Loading...
HomeMy WebLinkAboutN2018-0021������ ������� '� ����� U� ��� ��^�8���� ����^�� �������^ ���� N����� N 1�o������w��m*.ox�� |��=��8����1� ^ Project No Permit Counter Phone (8*8)6*-3811 Online Inspection Request 'v*wwnewportueacmcu.ouv/Online aomiueo Inspection Requests Phone (e*e)a44' oea Job Address: 1401QUAIL STNB Thomam:Guidw: 889F1 Description Replace electrical vault unQuail Street atSpruce Street. Concrete and pavement restoration per City Standards. Parcel #: 4273'320'4 ' LmgmlDemc: P8K44PG38PAR 1 Owner: NEVVPORTPLACE INVESTMENT Contractor: AR|ZONAPIPELINE COMPANY Phone: 8 Phone: 760'244-8212 951'270'3100 Address 14U1QUAIL ST#128 A6dnmaaPOBOX 4O1B85 NEVVPORT8EACH. CA HESPER|A` CAQ234O 0 Contractor State Lic: 423545 Applicant: SOUTHERN CALIFORNIA ED|SDN License Expire: OG3O.2818 Phone: 714'329'2778 [ Address 7333 BOLSA AVENUE VVESTM|NSTER.CA02GO3 Business License 8T38049185 Business Expire: 11 38.3018 Spmdm1Cmnd' Pre-job inspection required. Workers' Compensation Insurance '' Carrier: TRAVELERS PROPERTY CASUALTY Policy No: \TC2JUB9324Q862 W. C.Expire: 0401.2018 Permit Processing Fee $241.80 Sewer Connection $0.00 Total Fee $3.671.00 Agreement Fee: $8.00 47TBox Cover: $0.80 Pmid: $3.671.00 Traffic control Plan Check $130.00 Total Water Meters *U.00 Balance: $0.00 Inspection Fee : $8.308.00 Water Meter Connection $0.80 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $8.00 Street Tree Fee $0.00 Adjustment $0.80 Processed By: Date :�,l Other Department Dmho�___/__/_____ Utilities Approval Date: /�L Permit Denied Daho�___!__�_____ Traffic Approval : Date ��L/ Issued Permit: Date�___/__�L____ General Services Approval Dmhy�___/__��____ ' City of Newport Beach *N2018-0021 * Z 100 Civic Center Drive, Newport Beach, CA 92660 Permit Counter Phone (949)644-3311 n Online Inspection Request - www.newportbeachca.gov / Online e• - Services Job Address Description Parcel # : Legal Desc : Owner: Phone: Address Permit No: N2018-0021 Project No : Inspection Requests Phone (949)644-3255 1401 QUAIL ST NB Thomas:Guide: 889F1 Replace electrical vault on Quail Street at Spruce Street. Concrete and pavement restoration per City Standards. 4273-320-4 - SCANNED P BK 44 PG 38 PAR 1 NEWPORT PLACE INVESTMENT Contractor : ARIZONA PIPELINE COMPANY 0 Phone: 760-244-8212 951-270-3100 1401 QUAIL ST #120 Address : P O BOX 401865 NEWPORT BEACH, CA HESPERIA, CA 92340 /► �✓ Contractor State Lic• 423545 Applicant: SOUTHERN CALIFORNIA EDISON Phone : 714-329-2778 [ Address : 7333 BOLSA AVENUE WESTMINSTER, CA 92683 Special Cond.: Pre -job inspection required. Permit Processing Fee : $241.00 Sewer Connection: $0.00 Agreement Fee: $0.00 4TT Box Cover: $0.00 Traffic control Plan Check : $130.00 Total Water Meters : $0.00 Inspection Fee : $3,300.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Utilities Approval Traffic Approval : General Services Approval Date Date Date Date License Expire : 06 30, 2018 v Business License: BT30049165 Business Expire : 11 30, 2018 Workers' Compensation Insurance - - Carrier : TRAVELERS PROPERTY CASUALTY Policy No: VTC2JUB9324B862 W. C. Expire: 04 01, 2018 Total Fee $3,671.00 Paid : $3,671.00 Balance : $0.00 Receipt No R t2,0 Other Department : Date: Permit Denied Date : Issued Permit: Date: a I ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR I Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 9. 10 12 13 14 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance The Permittee agrees to defend, indemnify and hold the City. its authorized agent, officers, representatives and employees harmless from any responsibility, IiabiUty, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (ie. water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure Applicant must notify USA at 1-800.227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify that I have a Certificate of consent to self -insure, Certificate of Worker's Compensation Insurance, or a Certified Copy thereof. Date: Signature: CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachment Permit Inspection is required by calling Public Works at 949-644-3311. M !� 15. Any above ground utility facilities will require documented approval from the adjacent affected property owner(s). 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to S25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Public 4Vcirk Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. I No work related to this encroachment permit shall be performed until the Public Works Department has Issued this permit. Applicant hereby acknowledges he/she has read and understands the terms and I conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days Of '!^�2 - /_!"e_.... Date• --- Permit fees are nonrefundable. � __-__Si 9nature FEE WORKSHEET FOR ENCROACHMENT PERMIT CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT All Fees Are Non -Refundable Unless Otherwise Stated PROJECT ADDRESS: PERMIT N2018- oozj 1401 QJoa I St-ree-i— NUMBER: APPLICANT: Snn avVher►1 C.o1r;ory1ip 1=di'56,1 Permit Processing Fee: Q Inspection Fee: Qty. Public Works Only $241.00 i Public Works Field Inspection $165.00 20 Other Department $275.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Agreement Fee: Water Quality/Artificial Turf Inspection $108.00 Preparation of Report/Agreement $817.00 Document Recordation Fee $192.00 Refundable Deposit: TBDB Monitoring Wells $502.00 Improvements TBD Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection $108.00 Q Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee $250.00 24" x 36" $143.001 1 4TT Box & Cover $64.00 Additional =_ THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE Revenue Division lApproval: 1 REVENUE DIVISION PRIOR TO PAYMENT OF FEES 1 1 Qty. 1Water Meter: Installation Charge $528.00 13/4" Meter $50.25 1 11" Meter $121.50 Water Meter Boxes: 11 1/2" Meter $285.00 1" DFW Meter Box $96.66 1 11 1/2" Turbine Meter $700.00 2" DFW Meter Box $203.24 e 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 4" Meter $4,730.00 !6" Meter $7,190.00 1 Qty. tsuaget Numoer Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of hrly over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance use only -mod; * 3, bl I . -- ? A-1 E> Permit Specialist Receipt No. • 0 Rev. 12/18/2017 'R . Q `7 ,•1 O `/V f'userstpbwlsharedencroach/masterstep front and back masters( epfeesheet.ds•revised 1 v8117 PROJECT SITE REPLACE V5108451 PER NOTIFICATION 409018606 DUE 3/31/18 T.L.M. DATA : 5108451 SIZE KVA CUST %LOAD EXIST : 25 9.3 2 37.16 PROP 25 9.3 2 37.18 VOLTAGE DROP : 2.18% FLICKER FACTOR : N/A PROJECT REQUIREMENTS (Y/Nl EDISON EASEMENT REQUIRED ❑N PWRD 88 REQUIRED ❑Y PERMIT REQUIRED QY PERMIT TYPE: EXCAV./ENCROACHMENT OUTAGE REQUIRED ❑Y OUTAGE DATE: TIME: TRAFFIC CONTROL REQUIRED ❑Y PEO. TRAFFIC CONTROL REO'D ❑Y CONVEYANCE LETTER REO'D QN ENVIRONMENTAL CLEARANCE REO'D CSO 140 (TLM) REO'D ❑N CR:V5108451 VAULT 8'Y14'Y9'4' Tub TUB STYLE CR: 1- S V B'X14'X9'4' TUB RM: I- SW UG SF6 LB 4-WY 600A 15KV (GS1128) SN. --_-- RM: I- TR UG BT MC F DE 25KVA 6.9KV 120/240 1P SN:-- RM: 3- U DB JUNC BAR 4WY 200A 15KV (J451A) RM: 3- JJ DB JUNC BAR MY 200A 15KV (J451B) RM: 2- JJ 3-OBE 1000 600A RM: 6- JJ OBE 1/0 200A W/BUSH EXT 1/0 600A RN: 12- JJ OBE W/BAIL 1/0 200A RM: 7- JJ DBE W/BAIL j2 200A RM: 2- JJ DBE /1 2DOA W/INS PLG RM: I- SL CBL RACK STL 30' FOR VLT/MH C/L.V9390 TO V8451 222 2-5 73 222' 3-t/0-12KV 73 222' S-1/0-12KV 73 V8451 TO C/L M8450 200' 3-5" 72 200' 3-750-1: 72 G 200' 1-2-6.9/12KV 72 \ 9� 200' 3-2-12 v 73 cJ'>� V8451 TO C/L P8959 200' 3-2-12KV 73 >' F102608 c5 1128 V5108451 72 1 \ 8'X 14'X9*4" • SPECIAL ORDER INTERCEPT •• Cl: V5108451 VAULT 7'r14'y8' Tub Style TUB STYLE L CI: 1- S V 7'X44'X8' TUB 1 PIECE IN: 1- SW UG SF6 LB RAG 6-WY 600A 17.5KV (GS1128) SN:----------- MI: 30- GR 4/0 STIR BC IN VAULT IN 1- TR UG BT MC F 0E 25KVA 6.9KV 120/240 1P+ SN:-- -------- — IN. 3- JJ LB JUNC BAR 4WY 200A 15KV (3451A) IN: 2- JJ 3-OBE 1000 600A IN. 7- JJ DB EXT 1/0 600A WAGE 1/0 200A 150V IN: 3- JJ 08 EXT 12 600A W/LBE 02 200A 15KV IN: 2- JJ OE DB RCPT INS W/TST PNT 600A IN. 9- JJ LBE 1/0 600A 15KV IN: 3- JJ LBE #2 200A 12KV IN: 1- SL CBL RACK STL 30" FOR VLT/MH MI: ISO- CBL 1000 AL 1-1/C 17KV CUP PJ IN: 6- JJ PERM STRAIGHT SPL 1/C 1000 MI: 120- CBL 1/0 AL 3-1/C 17KV CUP PJ Q IN. 9- JJ PERM STRAIGHT SPL 1/0 200A �\ MI: 60- CBL /2 AL 3-1/C 17KV CLP PJ IN. 6- JJ PERM STRAIGHT SPL /2 200A \ MI: 12- CBL 1/0 AL 1-1/C 17KV CUP PJ 2-10" SP VENTS 1-4W GS 94 / 1-FAULT INDICATOR 12 \ 25/6.93645851 / 120/240287 T / I �� CAP TO 4p 72 / / 143' TO C/L CAP \ 384' 1 -a" 72 �J / / t a3' 1 / C V A (� SQ`� H CUST \ Vt551 TO H / 139' 1-a" 72 / V8451 TO C/L P9842 143' 1- / 143' 3-1/O-12KV 12 AS -IS PROPOSED WAINWRIGHT 12KV X MACARTHUR SUB WAINWRIGHT 12KV % MACARTHUR SUB TO GS1043 POS.3 P5433907 , `'•, V5109390 V510845' OS1224 P5110106 GS1128 15109531 j 2.0 P M5105450 1 2 3 a ` L R vOS12220 051222 V5109390 P5108959 OS1223 ry ` R L T 4518 �4,J451All� lb O 2 TO .5108704 TO GS1043 POS.3 P5433907 O,A I V5109390 ; V5108451�- 051224 P5110106 GS1128 <S5109531 2Cf P J451A M5108450 ' 1 2 3 4 5 5 -� L R V5109390 OS1222 o.. ' • • ' V5109390 P5108959 OS1223 U /0 1234 L R ' Q PaQ 0 U5108704 aou.�cNN c•urdtnu EDISON M mgpV NI[IINA rgY•t COnss,y SCALE: 130' 0 30 60 133 - HUNTINGTON BEACH IMM IMM 714-895-0248 IMARM DOMINGUEZ I ORG 889-F1 Southern COlifornio Edison MAINT REPLACE V5108451 NOTIF# 409018606 DUE 3/31/18 1401 QUAIL NEWPORT BEACH, CA 92660 9!1EEEt' OE9WWOUG NO. T s T 9939� CIRCUIT: WAINWRIGHT 12KV LEGEND: SUBSTATION: MACARTHUR ® 1 WORK AREA —YPE-I DUCT &STRUCTURE OR II 5ARRICADE W/ 51GN i FLASHING ARROW 51GN (FA5) • CHANNELIZATION DEVICE A 51GN FLAGGER d -EXISTING- SIGN � �I ADA COMPLIANT PEDE5TR,AN _ PROP05ED CRASH CUSHION ARRAY "514' BARRICADE W/ 51GN I PROP05ED 20' K-RAIL (INTERCONNECTED) I TYPE -II' BARRICADE W/ 51ON R9-11(L \ W20-1 TO BE PLACED AT/ BIRCH 5T G20-2 �wq2nO-�5((Ri) 50' N T5 W4- NT5 101 SIDEWALK CLOSED LANE ENO SIDEWALK AHEAD <AHEAD AD RIGHT LANEROAD WORKCLOSED flKCLOSECI CLOSEDCROSS HERE AHEAD C301CA; G20-2 OM-3L OM-3R R9-9 99-111R LI W4-21RI W201 W20-bM DIc� r I m QUAIL 5T [40 MPH , MAX MERGING TAPER 1 NOTE: CONTRACTOR SHALL COORDINATE WITH AFFECTED RESIDENTS & BUSINESSES PRIOR TO CONSTRUCTION WORK AREA TRAFFIC CONTROL PLAN: QUAIL 5T & SPRUCE AVE 5CE TRAFFIC MANAGEMENT, INC. NEWPORT BEACH California - Great lakes 1349786 800.763.3999 0' 20' 40' 80' PLAN ORDER #: 32341 www.trafficmanagement.com .�� Traffic Control Services • Sales & Rentals SCALE: 1 " = 40r SHEET 1 OF 2 1/9/18 JT Purnits&Cormfting•Engineering •Training VAULT# V5108451 C31 #f 785804 LEGEND: ® WORK AREA FLA5f-INC, ARROW 51GN (FA5) FLAGGER �I ADA COMPLIANT PFDE5TRIAN BARRICADE W/ 51GN I - TYPE -III BARRICADE Wl 51GN X TYoE-1 OF, 15AKRICADE W/ 51GN CHANNELIZATION DEVICE 0 515N d EX15TING 51GN ==N"O PKOP05ED CKA5y CU5HICIN AKRAY "7514'' PROP05ED 20' K-PAIL (N'ERCONNECTED) DUCT & STRUCTURE D c� z Im QUAIL 5T [4o MP-i I L SIDEWALK CLOSED LANE eN� SIDEWALK AHEAD <AHEAD RIGHT LANE CLOSED RoaowaRK CLOSED CLOSED C+' 20' 40' $0' CROSS HERE 1 , \AHEAD SCALE: 1 " = 40' C301CA! G20-2 OM 3L OM 3R 139-9 R9.111R LI W6-201I W20-1 W20-51R: 250' CIRCUIT: WAINWRIGHT 12KV SUBSTATION: MACARTHUR NOTE: CONTRACTOR SHALL COORDINATE WITH AFFECTED RESIDENTS & BUSINESSES PRIOR TO CONSTRUCTION WORK AREA TRAFFIC CONTROL PLAN: QUAIL 5T & 5PKUCE AVE 5CE TRAFFIC MANAGEMENT, INC. NEWPORT MACH Calilemia-Gieatlakes 1349786 800.763.3999 PLAN ORDER #: 32341 www.trafficmanagement.com TMII Traffic Control Services - Sala & Rentals SHEET 2 OF 2 1/9/18-JT Pennits&Consulting- Engineering - Training VAULT# V5108451 C31 # 785804