Loading...
HomeMy WebLinkAboutN2018-0020�r W%Vly City of Newport Beach 11111111111111111111111111111111111111111111 0 100 Civic Center Drive, Newport Beach, CA 92660 N 2 0 1 8 0 0 2 0 Permit Counter Phone (949)644-3311 Online Inspection Request - www.newportbeachea.gov / Online Services Permit No: N 2018-0020 Project No: 2313-2017 SCANNE[.,� Inspection Requests Phone (949)644-3255 Job Address: 2854 CAROB ST NB Thomas:Guide: 889E3 Description : INSTALL SEWER CLEAN OUT PER STD 406-L. PURCHASE 1" METER AND 1" BOX/COVER. Parcel # : 4400-740-2 - Legal Desc : N TR 5018 LOT 117 Owner: Phone: ACOSTA JONATHON 714-730-2723 ` �.�' Contractor : �''Phone: COAST WATER & POWER 949-548-0106 949-289-0078 Address : 2854 CAROB ST Address : P 0 BOX 3341 NEWPORT BEACH, CA 92661 NEWPORT BEACH CA 92659 Applicant: COAST WATER & POWER Phone : 949-548-0106 949-289-0078[ Address : P 0 BOX 3341 NEWPORT BEACH CA 92659 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Contractor State Lic: 738400 License Expire : 07 31, 2019 Business License: BT96014951 SCANNED Business Expire: 12 31, 2018 Workers' Compensation Insurance - - Carrier : STATE COMP INS FUND Policy No: 9087110 W. C. Expire: 10 01, 2018 Permit Processing Fee: $241.00 Sewer Connection : $250.00 Total Fee $1,796.16 Agreement Fee: $0.00 4TT Box Cover: $64.00 Paid : $1,796.16 Traffic control Plan Check: $0.00 Total Water Meters : $649.50 Balance: $0.00 Inspection Fee: $495.00 Water Meter Connection: $528.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $96.66 $0.00 0 �— + I Street Tree Fee : $0.00 Adjustment: Processed By: Date: / / Other Department: Date Utilities Approval : Date: ! ! Permit Denied Date Traffic Approval : Date: I / Issued Permit: Date General Services Approval : Date: / / INBOUND NOTIFICATION : FAX RECEIVED SUCCESSFULLY TIME RECEIVED REMOTE CSID DURATION PAGES STATUS January 8, 2018 at 3;31:18 PM PST 114 4 Received PLEASE COMPLETE THE FOLLOWING INFOR A I N PROJECT ADDRESS; 6� $ � y Ct V. Oto DESCRIPTION OF WORK: SeWite C(e&A-o%A r=e '4010 « L . APPLICANT: MIKE KILBRIDE Mailing Address: Phone: 949-289-0078 City/Statelzip; PO BOX 3341 N EWPORT BEACH, CA 92659 OWNER: Phone: Mailing Address: City/Statelzip: CONTRACTOR: MIKE KILBRIDE Office Phone: 949-548-0106 Company (it different): Jobsite Phone: 949-289-0078 Other Phone: FAX: 949-548-1616 COAST WATER AND POWER Mailing Address; CitylState/Zip: PO BOX 3341 NEWPORT BEACH, CA 92659 State License Number & Class: City Business License Number: 738400 A, B, C-10 BT9601491 EXP: 12-31 2017 WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: STATE FUND PoI c No: 9087110-142 Expires: 10/1f2018 DEPOSIT INFORMATION (lfAp licable) fMRIEFUNDABLE ade Pa able To: MIKE KILBRIDE Vendor No: 9833 ailin Address: F0 BOX 3341, NEWPORT BEACH CA 92659 Special Conditions of Permit: Utilities: General Services: Engineering Technician: Pubii Traffic: Other; Specialist: Date: Permit No, N201 a - vermit NroCessing Fee; Inspection Fee; Public Works Only $241.00 Public Works Field Inspection $165. co I Other Department $275.00 Utilities Field Inspection $121.0 General Services Inspection $165.00 Agreement Fee: Water Quality1Artlficial Turf Pnspection $10$.00 Preparation of ReporVAgreement $817.00 Document Recordation Fee Monitoring Wells $192.00 $502.00 Refundable Deposit: Improvements TBD T130 Street/Alley/Walk Closure: $65 00 Newspaper Rack Inspection $108.00 Traffic Control Plan Check 8-1/2" x 11" 24" x 36" $65.00 $143.00 Sewer Connection Fee 4TT BOX & Cover $250.00 $64_00 Additional I� TIC FOL ' WIN ITEMS REQUlRTE APPROVAL rOff If WE _ — Re enue oivislon REVENUE DIVISION PRIOR TO PAYMENT OF FEES Approval: 1 (Water Meter: 13/4r Meter Qty. Installation Charge 4qv�. 1 $528,00 11" Meter $50.25 1 11 1/2" Meter $121.60 Water Meter Boxes: $285.00 1" DFW Meter Box $95.6 1 1 1/2" Turbine Meter $700.00 2" DFW Meter Box $243_24 1 12 Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 14" Meter $4, 730.00 16" Meter ..�s�� ..fWl.i •f'fF1 "!1'i.::/ilr . _ ........r . .. $7,190.00 .. .... ... ...._ �.-- _ _ I Certificate of Compliance Fee (4-100% of hrly over 3 hrs) 0 $288.00 Budget Number 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488 00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (*100% of h rty over 4 hrs) $1.022.00 5200-5031 Street Tree Fee ($700 Planting Fee) 1�far rrr■ r���rrarl�r ��w-� rrr�rr r�-wrrr�ri TBD 030-2284 Engineering Tech: --�r-�-rw� Total Amount (Due: -�-� r •rrr •w.�. ■�r� �r�--r�r r �.--•.err �.r For Finance the Only I Permit $pecj tt - Rec 7 v. �t:1:.e�rslpew�phAf6tl7�ffc�cachlmast8f7l4p 1 i /ai2o1 7_ front and back rniRetero1 e�ian-ha9t.:d4•,�vlaed 11:dt�7 it LEGEND TREE = POWER POLE =SEWE.R CL,EANrOUT J = WATER METER BOX �I I '' S/w i CURB ti GLlTER -� CENTER ENE CITY OF NEWPORT BEACH AbDR,_.SS �g � ENCROACHMENT PERMI`f AAPPLICgNT � I L'BK j OWNER I- DESCRIPTION OF WORK E P ermit No. CITY OF NEWPORT BEACH APPLICATION FOR WATER METER OR HYDRANT METER REQUESTED 13Y— Ad& ide— (entity who is requesting meter andlor would get hydrant MAILING ADDRESS RECEIPT# CITY/STATEIZIP SERVICE ADDRESSgg5q OOL PHONE # Chock 4* ( ) Hydrant Meter ( ) New Meter Deposit required New service address (tapping order) (tapping order) New Meter at existing service address (tapping order) Meter Upgrade Existing service address (work order) ( ) Irrigation only ( ) Commercial Location (Residential Location () Fire Connection Fee $ r Meter Size I Fee $t*V. 5 p (.4/4TT Box Fee $ (V 4eter box & Lid - Allay/Traffic Area Fee $ or Parkways/Sidewalk Fee Total Fees $ Encroachment Permit Number. /) Z of ram ocZ.1-6 Customer Name (property owner) Q Billing Address2$54 61r*6 S f CItY1ZIp ICA df"�o 0 Residence Phone # E-Mail Address Social Security # or CA Drivers License Business Phone # FOR OFFICE USE ONLY CLERK DATE BUS LIC # MID# DATE UTILITIES COMPLETED DATE HYDRANT METER CLOSED NEW ACCOUNT NUMBER WORK/TAPPING ORDER NUMBER f/usershevlshared/wateNwater meter sere app 05/21/16 NOTES ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. 3 All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. 6 All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. 7 The Public Works Department inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilting, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed. 8 All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities fie, water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleancuts require VCP or PVC SDR35 be used with a 4TT box over the riser 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00 It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times 10 Work within or near beach sensitive areas will not be allowed during, City holidays, spring break. Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. 11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department Access for fire, police and emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit All vehicles shall be lawfully parked 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. 13 Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. 14 Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) certify that I have a Certificate of consent to self -insure, Certificate of Worker's Coin sat n Insur ce, or a Certified CoMereylyo.✓l' Date A � Signature. CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroa h enits. (� � Date:10 QA signature 24-hour notice for Encroachment Permit Inspection is required by calling Public Works at 949-644-3311. 15 Any above ground utility facilities will require documented approval from the adjacent affected property owners). 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm dram. Felony violations of Water Duality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Public Work, Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit shall be performed until the Public Works Department has Issued this permit. Applicant hereby cknowledges he/she W.s read and understands the terms and conditions of this permit and he/she agrees to abide by them. Permit is void If work Is not commenced within 30 days after. Issuance. tit? . 1 Permit fees are nonrefundable. DatC:1 _Signature�� 33.64288ON 117.87006'W ± 5 m WGS84 215 deg(T), 48 m, 2019-03-18 11:11:21-07:00 9 IVP 2854 Carob St. 3/18/2019 City of Newport Beach Page 11 of 24 6:30:43AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 03/18/2019 Inspection Type: ENCROACH Inspection Area : PW Site Address : 2854 CAROB ST A/P/D Information: Activity : N2018-0020 SubType : NEW Status : APPROVED OWNER: ACOSTA JONATHON Phone : 714-730-2723 APPLICANT: COAST WATER & POWER Phone : 949-548-0106 949-289-0078 mikekilbride@live.com Description : INSTALL SEWER CLEAN OUT PER STD 406-L. PURCHASE 1" METER AND 1" BOX/COVER. Requested Inspectkm(s) Item: 10250 FINAL - PW Requested Time: 3/18/2019 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER Comments: AM - Assigned to: zzzzzzzzzzz* e-AAU COMPLETED