Loading...
HomeMy WebLinkAboutS2019-0083 - Alternative Material & Methods��,EWPo CITY OF NEWPORT BEACH 1i COMMUNITY DEVELOPMENT DEPARTMENT S BUILDING DIVISION �o~ 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 °'lucoat` www.newDortbeachca.aov 1 (949) 644-3200 CASE NO.: ZOIC{ �• REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE CODE) OR TITLE 16 (BUILDING CODE) OF THE NEWPORT BEACH MUNICIPAL CODE (See Reverse for Basis for Approval) (Fee $294) ❑X REQUEST FOR ALTERNATE MATERIAL OR METHOD OF CONSTRUCTION (See Reverse for Basis for Approval) (Fee $294) ❑ REQUEST FOR EXEMPTION FROM DISABLED ACCESS DUE TO PHYSICAL OR LEGAL CONSTRAINT (Fee $1,637) (Ratification by the Board of Appeals will be required.) For above requests, complete Sections 1, 2 & 3 below by printing in ink or typing. JOB ADDRESS: FOR STAFF USE ONLY Plan Check # O'ZO n # of Stories Occupancy Classific tion Use of Building CC7 F of Units Project Status k -A Q C4-F,E:CAC- Construction Type,r��Vr(Zi Verified by No. of Items % Fee due DISTRIBUTION: Owner ,Plan Check Petitioner ❑ Inspector Fire ❑ Other SITE ADDRESS: 5 HALF MOON BAY DRIVE Petitioner JONATHAN CARDENAS-CONTRACTOR Owner ALFRED MAYER (Petitioner to be amhifect or engineer) Address 5 HALF MOON BAY DRIVE Address 227 WEST CARLETON AVENUE CORONA DEL MAR Zip 92625 ORANGE, CA Zip 92867 Daytime Phone ( 714 ) 320-0303 Daytime Phone ( 714 ) 497-8339 12 1 REQUEST: Submit Diana if necessary to Illustrate reauest. Additional sheets or data may be attached. II OF EQUIVALENCY: I CODE SECTIONS: Petitioner's Position SR. PERMIT MANAGER Signatu CA Professional Lie. # 571196 Date 05/04/19 DIVISION ACTION 'G6 THE BUILDING BOARD OF APPEALS (See Reverse) it of owner or appli nt, statement of reasons for appeal and fling fees are required.) CASHIER RECEIPT NUMBER: Formsvnodff 09121118 FOR STAFF USE ONLY DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9 (Alternate materials & methods) ❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved By: Date squeal (QpEe) (DOES NOT) lessen any fire protection requirements. Request4DOES) (DOES NOT) lessen the structural integrity ❑ CBC 104.10/CFC 104.8 (CBC Modification) ❑ Written Comments Attached The Request is l ranted ❑ Denied (See reverse for Granted (Ratification required) appeal information) Conditions of Approval: Signature Po "tion tw+r v Print Name Date .� •� • �Oi DIVISION ACTION 'G6 THE BUILDING BOARD OF APPEALS (See Reverse) it of owner or appli nt, statement of reasons for appeal and fling fees are required.) CASHIER RECEIPT NUMBER: Formsvnodff 09121118 Guidelines for Approval of Alternate Materials, Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction, he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must be inconformance with the spirit and purpose of the Code provisions involved and that such modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide sufficient information with this application to allow the above evaluation to be made. Requirements for Submittals The applicant design professional shall prepare a Written Report that describes the altemate proposal along with the applicable data listed below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability, effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative is compatible with balance of code requirements. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information). • Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and where alternate proposal is incorporated within construction plans and prepare plan amendments as .necessary. The design professional has the responsibility to coordinate all construction documents and ensure compatibility between documents. • The report and design documents shall be dated, signed and stamped by the design professional according to the plan submittal procedure. • For alternate methods of design requests, the applicant shall set performance criteria for his design. Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to start of design. Alternative Design Review/Verification The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant— to the Building Division prior to commencing the review. • Verify that all applicable information and justifications listed above as requirements for submittals is received and verify that evaluation and design methods used by designer are appropriate to the alternative proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and possible flaws that could affect performance of material in its installed state. • The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable reason(s). Inspection/Field Verification The alternate proposal as approved in the construction documents must be verified by inspection, and, where necessary, testing as follows: • To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification, quality assurance processes, and testing, as applicable. • When appropriate, an approved third party quality assurance inspection and testing service may be required for continuous and complex inspection and testing activities. This is intended to verify that construction complies with the code and the approved plans. Information on Procedure for Appeal from a Determination or Action by the Chief Building Official or Fire Code Official Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or providing equivalency would create an unreasonable hardship. Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date. "NSF CERTIFIED TO THE ASTM SAFETY SPECIFICATION08 / S I q5dB Horn at 10 Feet This product has been designed to aid in the detection of unwanted intrusions into unsupervised pools. POOLGLIARD IS A SAFETY ALARIVi SYSTEM AND NOT A LIFE SANIING DEVICE. "This device is not intended to replace any other safety consideration - i.e., adult supervision, lifeguards, fences, gates, pool covers, locks, etc., and some devices may not detect gradual entry." • •: • TO 80i SQUARE FOOT EFFECTIVE RANGE PER UNIT -ASTM STANDARD F2208-08 CERTIFIED 116IIII12111112M• WAIIII M A Ia ! =0 E R IKIM CERTIFICATION Mode'NSF International Certifies that the POOLGUARD Pool Alarm ; conforms1 shippingSafety Specification for Residential Pool alarms. POOLGUARD is packaged in a of damage due to handling. eck for damage and confirm that the con - Y following items: *POOLGUARD Unit • Handle • Red Reset/Sleep M • Remote Receiver andPower Supply *Operating If an item is missing, contact either the place of purchase or PBM Industries, Inc. for replacement. CARE , 'D HANDLING • pool. • fallsisturt environment of a swimming against being dropped, kicked, etc. ALWAYS REMOVE THE POOL UNIT FROM THE POOL WHEN THE POOL IS BEING USED. STORE THE ALARM IN THE UPRIGHT POSITION (See Figure 1) AWAY FROM POOL ACTIVITY. If the pool unit accidentally pool, from it, Take the • 1 section and remove the battery. Remove all the water from the inside of the unit, the battery and the circuit board area with a paper towel or cloth. Completely manualthe alarm before each use as described in the OF A CHILDREN. INTERNAL MAGN;:T MAY BE HARMFUL IF SWALLOWED! t7h11111�'.ff9liil#'!� ELECTRONICS% HORN ASSEMBLY — � IT PSd&zt 76;eet "" FIGURE ON/OFF INDICATOR T INTERNAL GREENLEQ BATTERYSCREW HOOKUP t {� HOLDER CABLE ED RESET/SLEEP DECAL RESET/SLEEP KEY UPRIGHT POSITION L 11,. " • M" Figure 2 illustrates locations best suited for detecting intrusions from any area of the pool. If your pool is larger than 800 square feet, if you have more than 2 turn lines, any concerns about the size, or if you have Y pool `y service customer to clarify the recommended number for alarms: 1-800-242-7163. Poo1guard Pool Alarms have been tested and comply to the ASTM Standard Specifications for Residential ASTM alarmspoo or (Cont. on next page) AVU # f # bV�afenjoe or other barner'The fence or a. o TT or greater neignT anove grace, measurea rrom ouisrae orure pint( Brea b. I iinimurn 45 inches spacing of horizontal members when placed on the outside of the fence, c. Maximum 4 inch spacing of vertical members. d Decorative cutouts shalt not exceed 1.75 inches wide. e. Maximum 2 inch vertical clearance between the bottom of the fence and grade, 4 inch maximum above concrete finish, the top 9• h. C, rL for The alarm shall sound continuously for a minimum of 30 seconds within T seconds: e door is 1, at a sound pressure lever of not less than 85"dBA when, measured inside the g at 10 It from the alarm. The alarm shall automatically reset under all conditions. ffl 7 8 ra. b, nd steel. Epoxy coated to local soil conditions; metal piping less than 5 ft horizontally measured from inside pool Wali; vertical structures less than 12 ft vertically above highest water level; steel reinforcing under adjacent walking surfaces, and, all structures or metal fences within 5 ft of the pool or spa. ulation pump must have a time switch that allows the pump to be set to run in etric demand period for the minimum time required to maintain public health mps and Pump motors; only those listed in the Commission's directoryof lent shall be installed. i flow rate shall not exceed that to turn over pool water volume in 6 hours or ver is greater. controls that will default to the filtration flow, rate when ilt to the filtration flow rate setting within 24 hours'. e that provides less pressure drop NSr/A€vSI 50, Efficiency Regulations n toad level rim of such receptor shall be at least`6 inches above the Base -EI indicated in the Flood insurance {date Map as printed by the Federal ement Agency's; Flood Insurance bate Map, (FIRM) revision date vimming pool/spa shall have at least two circulation drains per purnp that ins, suction; outlets that are less than 12 inches across shall be covered with 16. Anti -entrapment grates shall comply with ASMEI Std. At 12,19. hazard 0 Am", SCALE: AS SHOWN BATE: 5/4/19 to • M UJ III UJ C4 CL 1:0 Y • LU LU • LU W a UJ LL Z• • U. W • • Am", SCALE: AS SHOWN BATE: 5/4/19 • M UJ III i CL 1:0 Am", SCALE: AS SHOWN BATE: 5/4/19