City Council Staff Report
<i FO RN
May 14, 2019
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Patrick Arciniega, Senior Civil Engineer
parciniega(a�-newportbeachca.gov
PHONE: 949-644-3347
TITLE: Jamboree Road Median Landscape Turf Replacement Project —
Notice of Completion for Contract No. 8151-2 (161-02)
ABSTRACT:
On November 13, 2018, City Council awarded Contract No. 8151-2 for the Median
Landscape Turf Replacement project on Jamboree Road from Ford Road to University
Drive to Conserve LandCare. The work is complete and staff requests City Council
acceptance and close out of the contract. The maintenance period will end on June 10,
2019.
RECOMMENDATION:
a) On November 13, 2018, the City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15302(c);
b) Accept the completed work and authorize the City Clerk to file a Notice of Completion
for the project; and
c) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the
Notice of Completion has been recorded in accordance with applicable portions of
Civil Code, and release Faithful Performance Bond one year after acceptance by the
City Council.
FUNDING REQUIREMENTS:
The construction contract was expensed from the following accounts:
Account Description Account Number Amount
Environmental Contributions 13801-980000-161-02 $ 223,180.90
Neighborhood Enhancement 53601-980000-161-02 $ 283,352.01
Total: $ 506,532.91
5-1
Jamboree Road Median Landscape Turf Replacement Project —
Notice of Completion for Contract No. 8151-2 (161-02)
May 14, 2019
Page 2
The City anticipated up to $225,000 in total rebate revenue from the Municipal Water
District of Orange County (MWDOC) for this project; however, based on reduced square
footage calculations during the final inspection, the City received $223,180.90 in rebates.
DISCUSSION:
Overall Contract Cost/Time Summary
Awarded
Final Cost at
Contingency
Actual
% Due to
% Due to
Contract Amount
Completion
Allowance
Contract
Directed
Unforeseen
Change
Change
Change
$501,089.61
$506,532.91
10% or less
1.1%
0.48%
0.53%
Allowed Contract Time +
74
Actual Time
-7
Approved Extensions (days) =
Under (-) or Over (+)
During the recent drought, state regulations were enacted prohibiting use of potable water
to irrigate medians planted with turf grass. To comply with this new requirement as well
as reduce water demand, the irrigation on this median was turned off and staff proposed
this project to remove the existing turf grass and replace it with a new California friendly
drought tolerant landscape palette.
The work necessary for the completion of this contract consisted of clearing and grubbing,
landscape replacement and maintenance, irrigation system improvements, and all other
incidental items of work necessary to complete the work in place.
The contracted work has been completed to the satisfaction of the Public Works
Department. A summary of the construction cost is as follows:
Original bid amount:
$501,089.61
Actual Cost of Bid Items Constructed:
$494,688.15
Total Change Orders:
$11,844.76
Final Contract Cost:
$506,532.91
Less plants were needed than originally estimated, resulting in a $6,401.46 cost
reduction. In an effort to reduce initial project cost, the project strived to reuse the majority
of the existing irrigation system rather than installing a completely new system. However,
additional minor modifications to the irrigation system were required once construction
began to insure the system was sound and operated within expectations. Four change
orders totaling $11,844.76 were approved that were related to modifications to the
existing irrigation system. With the completion of the project, the final contract cost is
approximately 1.1 percent above the original bid amount.
A summary of the project schedule is as follows:
Estimated Start of Construction per Annual Baseline Schedule November 26, 2018
Actual Start of Construction Per Notice to Proceed December 3, 2018
Extended Contract Completion Date Inclusive of Extra Work March 18, 2019
Actual Substantial Construction Completion Date March 11, 2019
5-2
Jamboree Road Median Landscape Turf Replacement Project —
Notice of Completion for Contract No. 8151-2 (16L02)
May 14, 2019
Page 3
The project was substantially complete on March 11, 2019 with all landscaping
improvements completed to the satisfaction of the Public Works Department. Due to
several rainy days during the project construction, the original contract completion date
was extended to March 18, 2019.
ENVIRONMENTAL REVIEW:
On November 13, 2018, City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15302(c) Class 2 (reconstruction
of existing public facilities involving negligible or no expansion of capacity) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
5-3
MATCHLINE - SEE RIGHT
&Z
LIMITS OF WORK
ATTACHMENT A
MATCHLINE - SEE LEFT
JAMBOREE ROAD MEDIAN LANDSCAPE TURF
REPLACEMENT IMPROVEMENTS
LOCATION MAP
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
161-02 5/14/19