Loading...
HomeMy WebLinkAboutN2017-0473WPr;�.� City of Newport Beach IIIIIIIIIIII��IIIII�IIIIII�II�I�IIIIII�III�I��III 100 Civic Center Drive, Newport Beach, CA 92660 N 2 0 1 7 0 4 7 3 Permit Counter Phone (949)644-3311 Online Inspection Request - www.newportbeachca.gov / Online y�> Services Job Address: 1836 PORT SHEFFIELD PL NB Description : INSTALL 2" WATER SERVICE PER STD 503-L FOR 1 1/2" METER. Parcel # : 4581-130-7 - Legal Desc : N TR 6620 LOT 7 Owner: PORT SHEFFIELD 1836 TRUST Phone: �: a Address : 16430 BAKE PKWY IRVINE CA 92618 Applicant: COAST WATER & POWER Phone : 949-548-0106 949-289-0078[ Address : P O BOX 3341 NEWPORT BEACH CA 92659 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Permit Processing Fee : $241.00 Sewer Connection : $0.00 Agreement Fee : $0.00 4TT Box Cover: $0.00 Traffic control Plan Check : $0.00 Total Water Meters : $813.00 Inspection Fee : $330.00 Water Meter Connection : $528.00 Refundable Deposit: $0.00 Total Water Meter Box: $88.25 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By : Utilities Approval Traffic Approval : General Services Approval Date �/ % 7 Date Date Date Permit No: N2017-0473. Project No : 0197-2016 Inspection Requests Phone (949)644-3255 Thomas:Guide: 889G5 Contractor : COAST WATER & POWER Phone: 949-548-0106 949-289-0078 Address : P O BOX 3341 NEWPORT BEACH CA 92659 Contractor State Lic: 738400 License Expire : 07 31, 2019 Business License: BT96014951 Business Expire : 12 31, 2017 Workers' Compensation Insurance - - Carrier : STATE COMP INS FUND Policy No: 9087110 W. C. Expire: 10 30, 2017 Total Fee $1,472.25 Paid : $1,472.25 Balance : $0.00 Receipt No Other Department : Date Permit Denied : Date Issued Permit :C- Date: INBOUND NOTIFICATION : FAX RECEIVED SUCCESSFULLY 'YY TIME RECEIVED REMOTE CSID DURATION PAGES STATUS September 13, 2017 3:49:51 PM PDT 166 5 Received PLEASE COMPLETE THE FOLLOWING INFORMATION PROJECT ADDRESS: 1836 PORT SHEFFIELD 0 [6 ~7 - 2 C: I(o Permit Processing Fee: Public Works Only $241.00 Inspection Fee: Public Works Field Inspection $165.0 \ Other Department $275.00 Utilities Field Inspection $121-00 General Services Inspection $165.00 Agreement Fee: Water Quality/Artificial Turf Inspection $108.00 Preparation of Report/Agreement $817.00 Document Recordation Fee Monitoring Wells $192.00 $502,00 Refundable Deposit: Improvements TBD TBD Street/Alley/Walk Closure: $65.00= Newspaper Rack Inspection $108.00 Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee $250.00 24" x 36" $143.00 4TT Box & Cover $64.00 Additional i : . • : • OLtf VZf`1C3_tTi=M3rf�CUII A 1�At.F.RAJVTI� , Re enuec Rirrislon _� REVENtlI DIVISION: PRtQR TO PAYIlAf pYT O FEE : : : _ Aj pmval_ : _ : : ; [WaE p Meter: ; [} 4."•�M12:,"t: ehQre:.' t. r : : : - : ::n1q• ... . VeMQ'tr,8.. . '; $:2 sE3/ "Me r ::.:::.idCi;. 25o8'." ..0 e�r>away Sideraik Arvfitfl. o o + 37-0 e- _ 1"'Neter .�ati :11.2,.TiMeter,- . .. l ' _ . . . . S"�D0.0b : : '2 _M*r;' • _27..D0 +' 61,23 5 . i Tj.rrblri Mefei • : :.:.:.:.:. ; . :$$ 5.Q0 FqF-Yra i0 &�A 10Y yea : Box.+.CQY'Bf �:Co$#� ' ' I 3'' Islet - -$3,31Q.3o _ :1`.'-M&tk. 91-00.+ 38.0:01,00 .2 Meter.:.2:7..00 „:Meier-�.-.... -.. - �, .. _'-�`�7"���•�?� -�.. � •:. •-_- �-�..... ..........:..•..� • ...•- . _ . �� Certificate of Compliance Fee (+1000/6 of h0y over 3 hm) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate S2,488.00 5200-5027 Lot Line Adjustment Fee $1.079,00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easemert/Vacation Fee (+100% of hrly over 4 hrs) $1; 022.00 5200-5031 Street Tree Fee ($700 Planting Fee) ■ war-awiwww�wr �wwwwsw wwr--��www�w TBDL 030-2284 Engineering Tech: r�.,w�www�w. Total.Amount Due: �.www� ■ wr.--w wow � ww1-� wa�ww�w ww� ww.�-w wow For Finance Use Only Permlt ialist Receipt . ,' / � L Rev- 10/21/2016 :luzaralpbW;?F1$nidle�Q'aadilm85td8/tp front �nq p� T3328rsi vQreeer• .pis- •�� ,a,zrzois I J LEGENn CURB & GUTTER A C. CEN-MRL.U",IE - - - - -------� CITY OF NEWPORT BEACH I ADDRESS .9 V it ENCROACHMENT PERMIT ! APPLICANT l<1L.W we OWNER DESCRIPTION OF WORK Permit No. 2011--cm —3 CITY OF NEWPORT BEACH APPLICATION FOR WATER METER OR HYDRANT METER REQUESTED BY ?f b r, V e (entity who is requesting meter and/or would get hydrant deposit rafund) MAILING ADDRESS3SL+1RECEIPT# CITY/STATE/ZIP r� ' !A PHONE # SERVICE ADDRESS Pd SkeA-�fd, SE'�%ilvEJSTEC1..i�edi� atl ,thatTl ; , r Hydrant Meter Deposit required (tapping order) ( ) New Meter New service address (tapping order) New Meter at existing service address (tapping order) {Meter Upgrade Existing service address (work order) ( ) Irrigation only ( ) Commercial Location (•Residential Location {) Fire Connection Fee $ ter Size I Va L Fee $ Gj . r T () 4TT Box Fee $ ( Meter box & Lid - Alley/Traffic Area Fee $ or Parkways/Sidewalk Fee $ S • c15 Total Fees $ Encroachment Permit Number: �% 1 C% i �� - (;� i Ui >e : artlt�+vn, i' Njjdr� ratr pt Customer Name (property owner) ruS Billing Address JQ ke w City/Zip to E Residence Phone # Business Phone # E-Mail Address Social Security # or CA Drivers License CLERK FOR OFFICE USE ONLY DATE BUS LIC # DATE UTILITIES COMPLETED DATE HYDRANT METER CLOSED NEW ACCOUNT NUMBER WORK/TAPPING ORDER NUMBER flusers/rev/shared/water/water meter sery app 05/23/16 NOTES MID# ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed I certify that I have a Certificate of consent to self -insure, Certificate of Worker's contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of Compe atjon insurance, or a Certified C y thereof. ()L�� u 1 a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days Date: �� Signature 1 after date of issuance. CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent. officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit. any person so as to become subject to California Worker's Compensation Laws. If, 3 All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. provisions of the State Labor Code, I must comply with the provisions of Section 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall 3700 or this permit shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director. 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or CONTRACTOR LICENSE EXEMPTION connection to sewer lines a valid State Contractor License Class C-42 is required. 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. HOLD HARMLESS STATEMENT 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities encroachments. I will be responsible for replacing the improvements if the City Department or General Services Department inspections may be required depending on scope of work performed. removes them for maintenance of utilities or other public need. I shall indemnify 8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed and hold the City harmless for any liability associated with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (i& water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot encro � m ` t$ 1 clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a v Date: Signature: 4TT box over the riser. 24-hour notice for Encroachment Permit Inspection is required by calling 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All "Manual signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of Public Works at 949-644-3311. Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 15. Any above ground utility facilities will require documented approval from the adjacent per barricade per day; with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. affected property owner(s). 10. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water weekend, summer between June 15 and September 15, and during the holiday season from December 19 to Quality Laws. Best Management Practices will be enforced. It is against the law to 1 1. January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to discharge construction debris into the gutter and storm drain. Felony violations of Water acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill. emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control 17 If a refundable deposit was paid, applicant must submit a Soils Compaction Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by Certificate or Evidence of a Slurried Backfill and request a final inspection from the the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way Public Works Department. Monies may be held for six months after final inspection will require a Caltrans Permit. All vehicles shall be lawfully parked. before a refund will be processed. 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. without approval from the General Services Department. 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant 19, All work in the public right-of-way must meet the approval of the Public Works must notify all affected residents 24 hours in advance of restricted access and any inconveniences. Department or corrections will be required (i.e. removals, exposing connections, 14. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City etc.). Additional inspection fees may be required. may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 20. Permit is for standard materials in the public right-of-way only, unless previously for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a approved by Public Works and an Encroachment Agreement has been processed. Temporary Street Closure Permit must be obtained from the Public Works Department. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit $hall be performed until the Public Works Department has issued this permit. Applicant hereby ack owledges he/she has read and understands the terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work Is not commenced within 30 days after issuance. Permit fees nonrefundable. Dater are 3/27/2018 City of Newport Beach Page 5 of 9 4:30:46PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 03/28/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1836 PORT SHEFFIELD PL Activity : N2017-0473 SubType : NEW Status : APPROVED OWNER: PORT SHEFFIELD 1836 TRUST Phone : APPLICANT: COAST WATER & POWER Phone : 949-548-0106 949-289-0078 mikekilbride@live.com Description : INSTALL 2" WATER SERVICE PER STD 503-L FOR 1 1/2" METER. ta Item: 10215 ROUGH UTIL Requested Time: 3/28/2018 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER Comments: AM - Assigned to: 77777777777* Inspector: V14 Date: Time: PM Comments: F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc REPT131 Run Id: 4018 1/2/2019 City of Newport Beach Page 10 of 17 4:30:32PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 01/03/2019 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1836 PORT SHEFFIELD PL Activity : N2017-0473 SubType : NEW Status : APPROVED OWNER : PORT SHEFFIELD 1836 TRUST Phone : APPLICANT: COAST WATER & POWER Phone : 949-548-0106 949-289-0078 mikekilbdde@live.com Description: INSTALL 2" WATER SERVICE PER STD 503-L FOR 1 1/2" METER. Item: 10250 FINAL - PW Requested Time: 1/3/2019 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER Comments: ANY - Assigned to: zzzzzzzzzzz* 0 /Z� VV COMPLETED