HomeMy WebLinkAboutN2017-0518tN4,.(I"� oityofNewport Beach
1111111111111111111111111111111111111111111111111111111111 Permit No:N2017-0518„'Vic center Drive, Newport ach, CA92660
Permit Counter Phone (949)644-3311 Project No: 1093-2016
k, Online Inspection Request - www.newportbeachca.gov / Online
e• " Services
Inspection Requests Phone (949)644-3255
Job Address: 338 L ST NB
Thomas:Guide: 919132
Description : EA FOR NEW DECORATIVE ENTRY WALKWAY PAD WITH BEIGE FLAGSTONE.
SCANNED
Parcel # : 0482-520-3 -
Legal Desc : TR 518 LOT 4 BLK M(AND N1/2 LOT 5 BILK M
Owner: RJC HOLDING LLC
Contractor: MIKEN CONSTRUCTION CO, INC
Phone:
Phone: 909-957-0390
Address : 4686 E ONTARIO MILLS PKWY
Address : 4686 ONTARIO MILLS PKWY
ONTARIO CA 91762
�
ONTARIO CA 91764
Contractor State Lic: 941129
Applicant: MIKEN CONSTRUCTION CO, INC
License Expire: 12 31, 2017
Phone: 909-957-0390 [
Address : 4686 ONTARIO MILLS PKWY
ONTARIO CA 91764
Business License: BT30039074
Business Expire : 04 30, 2018
Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED
Workers' Compensation Insurance - -
Carrier : OAK RIVER INS CO
Policy No: MIWCB14749
W. C. Expire: 09 01, 2018
Permit Processing Fee : $0.00
Sewer Connection :
$0.00
Total Fee $982.00
Agreement Fee: $817.00
4TT Box Cover:
$0.00
Paid : $982.00
Traffic control Plan Check : $0.00
Total Water Meters :
$0.00
Balance: $0.00
Inspection Fee : $165.00
Water Meter Connection :
$0.00
Receipt No:
Refundable Deposit: $0.00
Total Water Meter Box:
$0.00
Street Tree Fee : $0.00
Adjustment:
$0.00
Processed By :
Date : _/_/
Other Department : Date
Utilities Approval :
Date : _/_/
Permit Denied Date
Traffic Approval :
Date: _/_/
Issued Permit: Date: "L
General Services Approval :
Date: _/_/
PROJECT ADDRESS: S
DETAILED DESCRIPTION OF PROPOSED WORK:
APPLICANT: -� 6 f
Phone.
7�3 O
Email Address: 0
p 6ti
Mailin d �, �
Ci /Sta ip: �.7 L
v
OWNER: � cr I"
Phone:
Email Address:
-� o •-•—
Mail'
�k
ONTRACTOR: lri
Office Phone.
Company (if different):
Jobsite Phone
.S d 1 6
Other Phone:
Email Address: v G C
Mailin Ad �
City/t�e/Zi
State icense Number & Class:
Z Expires: 2 -�
C' Business License Number:
3 Ex inns: 96
ORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code)
Company-c` =`"f C� v PolicyNo-�� C � l u Ires: `lam
Municipal Orations: 949-644-3055
Utilities: 949-644-30!Li
Urban Forestry: 949-644-3083
Special Conditions of Permit:
V1
c�
Utilities: ` Traffic:
Municipal Operations Other:
0 Fire:
.-
0
Engineering Technician:
_SQ2
Permit SpqGjallst
1
Date:
Permit No. CC'>
N2017- /b
flusersfpbwtsharedfenaoad"asters/epwarkaheet.)ds I
Public Works Department 949-644-3311
100 Civic Center Drive, Newport Beach, CA 92660
(Z� c7) Lj
Permit Processing Fee:
Public Works Only
Other Department
Agreement Fee:
Preparation of Report/Agreement
Document Recordation Fee
Monitoring Wells
$241.00
$275.00
[n
$817:00
$19200
$502.00
Inspection Fee:
Public Works Field Inspection $165.00
Utilities Field Inspection $121.00
General Services Inspection $165.00
Water Quality/Artificial Turf Inspection $108.00
Refundable Deposit:
Improvements
Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection
Traffic Control Plan Check
8-1/2" x 11" $65.00 Sewer Connection Fee
24" x 36" $143.00 4TT Box & Cover
Additional _ _ _
THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE R
REVENUE DIVISION PRIOR TO PAYMENT OF FEES A
TBDeTBD
$108.00 0
$.00 $64e
64.00
-- ----
venue Division I
(Water Meter:
Installation Charge
$528.001
13/4" Meter
$50.25
Water Meter Boxes:
1
11" Meter
$121.50
For Parkway & Sidewalk Area (Box + Cover =Cost 1
11 1'/2" Meter
$285.00
1" Meter: 13.00 + 37.00
$50.00
11 1 /2" Turbine Meter
$700.00
2: Meter. 27.00 + 61.25
$88.25
12" Meter
$425.00
12" Turbine Meter
$845.00
For Traffic & Alley Areas (Box + Cover = Cost)
13" Meter
$3,310.00
1" Meter: 13.00 + 38.00
$51.00
14" Meter
$4,730.00
2" Meter: 27.00 + 162.00
$189.00e
6" Meter
$7,190.00
Certificate of Compliance Fee (+100% of My over 3 hrs)
$288.00
5200-5029
Development Services Fee (Plan check hourly)
$155.00
5200-5015
Final Tract Map Checking Fee
$2,488.00
5200-5026
Final Parcel Map Checking Fee - Moderate
$2,488.00
5200-5027
Lot Line Adjustment Fee
$1,079.00
5200-5028
Park Dedication Fee Zone
TBD
405-470
Street Easement/Vacation Fee (+100% of hrly over 4 hrs)
$1,022.00
5200-5031
Street Tree Fee ($700 Planting Fee)
--. ...... _.... .....
TBD
030-2284
............ -----
Engineering Tech:
Total Amount Due:
For Finance Use Only
Permit S' t
Receipt No.
f:lusers/pbwlshared/encroach/masters/ep front and back mastersl
Rev. 1/5/2017
epfeesheet.xts-revised 10121/2016
ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR
Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422.4133
TERMS AND CONDITIONS OF ENCROACHMENT PERMIT
WORKER'S COMPENSATION INSURANC S ion 3 or Code)
1
Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed
I certify that I have a Certificate of conse to sel insure tificate of Worker's
contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the
Compe ation Insurance, or a Certified py1Wer of.
permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of
/ _
a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days
Date (— Signatu
after date of issuance.
CERTIFICATE OF EXEMP 0 (Section 3800 Labor Code)
2. The Permittee agrees to defend, indemnify and hold the City. its authorized agent. officers, representatives and
employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss
I certify that in the performance of t ork under this permit, I shall not employ
or damage to persons or property occurring as a result of work undertaken under this permit
any person so as to become subject to California Worker's Compensation Laws. If,
3.
All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings
after signing this certificate I become subject to the Worker's Compensation
of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances.
provisions of the State Labor Code, I must comply with the provisions of Section
4.
Permitlee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall
3T00 or this permit shall be deemed revoked.
be corrected within two weeks after notification to the satisfaction of the Public Works Director.
5.
A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the
Date: Signature:
Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For
construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or
CONTRACTOR LICENSE EXEMPTION
connection to sewer lines a valid State Contractor License Class C-42 is required.
6.
All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L,
As the Owner of the benefiting property, I certify I am personally performing all
in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public
work in the Public Right -of -Way.
Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of
Date: Signature:
Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all
excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent
means. Trenches less than 5 feel in depth shall be guarded when hazardous ground movement may be expected.
HOLD HARMLESS STATEMENT
7.
The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must
I understand that I am locating minor encroachments within the City Right -of -
be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be
Way/Easement. As property owner it is my responsibility to maintain the
inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities
encroachments. I will be responsible for replacing the improvements if the City
Department or General Services Department inspections may be required depending on scope of work performed.
removes them for maintenance of utilities or other public need. I shall indemnify
8.
All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed
and hold the City harmless for any liability associated with the minor
over or within 5 feel of any City utilities. unless approved by the Public Works Department. Locate and pothole
encroachments.
existing City -owned utilities (ie water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot
clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a
Date: Signature:
4TT boy. over the riser.
24-hour notice for Eneroachmen a it Ins o required by calling
9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All
"Manual
signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of
Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the
Public Works at 949-644-3311.
California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00
15. Any above ground utility facilities will require documented approval from the adjacent
per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to
protect the general public. Access to fire hydrants must be maintained at all times
affected property owntility
10
Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day
Water
16. Homeowner, contractors, and su ntracotrs may each be liable for violations of Water
weekend, summer between June 15 and September 15, and during the holiday season from December 19 to
Quality Laws. Best Management Practices will be enforced. It is against the law to
1'I.
January 1, unless approved by the Public Works Department
Any work That extends into traffic or parking lanes and impedes the normal flow traffic requires the applicant to
discharge construction debris into the gutter and storm drain. Felony violations of Wafer
acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and
Quality Laws are punishable by fines up to $25,000 and/or up to three years in State
prison plus the full cost to clean up an illegal discharge or spill.
emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control
17 If a refundable deposit was paid, applicant must submit a Soils Compaction
Handbook (WATCH) No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure
on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by
Certificate or Evidence of a Slurried Backfill and request a final inspection from the
the Public Works Department. Any work affecting the Slate Highway's traffic or within the Slate Highway right-of-way
Public Works Department. Monies may be held for six months after final inspection
will require a Caltrans Permit All vehicles shall be lawfully parked
before a refund will be processed.
12
This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of
18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated
materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure
without approval from the General Services Department.
13.
Applicant must notify USA at 1.800-227-2600 2 days before starting any underground construction. Applicant
19. All work in the public right-of-way must meet the approval of the Public Works
must notify all affected residents 24 hours in advance of restricted access and any inconveniences.
Department or corrections will be required (i.e. removals, exposing connections,
14.
Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City
etc.). Additional inspection fees may be required.
may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066
20. Permit is for standard materials in the public right-of-way only, unless previously
for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a
approved by Public Works and an Encroachment Agreement has been processed.
Temporary Street Closure Permit must be obtained from the Public Works Department.
21. Permit is valid for "description" of work noted on front only. Additional work
performed may require issuance of a separate permit a r additional fees.
No work related to this encroachment permit ;hall be performed until the Public Works Department has issued this permit Applicant herWbyawledges hale has re rid u ereridterms and
conditions of this permit and he/she agrees to abide by them. Permit is void if work Is not commenced within 30 days after issuance.Permit
fees are nonrefundable.
DaSignatur ____
11/8/2017 City of Newport Beach Page 2 of 11
4:30:17PM INSP150 - Daily Inspection Request Report
Requested Inspection Date: 11/09/2017
Inspection Type : ENCROACH
Inspection Area: PW
Site Address: 338 L ST
Activity : N2017-0518
SubType : NEW
Status : APPROVED
OWNER: RJC HOLING LLC Phone
APPLICANT: MIKEN CONSTRUCTION CO, INC Phone : 909-957-0390
Description : EA FOR NEW DECORATIVE ENTRY WALKWAY PAD WITH BEIGE FLAGSTONE.
Item: 10250 FINAL - PW
Requested Time: 11/9/2017 12:00:OOAM Requestor: NBIVR
9099570390
Entered By: NBIVR
Comments: AM
Assigned to:
Inspector: Date: zz Time: AM PM
Comments:
Cnfiall
F:\Users\PB\MShared\ENCROACH\MASTERS\FORMS\InsoectorSheet.doc
REPT131 Run Id: 4018