Loading...
HomeMy WebLinkAbout16 - Approval and Adoption of the 2019 Water Master Plan (17W02) - PowerPointARCADIS 2019 Water Master Plan law 11 -Ir PFo� May 15, 2019 Item No. 16 2019 Water Master Plan Newport Beach City Council Meeting May 14, 2019 Background and Purpose • Previous Water Master Plan (WMP) was completed in 1999 and updated in 2008 • 2019 WMP reflects recent water demands (2007- 2016) • Incorporates projected water demands and land use from General Plan • Evaluated all water facilities -horizontal (pipelines) and vertical facilities • Conducted risk and condition analysis of our facilities • Prioritize and recommend Capital Improvement Program projects for the next 30 years Water Supply 70% - 75% Groundwater (12, 000 AFY) 22% - 27% Imported (4,000 AFY) THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA Approximately 66,000 CNB Residents 3% Recycled Water (Separate System) Existing System Infrastructure • Serves approximately 66,000 customers over 11 square miles • Approximately 300 storage reservoirs, five pump stations miles of pipelines, three four groundwater wells, and • Five major pressure zones with 43 pressure regulating stations • Six imported water connections with Metropolitan Water District and 12 emergency connections with I RWD and Mesa Water District Water System Modeling • Developed new GIS based hydraulic model • Calibrated model with field measurements • Used model to analyze system performance • Ability to predict impacts to water system due to change in demand / / I / • ..r..._ � • M•. Y �...• rr Y r• �� • YY • r. NM /N0 1 6. m Aging Water Infrastructure • Existing water mains that are 100 years old • Water wells and BCR cover will require rehabilitation and/or replacement • Continue with Cast Iron pipe replacement program • Start Asbestos Cement (AC) pipe replacement program • Transitioning from manual water meters to "smart" meters with our Advance Metering Infrastructure projects Water Main Breaks L.A. NOW SOUTHERN CALIFORNIA -- THIS JUST IN « Previous Post I L.A. NOW Home [ Next Post r7 f 1 u Broken water main creates Newport Beach sinkhole [Updated] OCTOBER 7, 20091 12:09 PM Via Lido by Newport Blvd Jamboree Road by PCH 2019 Proposed 30 -year Water CIP Budget Pipeline Replacement and Relining Facilities Projects Advanced Metering Infrastructure Pressure Reducinq Stations Total (without inflation) Total (with 2.5% inflation per year) Estimated Average Annual Budget $103,540,000 $45,951,000 $14,500,000 1,207,000 $165,198,000 $216,715,000 $7,223,833 Current Water CIP Budgei • Current average CIP budget is approximately $5 million per year • Proposed budget is $7.2 million per year • Additional $2.2 million per year needed to address: ➢ Increase in construction cost ➢ Minimize expensive emergency repairs ➢ Replace aging infrastructure • Proactive approach in the maintenance of our water system prior to failure Recommendation and Next Stepb- 0 Approve and adopt the 2019 Water Master Plan • Include necessary funds in the 2019 Water Rate Study • Review progress of Water Master Plan CIP every 10 years (Council Policy F-2) • Complete water CIP projects as identified in the Master Plan 1 AeO -t,,"01! E N #47F Ck OFT �I Jr wGio- n e 4 do �' `� .y �� 2 � � _ _ -.- _ -- rCry, i • • .moi. r Public Works Department AWell-Engineered Machine Protecting and Providing Quality Public Improvements and Services