Loading...
HomeMy WebLinkAboutX2019-0202 - MiscX20161- 0202 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 I Newport Beach, CA 92658 www.newoortbeachca.aov I (949) 644-3200 SPECIAL.INSP.ECTION REPORT Project Address: % N(1a,q 7r bett4 Cark - Permit Number: Y20t a C3202_ Inspection Type (s): n?oy ePAef) f C'd i c/e-it /11n C�d rS Inspection Date (s): �t') /q I hoo3 Dr. ( ) Periodic (4-Continuous �.i1 I as ,� ��.��.t �8�.�� 6� L - .. 3.. `� x2 �.,.. �.�1..[ a l h0 1�-s -Pot- condense . ► cf ke 2- ,S �i.00 o�f a Ve c pi cui$ • ; -1 csf7 `Tay- .c wrench i.EdFM Se�'jq( D812072.8 s n2.f1or) /8! 20.1.q To the best of my knowledge, the work Inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. SpecialinspectionReport 8-2415 BUILDING ENERGY ANALYSIS REPORT PROJECT: 611o4 2om X2) l 0202 1 -Da,9 Pr. HOAG Data Center - 1st Floor Interior T.I. Newport Beach, CA Project Designer: Report Prepared by: LAL B. SAHGAL LSA CONSULTING ENGINEERS 83, WINDSWEPT WAY MISSION VIEJO, CA. 92692 (949)830-4746 Job Number: Date: 1/15/2019 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards. This program developed by EnergySoft Software — www.energysoft.com. TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MCH-01-E Prescriptive - Mechanical Systems 3 Form MCH-02-E Prescriptive - HVAC System Requirements 7 Form MCH-03-E Prescriptive - Mechanical Ventilation and Reheat 10 Form MCH-04-E Prescriptive - Required Acceptance Tests 12 Form MCH-05-E Prescriptive - Requirements for Packaged Single Zo 15 Form MCH-07-E Prescriptive - Fan Power Consumption 17 HVAC System Heating and Cooling Loads Summary 19 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 1 of 4) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1 /15/2019 A. MECHANICAL COMPLIANCE DOCUMENTS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2016 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. YES NO Comp. Doc./Worksheet # Title El 0 NRCC-MCH-01-E (Part 1 of 3) Certificate of Compliance, Declaration. Required on plans for all submittals. El 0 NRCC-MCH-01-E (Part 2 of 3) Certificate of Compliance, Required Acceptance Tests (MCH-02-A to 11-A). Required on plans for all submittals. ❑ 0 NRCC-MCH-01-E (Part 3 of 3) Certificate of Compliance, Required Acceptance Tests (MCH-12-A to 18-A). Required on plans where applicable. El 0 NRCC-MCH-02-E (Part 1 of 2) Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans. 0 0 NRCC-MCH-02-E (Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water systems. It is optional on plans. �] 0 NRCC MCH 03 E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is optional on plans. ® 0 NRCC-MCH-07-E (Part 1 of 2) Power Consumption of Fans. Required on plans where applicable El 0 NRCC-MCH-07-E (Part 2 of 2) Power Consumption of Fans, Declaration. Required on plans where applicable CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 01/16) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-01-E Mechanical Systems (Page 2 of 4) Project Name HOAG Data Center - 1st Floor Interior T.I. Date Prepared. 1/15/2019 B. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents) Test Performed By: Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck —The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. Test Description MCH-02-A MCH-03-A MCH-04-A MCH-05-A MCH-06-A MCH-07-A MCH-08-A MCH-09-A MCH-10-A MCH-11-A Equipment Requiring Testing or Verification # of Units Outdoor Air Single Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation (DCV) Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control LG ARNU36 2 m m 0 0 0 0 0 0 0 0 ❑ ❑ 0 0 0 0 0 0 0 0 ❑ ❑ 0 0 0 0 0 0 0 0 ❑ ❑ 0 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 0 0 0 0 0 ❑ ❑ 0 ❑ 0 0 0 0 0 0 ❑ ❑ 0 0 0 0 0 0 0 0 ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 3 of 4) Project Name' HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1 /1 5/201 9 C. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents) Test Performed By: Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck — The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations. Test Description MCH-12-A MCH-13-A MCH-14-A MCH-15-A MCH-16-A MCH-17-A MCH-18-A Equipment Requiring Testing or Verification # of Units Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Supply Air Temperature Reset Controls Condenser Water Reset Controls ECMS LG ARNU36 2 0 0 0 0 0 0 0 ❑ 0 0 0 0 ❑ 0 ❑ 0 0 0 0 0 0 ❑ 0 0 0 0 0 0 ❑ 0 0 0 0 0 0 ❑ 0 0 0 0 0 0 ❑ 0 0 0 ❑ 0 0 ❑ 0 0 0 0 0 0 ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E Mechanical Systems (Page 4 of 4) Project Name: HOAG Data Center- 1st Floor Interior T.I. Date Prepared: 1 /1 5/201 9 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL Documentation Author Signature: �G[� Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/ HERS Certification Identification (if applicable): M26885 City/State/Zip: MISSION VIEJO, CA. 92692 Phone: (949)8304746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Lal Sahgal, P. E Responsible Designer Signature: Lae �L� Company : LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip: Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC DRY & WET SYSTEM REQUIREMENTS CALIFORNIA ENERGY COMMISSION CEC-NRCC-MCH-02-E (Revised 01/16 CERTIFICATE OF COMPLIANCE N RCC-MCH-02-E HVAC Dry & Wet System Requirements (Page 1 of 3) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 A. Equipment Tags and System Description' - Dry Systems FC-1 &2/CU-1 MANDATORY MEASURES T-24 Sections Reference to the Requirements in the Contract Documents2 Heating Equipment Efficiency3 110.1 or 110.2(a) Sheet M1 Cooling Equipment Efficiency3 110.1 or 110.2(a) Sheet M1 HVAC or Heat Pump Thermostats 110.2(b), 110.2(c) Sheet M1 Furnace Standby Loss Control 110.2(d) Sheet M1 Low Leakage AHUs 110.2(f) Sheet M1 Ventilation4 120.1(b) Sheet M1 Demand Control Ventilations 120.1(c)4 Sheet M1 Occupant Sensor Ventilation Controls 120.1(c)5, 120.2(e)3 Shcct M1 Shutoff and Reset Controls 120.2(e) Shcct M1 Outdoor Air and Exhaust Damper Control 120.2(f) Sheet M1 Isolation Zones 120.2(g) Sheet M1 Automatic Demand Shed Controls 120.2(h) Sheet M1 Economizer FDD 120.2(i) Duct Insulation 120.4 Sleet M1 PRESCRIPTIVE MEASURES Sheet M1 Equipment is sized in conformance with 140.4(a & b) 140.4(a & b) Y Y/N Y/N Y/N Supply Fan Pressure Control 140.4(c) Sheet M1 Simultaneous Heat/Cools 140.4(d) Sheet M1 Economizer 140.4(e) Sheet M1 Heat and Cool Air Supply Reset 140.4(f) Sheet M1 Electric Resistance Heating9 140.4(g) Sheet M1 Duct Leakage Sealing and Testing'0 140.4(1) Sheet M1 Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 201601 et seq. 4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central unit schedules and sequences of operation. If one or more spaces is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH-03-E compliance document. 5. If one or more spaces has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation. 6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation 7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required). For all systems identify the specification for the thermostats and time clocks (if applicable). 8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the specification of the zone controls. Provide a MCH-03-E compliance document. 9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH-04-A compliance document must be submitted. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC DRY & WET SYSTEM REQUIREMENTS CALIFORNIA ENERGY COMMISSION CEC-NRCC-MCH-02-E (Revised 01/16 CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Dry & Wet System Requirements (Page 2 of 3) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 B. Equipment Tags and System Description' — Wet Systems MANDATORY MEASURES T-24 Sections Reference to the Requirements in the Contract Documents2 Heating Hot Water Equipment Efficiency3 110.1 Cooling Chilled and Condenser Water Equipment Efficiency3 110.1, 140.4(i) Open and Closed Circuit Cooling Towers conductivity or flow -based controls 110.2(e) 1 Open and Closed Circuit Cooling Towers Maximum Achievable Cycles of 110.2(e) 2 Concentration (LSI)6 Open and Closed Circuit Cooling Towers Flow Meter with analog output 110.2(e) 3 Open and Closed Circuit Cooling Towers Overflow Alarm 110.2(e) 4 Open and Closed Circuit Cooling Towers Efficient Drift Eliminators 110.2(e) 5 Pipe Insulation 120.3 PRESCRIPTIVE MEASURES Cooling Tower Fan Controls 140.4(h)2, 140.4(h)5 Y/N Y/N Y/N Cooling Tower Flow Controls 140.4(h)3 Centrifugal Fan Cooling Towers4 140.4(h)4 Air -Cooled Chiller Limitations 140.4(j) Variable Flow System Design 140.4(k) Chiller and Boiler Isolation 140.4(k) CHW and HHW Reset Controls 140.4(k) WLHP Isolation Valves 140.4(k) VSD on CHW, CW & WLHP Pumps>5HP 140.4(k) DP Sensor Location 140.4(k) Notes: 1. Provide equipment tags (e.g. CH 1 to 3) or system description (e.g. CHW loop) as appropriate. Multiple units with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full- and part -load) include all. For chillers operating at non-standard efficiencies provide the Kadj values. For chillers also note whether the efficiencies are Path A or Path B. 4. Identify if cooling towers have propeller fans. If towers use centrifugal fans document which exception is used. 5. If air-cooled chillers are used, document which exceptions have been used to comply with 140.4(j) and the total installed design capacity of the air-cooled chillers in the chilled water plant. 6. Identify the existence of a completed MCH-06-E when open or closed circuit cooling towers are specified to be installed, otherwise enter "N/A". CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA HVAC SYSTEM REQUIREMENTS CALIFORNIA ENERGY COMMISSION CEC-NRCC-MCI-02-E (Revised 06/14 CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E HVAC Wet System Requirements (Page 3 of 3) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL Documentation Author Signature: / _ /% c.5-, Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/ HERS Certification Identification (if applicable): M26885 City/State/Zip: MISSION VIEJO, CA. 92692 Phone: (949)830-4746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner a aat occupancy. Responsible Designer Name: Lal Sahgal, P. E Responsible Designer Signature: / /f c5,LZ/�/ company: LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip: Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 05/16) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-MCH-03-E Mechanical Ventilation & Reheat (Page 1 of 2) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 A. Mechanical Ventilation and Reheat ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC) AREA BASIS OCCUPANCY BASIS ROOM BASIS MINIMUM VAV Reheated Primary Air CFM VAV Deadband Primary Air CFM 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 ZONE/ SYSTEM/ VAV BOX TAG DESIGN PRIMARY COOLING AIRFLOW (CFM) DESIGN PRIMARY DEADBAND AIRFLOW (CFM) DESIGN PRIMARY HEATING AIRFLOW (CFM) CNTRL TYPE DDC (Y/N) TRANSFER AIRFLOW (CFM) 0 w z E S a z O U ' _' MIN CFM PER AREA MIN CFM BY AREA NUM. OF PEOPLE CFM PER PERSON MIN CFM BY OCCUPANT MIN CFM BY ROOM REQ'D VENT AIRFLOW (CFM) COMPLIES? PERCENTAGE BASED DESIGN PRIMARY COOLING AIR (CFM) MAXIMUM REHEAT (CFM) COMPLIES? BASED DESIGN PRMY COOLNG AIR (CFM) MAX DEAD -BAND AIRFLOW (CFM) COMPLIES? First Floor Zone 800 240 400 Y 320 0.15 48 0.4 50.0 20 48 tg Pass ❑ Fail 400 400 X Pass 0 Fail ❑ N/A 160 160 ❑ Pass Fail ❑ N/A Total 48 ❑Pass ❑ Fail ❑ Pass 0 Fail ❑ N/A 0 Pass ❑Fail ❑ N/A ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ N/A 0 Pass 0 Fail ❑ N/A O Pass O Fail ❑ Pass ❑ Fail ❑ N/A ❑ Pass 0 Fail ❑ N/A ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ N/A 0 Pass 0 Fail ❑ N/A ❑ Pass ❑ Fail ❑ Pass 0 Fail ❑ N/A 0 Pass 0 Fail ❑ N/A ❑ Pass 0 Fail ❑ Pass ❑ Fail ❑ N/A 0 Pass 0 Fail ❑ N/A CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance May 2016 STATE OF CALIFORNIA MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 05/16 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-03-E Mechanical Ventilation & Reheat (Page 2 of 2) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL Documentation Author Signature: / // 5'G�!/! Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/ HERS Certification Identification (if applicable): M26885 city/state/zip: MISSION VIEJO, CA. 92692 Phone: (949)830-4746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Lal Sahgal, P. E _ /f 5GZ/�! /J Responsible Designer Signature: Led �� company: LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip: Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance May 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 01/16 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-04-E Required Acceptance Tests (Page 1 of 3) Project Name: HOAG Data Center- 1st Floor Interior T.I. Date Prepared: 1 /155/201 9 A. MECHANICAL COMPLIANCE FORMS & WORKSHEETS (indicate if worksheet is included) For detailed instructions on the use of this and all Energy Standards compliance documents, refer to the 2016 Nonresidential Manual Note: The Enforcement Agency may require all compliance documents to be incorporated onto the building plans. The NRCC-MCH-04-E and NRCC-MECH-05-E are alternative compliance documents to NRCC-MCH-01-E, NRCC-MCH-02-E and NRCC-MCH-03-E for projects using only single zone packaged HVAC systems. YES NO Form Title ✓ NRCC-MCH-04-E (1 of 2) Certificate of Compliance. Required on plans when used. ✓ NRCC-MCH-04-E (2 of 2) Mechanical Acceptance Tests. Required on plans when used. ✓ NRCC-MCH-05-E (1 of 2) HVAC Prescriptive Requirements. It is required on plans when used. ✓ NRCC MCH 05 E (2 of 2) Mechanical SWH Equipment Summary is required for all submittals with service water heating, pools or spas. It is required on plans where applicable. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 01/16) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-MCH-04-E Required Acceptance Tests (Page 2 of 3) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1 /1 5/201 9 Designer: This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this compliance document will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance. Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The NRCC-MCH-04-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed and replaced equipment. In addition a Certificate of Acceptance documents shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. The building inspector must receive the properly filled out and signed compliance documents before the building can receive final occupancy. Test Description MCH-02-A MCH-03-A MCH-04-A MCH-05-A MCH-06-A MCH-07-A MCH-11-A MCH-12-A MCH-14-A MCH-18-A Test Performed By: Equipment Requiring Testing or Verification # of Units Outdoor Air Single Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation (DCV) Supply Fan VAV Automatic Demand Shed Control FDD for Packaged DX Units Distributed Energy Storage DX AC Systems Energy Management Control System LG ARNU3E 2 ✓ ✓ CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 01/16) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION N RCC-MCH-04-E Required Acceptance Tests (Page 3 of 3) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1 /1 5/201 9 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL Documentation Author Signature: c5" .7..ed Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/ HERS Certification Identification (if applicable): M26885 City/State/Zip: MISSION VIEJO, CA. 92692 Phone: (949)8304746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part land Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Lal Sahgal, P. E Responsible Designer Signature: / /J 5,Ct�`V Company : LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip:Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 01/16) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-05-E Requirements for Packaged Single -Zone Units (Page 1 of 2) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1 /15/2019 Equipment Tag(s)1 FC-1 &2/CU-1 MANDATORY MEASURES T-24 Sections Requirement3 As Scheduled3 Requirement3 As Scheduled3 Requirement3 As Scheduled3 Heating Equipment Efficiency.' 110.1 or 110.2(a) 7.70 HSPF 8.00 HSPF Cooling Equipment Efficiency.' 110.1 or 110.2(a) 13 SEER 14.0 SEER / 1; Thermostat? 110.2(b), 110.2(c) Setback Setback Furnace Standby Loss Controls 110.2(d) _n/a Low Leakage AHU 110.2(f) NR none Ventilation 120.1(b) 48 20 Demand Control Ventilations 120.1(c)4 NR No Occupant Sensor Ventilation Controls 120.1(c)5, 120.2(e)3 Shutoff and Reset Control? 120.2(e) Req Programmable Outdoor Air and Exhaust Damper Control 120.2(f) Req Gravity Automatic Demand Shed Controls 120.2(h) NR none Economizer FDD 120.2(i) NK No Duct Insulation 120.4 R-8 R-8.0 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4(a & b) -2,391 Btu/hr 55,079 Btu/hr 140.4 (a & b) 59,588 Btu/hr 55,225 Btu/hr Economizer 140.4(e) NR No Economize Electric Resistance Heating10 140.4(g) No No Duct Leakage Sealing and Testing." 140.4(1) NR No Notes: 1. Provide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas -pack or heat pump; rated heating capacity (enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling). For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement"). In the right column (under "As Scheduled") enter the value for the units as specified. 4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heat pump with electric heat), . In the right column indicate the capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at z225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh indicate "N/A". 7. In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum ventilation as scheduled. If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column) 9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH-04-A compliance document must be submitted. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE N RCC-MCH-05-E Requirements for Packaged Single -Zone Units (Page 2 of 2) Project "ame: HOAG Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL _ // SGZ/G Documentation Author Signature: La, /� al i Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/HERS Certification Identification (if applicable): M26885 City/State/Zip: MISSION VIEJO, CA. 92692 Phone: (949)830-4746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Lal Sahgal, P.E Responsible Designer Signature: Lai c5"ei _ _ /% i/�CyCLCi company: LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip: Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE OF CALIFORNIA FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 01/16 CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-07-E Power Consumption of Fans Requirements (Page 1 of 2) Prgect Name: HOA G Data Center - 1st Floor Interior T.I. Date Prepared: 1/15/2019 A. Constant Volume Fan Systems NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c). 01 02 03 04 05 FAN DESCRIPTION DESIGN BRAKE HP EFFICIENCY NUMBER OF FANS PEAK WATTS A02 x A04 x 746 / (A03a x AO3b) MOTOR DRIVE FC-1&2/CU-1 - Supply Fan 0.500 85.5 % 97.0 % 2.0 899 B. Variable Air Volume Fan Systems NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c). 01 02 03 04 05 FAN DESCRIPTION DESIGN BRAKE HP EFFICIENCY NUMBER OF FANS PEAK WATTS B02 x B04 x 746 / (B03a x B03b) MOTOR DRIVE C. Totals and Adjustments FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on row 7 01 TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F) 899 W 02 SUPPLY DESIGN AIRFLOW 2,514 CFM 03 TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1 0.358 W/CFM 04 SPa in W.0 or Pa 05 SPf in W.0 or Pa 06 Fan Adjustment = 1-(SPa— 1)/SPf 07 ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.358 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 STATE'OF CALIFORNIA FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised MM/YY) CERTIFICATE OF COMPLIANCE CALIFORNIA ENERGY COMMISSION NRCC-MCH-07-E Power Consumption of Fans Requirements (Page 2 of 2) Project Name: HOAG Data Center - 1st Floor Interior T.I. Date PrePared:l /15/2019 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: LAL B. SAHGAL Documentation Author Signature: / /f 5,GZ��! /J Company: LSA CONSULTING ENGINEERS Signature Date: 1/15/2019 Address: 83, WINDSWEPT WAY CEA/ HERS Certification Identification (if applicable): M26885 city/state/zip: MISSION VIEJO, CA. 92692 Phone: (949)830-4746 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Lal Sahgal, P.E Responsible Designer Signature: /_/J 5, ,[��{/ company: LSA Consulting Engineers Date Signed: Address: 83, Windswept Way License: M26885 City/State/Zip: Mission Viejo, CA 92692 Phone: CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name HOAG Data Center - 1st Floor Interior T.I. Date 1/15/2019 System Name FC-1&2/CU-1 Floor Area 320 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 36,000 Total Room Loads 2,200 41,901 160 25 564 Total Output (Btuh) 72,000 Return Vented Lighting 0 Output (Btuh/sqft) 225.0 Return Air Ducts 2,095 28 Cooling System Return Fan 0 0 Output per System 36,000 Ventilation 20 84 170 20 777 Total Output (Btuh) 72,000 Supply Fan 3,070 -3,070 Total Output (Tons) 6.0 Supply Air Ducts 2,095 28 Total Output (Btuh/sqft) 225.0 Total Output (sqft/Ton) 53.3 TOTAL SYSTEM LOAD 49,246 330 -1,672 Air System CFM per System 1,257 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,514 LG ARNU36 55,225 16,545 55,079 Airflow (cfm/sqft) 7.86 Airflow (cfm/Ton) 419.0 Outside Air (%) 0.8 % Total Adjusted System Output 55,225 16,545 55,079 Outside Air (cfm/sgft) 0.06 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 1 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 70 °F 71 °F 91 °F _., „, cr II Outside Air 0.---- _____, _ ____,— 1 20 cfm Supply Fan Heating Coil 91 2,514 cfm °F ROOM 70 °F 70 °F I TTI _.._L_ 1 COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 79/65°F 75/61°F 76/62°F 56/54°F ,__ cr „; Outside Air (; IIL _. / 20 cfm Supply Fan Cooling Coil 56 / 55 °F 2,514 cfm 47.8 °%° ROOM 75/61 °F 74/61 °F I t