019 — Award of Contract No. 7499-1 (181`02) March 26, 2019 Page 3 Staff also took into consideration that Tony was the low bidder (substantially below the Engineer's Estimate) and awarded a large facility painting project for the City in 2017 and performed well and met expectations on that project. Tony also currently holds an On -Call Maintenance/Repair Services Agreement with the City of Newport Beach for as -needed painting services and has performed well on this service contract. Tony possesses a California State Painting and Decorating C-33 Contractor License as required by the contract documents. Per contract, Tony is allotted 80 consecutive working days to complete the work. Liquidated damages for $1,000 per calendar day will be assessed if all work is not substantially completed in that time. In addition to the standard 1 -year warranty on public works construction, the contract includes a 2 -year zero deductible 100 percent parts and labor extended warranty that provides the City with the ability to call upon the contractor to make repairs to the work completed under this contract. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 Class 1 (maintenance of existing facilities involving no expansion of an existing use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 9-3 Cl TY OF FOUNTAIN VALLEY C.N.B. WELL SI TES CITY OF COSTA MESA 17 Tf JOHN WAYNE AIRPORT PgC//C-/C CCF -4/V VICINITY MAP NOT TO SCALE 2018-2019 FACILITIES PAINTING PROJECT LOCATION MAP Attachment f - O�p CITY OF IRVINE P� UNIVERSITY PROJECT LOCATIONS nR /3 \Ew, CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7499-1 1 03/26/19