Description : NEW ALLEY PER STD, REMOVE WALL AND HARDSCAPE FROM P-R-O-W.
Parcel # :
0481-431-4 -
Legal Desc :
BALBOA TR BLK 14 LOT 27
Owner:
AVA EQUITIES
Phone:
949-290-6832
Address :
23832 HILLHURST DR
LAGUNA NIGUEL CA 92677
Applicant: S C HOMES INC
Phone: 949-723-4243 [
Address : 3501 JAMBOREE RD #6100
NEWPORT BEACH CA 92660
Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED
Permit Processing Fee :
$241.00
Sewer Connection :
$0.00
Agreement Fee:
$0.00
4TT Box Cover:
$0.00
Traffic control Plan Check :
$0.00
Total Water Meters :
$0.00
Inspection Fee :
$495.00
Water Meter Connection :
$0.00
Refundable Deposit:
$0.00
Total Water Meter Box:
$0.00
Street Tree Fee :
$0.00
Adjustment :
$0.00
Processed By :
Date
Utilities Approval :
Date
Traffic Approval :
Date
General Services Approval :
Date:
Permit No: N2017-064?-V
Project No: 0584- 1
ANNF
Inspection Requests Phone (949)644-3255
919C2
Contractor: S C HOMES INC
Phone : 949-723-4243
Address : 3501 JAMBOREE RD #6100
NEWPORT BEACH CA 92660
Contractor State Lic: 828216
License Expire : 12 31, 2017
Business License: BT30002421
Business Expire:
02 28, 2018
Workers' Compensation Insurance - -
Carrier :
STATE FUND
Policy No:
1763760
W. C. Expire:
01 07, 2018
Other Department :
Permit Denied :
Issued Permit
Total Fee
Paid .
Balance
Receipt No:
$736.00
$736.00
$0.00
Date :
Date :
Date 1—ii2cp l 7
PROJECT ADDRESS: t.
DETAILED DESCRIPTION OF PROPOSED WORK:
-
J LO
`U
llr
PPLICA S
Email Address- V ,
Phone: q� `� - TZ 3 - � z
6LA iCkK
Mailing -zAddress: LL
jCity/State/Zip:
to-/ (-
OWNER:
Email Address:
Phone:
Mailing Address:
City/State2ip:
CONTRACTOR: � i
Office Phone: �/ - �Z, - Ll
Company (if different):
Jobsite Phone: c y ( - u4= C
Other Phone:
Email Address:
�ice,.
Mailing Address:
City/State/Zip:
State License Number & Class:
t3 t;CC; Z1Z Expires:
-
City Business License Number:
Expires:
WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code)
Company: Policy Ex ices:
Municipal Orations: 949-644-3055
Utilities: 949-644-3011
Urban Forestry: 949-644-3083
Special Conditions of Permit:
-
Utilities: ' Traffic: 0 Fire:
Municipal Operations Other:
Engineering Technician:
l✓
Permit Sp
ialist
Date:
LJ %
Permit No. , f
N2017-
tluserslpbw%sha "er*UaOVMasterslepw~eet.xls I
2.
Public Works Department 9494"-3311
100 Civic Center Drive, Newport Beach, CA 92660
(� .W S+v vt(-h M
Permit Processing Fee:
Public Works Only $241.00 l
Other Department $275.00
Agreement Fee:
Preparation of Report/Agreement $81' .00
Document Recordation Fee $19:2
Monitoring Wells $502.00
Inspection Fee:
Public Works Field Inspection $165.00
Utilities Field Inspection $121.00
General Services Inspection $165.00
Water Quality/Artificial Turf Inspection $108.00
Refundable Deposit: TBD
Improvements TBD
Street/Alley/Walk Closure: $65.00Newspaper Rack Inspection $108.00
Traffic Control Plan Check
8-1/2" x 11" $65.00 Sewer Connection Fee $250.00
24" x 36" $143.00 4TT Box S Cover $64.00
Additional
I THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE
t REVENUE DIVISION PRIOR TO PAYMENT OF FEES Jk9;;re7Drv-1r1o;1
Approval: I
1
mil•
• . 1
Water Meter.
Installation Charge $528.00
13/4" Meter
$50.25
Water Meter Boxes:
11" Meter
$121.50
For Parkway & Sidewalk Area (Box + Cover = Cost 1
11 1/2" Meter
$285.00
1" Meter: 13.00 + 37.00 $50.00 1
11 1/2" Turbine Meter
$700.00
2: Meter: 27.00 + 61.25 $88.25
12" Meter
$425.00
12" Turbine Meter
$845.00
For Traffic & Alley Areas (Box + Cover = Cost) 1
13" Meter
$3,310.00
1" Meter: 13.00 + 38.00 $51.00
�4" Meter
$4,730.00
2" Meter: 27.00 + 162.00 $189.00e
0" Meter
$7,190.00
Certificate of Compliance Fee (+100% of hrly over 3 hrs)
$288.00
5200-5029
Development Services Fee (Plan check hourly)
$155.00
5200-5015
Final Tract Map Checking Fee
$2,488.00
5200-5026
Final Parcel Map Checking Fee - Moderate
$2,488.00
5200-5027
Lot Line Adjustment Fee
$1,079.00
5200-5028
Park Dedication Fee Zone
TBD
405-470
Street Easement(Vacation Fee (+1C)O% of hry over 4 hrs)
$1,022.00
5200-5031
Street Tree Fee ($700 Planting Fee)
TBD
030-2284
Engineering Tech:
Total Amount Due:
For Finance Use Only
Perm' ecialist
Receipt No.
/\�
f/userslpbwlsharedlenooachlmasterstep front and back masters)
Rev. 1/5/2017
epfeesheetAs*evised 10212016
ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR
Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422.4133
TERMS AND CONDITIONS OF ENCROACHMENT PERMIT
WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code)'
1
Encroachment Permits may be taken out by the owner of benefited properly or a licensed contractor. A licensed
1 certify that I have a Certificate of consent to self -insure, Certificate of Worker'_
contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the
Compensation Insurance, or a Certified Copy thereof.
permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of
a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days
Date.-- Signature
after date of issuance.
CERTIFICATE OF EXEMPTION (Section 3800 Labor Code)
2 The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and
employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss
I certify that in the performance of the work under this permit, I shall not employ
or damage to persons or property occurring as a result of work undertaken under this permit.
any person so as to become subject to California Worker's Compensation Laws. If,
3
All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings
after signing this certificate I become subject to the Worker's Compensation
of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances
provisions of the State Labor Code, I must comply with the provisions of Section
4
Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall
3700 or this permit shall be deemed revoked.
be corrected within two weeks after notification to the satisfaction of the Public Works Director.
5
A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the
Date: Signature:
Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For
construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or
CONTRACTOR LICENSE EXEMPTION
connection to sewer lines a valid State Contractor License Class C-42 is required.
6.
All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L,
As the Owner of the benefiting property, I certify I am personally performing all
in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public
work in the Public Right -of -Way.
Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of
Date: Signature:
Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all
excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent
means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected.
HOLD HARMLESS STATEMENT
7.
The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must
I understand that I am locating minor encroachments within the City Right -of -
be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be
Way/Easement. As property owner it is my responsibility to maintain the
inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities
encroachments. I will be responsible for replacing the improvements if the City
Department or General Services Department inspections may be required depending on scope of work performed.
removes them for maintenance of utilities or other public need. I shall indemnify
8
All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed
and hold the City harmless for any liability associated with the minor
over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole
encroachments.
existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot
clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a
Date: Signature:
4TT box over the riser.
24-hour notice for Encroachment Permit Inspection is required by calling
9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All
"Manual
signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of
Public Works at 949-644-3311.
Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the
California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00
15. Any above ground utility facilit es will require documented approval from the adjacent
per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to
protect the general public Access to fire hydrants must be maintained at all times.
affected property owner(s).
10.
Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day
16 Homeowner, contractors, and subcontracotrs may each be liable for violations of Water
weekend, summer between June 15 and September 15, and during the holiday season from December 19 to
quality Laws. Best Management Practices will be enforced. It is against the law to
11.
January 1 unless approved by the Public Works Department
Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to
discharge construction debris into the gutter and storm drain. Felony violations of Water
acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and
quality Laws are punishable by fines up to $25,000 and/or up to three years in State
prison plus the full cost to clean up an illegal discharge or spill.
emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control
17. If a refundable deposit was paid, applicant must submit a Soils Compaction
Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure
on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by
Certificate or Evidence of a Slurried Backfill and request a final inspection from the
the Public Works Department. Any work affecting the State Highway's traffic or within the Slate Highway right-of-way
Public Works Department. Monies may be held for six months after final inspection
will require a Caltrans Permit. All vehicles shall be lawfully parked.
before a refund will be processed.
12
This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of
18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated
materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure.
without approval from the General Services Department.
13.
Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant
19. All work in the public right-of-way must meet the approval of the Public Work;
must notify all affected residents 24 hours in advance of restricted access and any inconveniences.
Department or corrections will be required (i.e. removals, exposing connections,
14
Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City
etc.). Additional inspection fees may be required.
may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066
20. Permit is for standard materials in the public right-of-way only, unless previously
for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a
approved by Public Works and an Encroachment Agreement has been processed.
Temporary Street Closure Permit must be obtained from the Public Works Department.
21. Permit is valid for "description" of work noted on front only. Additional work
performed may require issuance of a separate permit and/or additional fees.
No work related to this encroachment permit ghall be performed until the Public Works Department has Issued this permit. Applicant hereb acknowledges he/she has read and unders terms and
conditions of this permit and he/she agrees to abide by them. Permit Is void if work Is not commenced within 30 days after Issuance. C l
",flgnature(�___._`.____.__.
Permit
tees are nonrefundable.
Dare:��-.7 -�
r A,YR�
�
�tY��Uy
�ii ?#`.�6r#��a w,^3s v`aR2 fl'� vas
,gR�
Z
r a l Ip�l �•l rr3 #e,: a t'17x', �� �rMv;�; a��
P• p
P �
pvl�;v
UA
sa;_ drsa-'A Al
��$ h �,.,y.l': � �'�F'��� �' P S' br`. �xd•
e
v t n A t, u
sa�riaRa .lfu�I p Al x 3 j ifi
W ;
'er rA �,r� N ` rg ��ip`" r A,- "" ad fi; ,, .,A," AF"-:Axl"
e e N C
� "� � �' '� G1� ��d r�
w
N<, $ < P tia,g<; v,; P�� g ar,rrrrd
ia�����3s;i^sr :Ail€s yid
F' Ron
t,A
F, �w •rS;:�P ,��r ���F �� ,R': N�dxAdA>p�4 ��tit�K iR�F����>• .�
9
����p�� �,dq{p8r�6�,r f5�rfiFk
Pd S-�IN�t'� T."P P;r.'xn i;P���((°°�1Fp o
�A AiR^I ftlfM a�. rA ci6 dY Ran
�5'2
m,; nVWa S6 tpr��l AAfi mR: As,ar
1 � "6 A A K �t aay'i
, ���
—
I
I
:.
ao es v
I
4E
tIy
b
G
p
--
1SV3 -LNO aA N` 300
m
t
1
I51
51
co�
cn
DD DWNW�
MyyD
XxX��R00000.3" 00n
m
C
rj 0 Z Z
i m
A NEW RESIDENCE FOR
ANALISA REALTY
SITE PLAN
al ; •
IAN I.N. HARRISON
ARCHffLCT
PROJECT DATA
55351A.
(,
926 OCEAN FRONT EAST
x�' •�.,i
MAR,( tI,*NL
C:J0. WAl)N. MAI�C.V IIJ0.NU 91625
t
, i
NEWPORT BEACH, CALIFORNIA 92661
IANfONN1190.RI4)NAR<(IIIIIII( I .M1
-- O 1191 a _ 5CtP�^C.] .. •`. _ n nPRR �S 5[d[C rcg 5cvca d2rCCLC •Cal
f
B STREET_-
t__
L
cEF-CV ;—_. pFa NLIV_
O
\--a— NE/1c_
5 .nl\ \:- '_
e_F �\�aF- _- =v:i J� ;,♦
/,
,. .- _ t
\\ J Ev gr NS SEWEF _;r_c� _
r L N 26105'00" E 10.00'
DE 5g -FE mC JE _ � I - — — — — ' _ _ _ _ � — � — — — — —
t
i
r, I
r
I
Z 1
i
7-1
OT
i
N 2 CAR, GARAGE _ • _<-4
F=Fc-E'.r-L.J'-L ,
DWELLING
►j _
1
n �--• I . _ _ _ _ _ `` SS ,� �`' it �7r �/J - r,a�l� --i�`Q /+ ` 1 y �J 1
IN
ca f =L`�=
--- ------- , - - - --
,---
FL \ 25'05'00" E 1110' ✓ `�•
SITE / DRAINAGUGRADING PLAN v4 = t -0
iv?F.:VEMEN-E FEuCv' Evl-
AVC LOT tfr ULC
$I
sH§
}
a
a
sss��Z tea. � a
A9i iHV P A
%a�S g
x�
T6>�j
C�3
�5 4fc,
p o
� � r
v � lv �p0 ay
h 'yid` 1tlU^�c
s
IMI 'M ACV&
ruaroeove 2"3r
N c� s erwffr -- a
M
7
D
m
A NEW RESIDENCE FOR
AVA EQUITIES
= ti"y
"
M JN. RARRWN
ARCEMB T
o
CA)o
SURVEY
_>
V�=�a
,
g
a
924 OCEAN FRONT FAST
NEWPORT BEACH, CALIFORNIA 92W
- °°'�° ""N"
a
N14SVPOVSJU50KCCM
are a ei ra WNW it m hw*W are not atlarirM for c4l6trwA= wU sUWW w th M M F&N%vV; N state ra@*Ur d a t*4Wt seal
-1124/2018 City of Newport Beach Page 3 of 17
'4:30:49PM INS13150 - Daily Inspection Request Report
Requested Inspection Date: 01/25/2018
Inspection Type: ENCROACH
Inspection Area: PW
Site Address: 924 OCEAN FRONT E
<�P%D Irtonr�ation:
Activity : N2017-0641
SubType : NEW
Status : APPROVED
OWNER: AVA EQUITIES Phone : 949-290-6832
APPLICANT: S C HOMES INC Phone : 949-723-4243
scoff@schomesbuilder.com
Description : NEW ALLEY PER STD, REMOVE WALL AND HARDSCAPE FROM P-R-O-W.
Requestel InsonW
Item: 10205 GENERAL SERVICE
Requested Time: 1/25/2018 12:00:OOAM Requestor: NBIVR
Entered By: NBIVR
Comments: AM
9498120680
/LjEirly •- p / - 7
Assigned to:
Inspector: � I J Date: Z� Time: AM PM
Comments: T—
4-V
rA
F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMSVnsoectorSheet.doc
REPT131 Run Id: 4018
1/29/2018 City of Newport Beach Page 15 of 19
. •9:34:17AM INSP150 - Daily Inspection Request Report
Requested Inspection Date: 01/29/2018
Inspection Type: ENCROACH
[nspection Area: PW
Site Address: 924 OCEAN FRONT E l0
A/P/D Information:
Activity : N2017-0641
SubType : NEW
Status : APPROVED
OWNER: AVA EQUITIES Phone : 949-290-6832
APPLICANT: S C HOMES INC Phone : 949-723-4243
scoff@schomesbuilder.com
Description: NEW ALLEY PER STD, REMOVE WALL AND HARDSCAPE FROM P-R-O-W.
Mad ills "4 s
Item: 100 FORMS WITH COMPACTION - P
Requested Time: 1129120 equestor:
Entered By: WEBUSER
Comments: AM -
Assigned to: zzzzzzzzzzz`
Inspector:
Comments:
Date: l - `.
i�✓c l-f�)
F tea✓
F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc
W 1EB_USER
949-812-0680 MA r K-
Time: 6" �.C� AI PM
`- 1-E4 i y0 -�
1/30/2018 City of Newport Beach Page 1 of 16
4:30:27PM INSP150 - Daily Inspection Request Report
Requested Inspection Date: 01/31/2018
Inspection Type: ENCROACH
Inspection Area: PW
Site Address : 924 OCEAN FRONT E
Activity : N2017-0641
SubType : NEW
Status : APPROVED
OWNER: AVA EQUITIES
APPLICANT: SC HOMES INC
: NEW ALLEY PER STD,
Item: 10205 =AM�
Requested Time: 1/31/2018 12.0 Re u
Entered By: � VBIVR
Comments:
Phone : 949-290-6832
Phone : 949-723-4243
chomesbuilder.com
5i4REFROM P-R-O-W.
9498120680 -*0') /}'9QK,
tD G4a
Assigned to:
Inspector: Date: 3t 16 Time: �AM
Comments:
/ a
F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InsnectorSheet.doc
REPT131 Run Id: 4018
engineering DAY DATE
geotechnical PROJECT NAME PROJECT NO.
applications LOCATION CITY
consultants
SUPERINTENDENT/FOREPERSON
FIELD REPORT CONTRACTORS)
ENGINEER
TO: File
EOUIPMENT ON SITE
PERSONNEL ON SITE
4
TYPE OF 0 Soils 0 Structural Steel Assembly U Quality Control
INSPECTION ❑ Reinforced Concrete U Drainage rJ Epoxy
REQUIRED U Reinforced Masonry ❑ Asphalt ❑ Other
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS:
TESTS PERFORMED: CYLINDERS:
RECOMMENDATIONS:
SIGNATURE, TITLE (POSITION)
PERSONNEL ON SITE ARRIVAL DEPARTURE TIMEEN TRAVEL SUBTOTAL
SIGNATURE OF SUPERINTENDENT, TITLE (POSITION)
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 92627
TOTAL HRS (949) 642-9309
(4 HR. MIN.) FAX (949) 642-1290
N z000 17 — 0 (Pq I
Inspector: \
Ai FAOt4 r
Mg R V, - ,yq or s i z ap oepaol
Date: //8 Time: ' 60 AM M
Comments: L,4 �
9
F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMSMnspectorSheet.doc
s. 12/20/2017 City of Newport Beach Page 2 of 8
4:30:12PM INSP150 - Daily Inspection Request Report
Requested Inspection Date: 12/21 /2017
Inspection Type : ENCROACH
Inspection Area: PW
Site Address : 924 OCEAN FRONT E
Activity : N2017-0641
SubType : NEW
Status : APPROVED
OWNER: AVA EQUITIES Phone • 949-290-6832
APPLICANT: S C HOMES INC Phone • 949-723-4243
scott@schomesbuilder.com
Description : NEW ALLEY PER STD, REMOVE WALL AND HARDSCAPE FROM P-R-O-W.
Item: 10200 PRE JOB - PW
Requested Time: 12/21/2017 12:00:OOAM Requester: NBIVR
9498120680
Entered By: NBIVR ✓✓ll
Comments: AM
Assigned to
Inspector: Date: Z 2 / Time: , AM M
Comments:
s A, O I k6 (t--tcv
446 . 774-6 �v[ i.U� J G,
V
' ��- -t-a
e °� c-rr 57-
Ar L L-Ct---y
(
s Y-i7 I
qy- L r -c 8 4c P,
S TQY2 - L
bv% A- vuc co P t t_ s oT-&-D
SC E i3ox 4/r6n w bl; Uwe-)L,:4-r ,97D
/..I 3 ki A L-L.yAl 1z/litil...� � S� �Lp I7 � /l/r-,i--' 0 e ( E 17)
P�-PrN A jt-,fLwtiT.
v✓Tr- '. 0 iv
L44--Vt. t, r Pu4/ / S
F:\Users\PBW\Shared\ENCROACH\MASTERS\ ORMS\InsuectorSheet.doc
rownsffAi oil"
Logged
Reffle
jk4M.
REPT131 Run Id: 4018