TITLE: 2018-2019 Playground Improvements Project — Award of Contract
No. 7582-1 (19P01)
ABSTRACT:
Staff has received bids for the 2018-2019 Playground Improvements Project and is
requesting City Council approval to award the work to R.E. Schultz Construction, Inc.
(R.E. Schultz), of Orange.
RECOMMENDATION:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301_Class 1 (Existing Facilities) and Sec. 15302_Class 2
(Replacement or Reconstruction) of the CEQA Guidelines, because this involves
maintenance of existing facilities and will be reconstructing existing facilities on the
same site as the structure [facility] replaced. The project will have substantially the
same purpose and capacity as the structure [facility] replaced;
b) Approve the project drawings and specifications;
c) Award Contract No. 7582-1 to R.E. Schultz for the total bid price of $188,645.00, and
authorize the Mayor and City Clerk to execute the contract;
d) Establish approximately $20,000.00 (approximately 10 percent), contingency amount
to cover the cost of unforeseen work not included in the original contract; and
e) Approve Budget Amendment No. 19BA-042 transferring $28,000.00 of project savings
in Jasmine Creek Maintenance Road Reconstruction to 2018-2019 Playground
Improvements.
FUNDING REQUIREMENTS:
Upon approval of the Budget Amendment 19BA-042, to transfer project savings from the
Jasmine Creek Maintenance Road Reconstruction project into this Playground
Improvements project, sufficient funding will be available for the award of this contract.
5-1
2018-2019 Playground Improvements Project — Award of Contract No. 7582-1 (19P01)
April 23, 2019
Page 2
Since the budget amendment transfers existing appropriations, there is no further impact
on fund balance.
The following funds will be expensed:
Account Description
General Fund
Account Number
Amount
01201929-980000-19P01 $ 213,645.00
Total: $ 213,645.00
Proposed uses of funds are as follows:
Vendor Purpose Amount
R.E. Schultz Construction Contract $ 188,645.00
R.E. Schultz Construction Contingency $ 20,000.00
Various Incidentals, Printing $ 5,000.00
Total: $ 213,645.00
DISCUSSION:
At 10 a.m. on April 4, 2019, the City Clerk opened and read the following bids for this
project:
Bidder
Low R.E. Schultz
2nd Tot Lot Pros
3rd JMJ Construction
Base Bid Amount
$ 188,645.00
$ 200,005.20
$ 200,608.00
The base bid amount submitted by the low bidder, R.E. Schultz, is one percent less than
the Engineer's Estimate of $200,000.00. R.E. Schultz possesses a valid and current
California State Contractor's License A with C -61/D-34 (Prefabricated Equipment) and a
subcontractor who holds a C -61/D-12 (Synthetic Products) license, as required by the
contract documents. A check of the Contractor's references indicates satisfactory
completion of similar projects for Newport Beach and other local municipalities. R.E.
Schultz currently holds an on-call maintenance/repair services agreement with the City
for playground equipment installation services.
The work necessary for the completion of this contract consists of removing and disposing
of existing improvements, including current rubber surface wear course and playground
equipment; furnishing and installing flexible play surface systems; installing City -
purchased playground equipment at Eastbluff, Channel Place and Cliff Drive parks; and
other incidental items to complete the work in place as required by the contract
documents.
The design and play components proposed for Channel Place and Eastbluff parks were
determined based on community input received at two publicly noticed meetings. The
proposed Channel Place playground components are accessible from the ground level.
The proposed Eastbluff play equipment will have ground level components, as well as
elevated components that will be accessible via a transfer platform.
5-2
2018-2019 Playground Improvements Project — Award of Contract No. 7582-1 (19P01)
April 23, 2019
Page 3
Ground level components include the Talk Tube, Clubhouse and Image Reach Panel.
Accessible elevated components include the Clatter Bridge with Barriers, Cliff Climber,
Double Slide, Loop Pole, Match 4 Panel, Slidewinder2 and Zoo Panel. The project
proposes to expand the rubber surfacing area at both locations for increased accessibility.
Pursuant to the contract documents, the contractor will have 40 consecutive working days
to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301, Class 1 (Existing Facilities)
and Sec. 15302, Class 2 (Replacement or Reconstruction) of the CEQA Guidelines,
California Code of Regulations, Title 14, Chapter 3, because this involves maintenance
of existing facilities and will be reconstructing existing facilities on the same site as the
structure [facility] replaced. The project will have substantially the same purpose and
capacity as the structure [facility] replaced.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Budget Amendment
5-3
Attachment A
JOHN WAYNE
AIRPORT
NOT TO SCALI
2018-2019 PLAYGROUND CITY OF NEWPORT BEACH
IMPROVEMENTS PROJECT I PUBLIC WORKS DEPARTMENT
LOCATION MAP I C-7582-1 I 04/23/19
5-4
ATTACHMENT B
City of Newport Beach
BUDGET AMENDMENT
2018-19
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
Increase Expenditure Appropriations
X Transfer Budget Appropriations
SOURCE:
X from existing budget appropriations
from additional estimated revenues
from unappropriated fund balance
EXPLANATION:
NO. BA- 19BA-042
AMOUNT:j $28,000.00
This budget amendment is requested to provide for the following:
To transfer expenditure appropriations from the closure of the Jasmine Creek Maintenance Road Reconstruction project (19P13)
to CIP Playground Improvement project (19P01).
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Object
REVENUE ESTIMATES
Ong Object Project
EXPENDITURE APPROPRIATIONS
Org Object Project
01201929 980000 19P13
01201929 980000 19P01
Description
Description
Description
CIP Jasmine Creek Maintenance
CIP Playground Refurbishment
1pned: b k� /�,/lrCe,
Financial Approval: Finance Director
Signed:
City Council Approval: City Clerk
Amount
Debit Credit
$28,000.00
* Automatic
$28,000.00
4—/()—/
Date
Date
5-5
Increase in Budgetary Fund Balance
AND
Decrease in Budgetary Fund Balance
X
No effect on Budgetary Fund Balance
ONE-TIME?
FXI
Yes
No
This budget amendment is requested to provide for the following:
To transfer expenditure appropriations from the closure of the Jasmine Creek Maintenance Road Reconstruction project (19P13)
to CIP Playground Improvement project (19P01).
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Object
REVENUE ESTIMATES
Ong Object Project
EXPENDITURE APPROPRIATIONS
Org Object Project
01201929 980000 19P13
01201929 980000 19P01
Description
Description
Description
CIP Jasmine Creek Maintenance
CIP Playground Refurbishment
1pned: b k� /�,/lrCe,
Financial Approval: Finance Director
Signed:
City Council Approval: City Clerk
Amount
Debit Credit
$28,000.00