HomeMy WebLinkAbout07 - Storm Drain Repair/ Rehabilitation Project — Notice of Completion for Contract No. 8163-1 (18D02)Q SEW Pp�T CITY OF �m z NEWPORT BEACH c�<,FORN'P City Council Staff Report May 28, 2019 Agenda Item No. 7 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Kathryne Cho, Civil Engineer, kcho@newportbeachca.gov PHONE: 949-644-3014 TITLE: Storm Drain Repair/ Rehabilitation Project — Notice of Completion for Contract No. 8163-1 (18D02) ABSTRACT - On March 13, 2018, City Council awarded Contract No. 8163-1, Storm Drain Repair/Rehabilitation Project to Sancon Technologies, Inc. (Sancon) of Huntington Beach, California. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) On March 13, 2018, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(c) (replacement of existing facilities involving no expansion of capacity) of the CEQA Guidelines, because this project has no potential to have a significant effect on the environment; b) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; c) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and d) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were included within the approved Capital Improvement Program and were expended from the following account: Account Description General Fund Account Number FAr. MR an 01201926-980000-18D02 $ 607,838.31 Total: $ 607,838.31 7-1 Storm Drain Repair / Rehabilitation Project — Notice of Completion for Contract No. 8163-1 (18D02) May 28, 2019 Page 2 DISCUSSION: Awarded Final Cost at Contingency Actual % Due to % Due to Contract Completion Allowance Contract Directed Unforeseen Amount Change Change Change $626,975.00 $607,838.31 10% or less -3.1% -20.7% 17.6% Allowed Contract Time 85 Actual Time 0 (days) Under (-) or Over (+) The work necessary for the completion of this contract consisted of distributing construction notices to affected businesses and residents; cleaning, inspecting and CCTV recording the storm drain lines condition; installing structural liners in existing corrugated metal pipes (CMP); excavating and replacing damaged/deteriorated storm drain pipe sections; resurfacing affected areas and other work described in the contract documents. The contract was completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original Bid Amount: $ 626,975.00 Actual Cost of Bid Items Constructed: $ 497,324.00 Total Change Orders: $ 110,514.31 Final Contract Cost: $ 607,838.31 Seven change orders were issued for work related to additional necessary point repairs, clearing and grubbing, and exploratory work. During construction, staff found that the original planned project scope, which was based on a 2016 video inspection, changed in some locations. Therefore, additional sediment removal and point repairs were required prior to the planned structural lining. Staff believes these site condition changes were primarily due to the higher -than -normal heavy rains experienced during this last winter. During the pre -lining preparation phase, Sancon determined some of the storm drain pipes scheduled for lining could not be lined due to changed conditions. Some of the pipe conditions encountered included missing pipe sections, crushed or settled pipes, misaligned pipes and pipes obstructed with roots and soil. For example, the condition of the 18 -inch CMP located along East Coast Highway at Goldenrod Avenue differed greatly between the contractor performed pre -construction video and the 2016 investigative video, which the design was based on. Since 2016, the pipe had deteriorated much further and could not be lined in its current condition as called for in the contract plans. With further anticipated heavy rains on the horizon, staff directed the contractor to perform emergency point repair work to stabilize the underground erosion (and the sidewalk above), patch the pipe and prepare the pipe to receive structural lining, as the project intended. 7-2 Storm Drain Repair / Rehabilitation Project — Notice of Completion for Contract No. 8163-1 (18D02) May 28, 2019 Page 3 The heavy rains developed the need for additional point repair work and delayed the project's scheduled completion. The contractor mobilized and de -mobilized six times during the project due to the weather impacts. Each time the contractor left the City, the project had to wait for the contractor and subcontractors to revise and re-employ their scheduled work. Further complicating work scheduling, many public agencies had emergency work due to the winter storms and all contracting resources were stretched thin, including our contractor and sub -contractors for this project. A summary of the project schedule is as follows: Estimated Completion Date per 2018 Baseline Schedule: December, 2018 Project Award for Construction: March 13, 2018 Contract Completion Date with Approved Extensions: February 4, 2019 Actual Substantial Construction Completion Date: February 4, 2019 ENVIRONMENTAL REVIEW: On March 13, 2018, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(c) (replacement of existing facilities involving no expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 7-3 ATTACHMENT A N f NOT TO SCALE 3 v X PROJECT LOCATIONS 1 COAST HWY E / SEAWARD RD 2 COAST HWY E / GOLDENROD AVE 3 COAST HWY W AT MARINER'S MILE 4 DOVER DR / MARINERS DR 5 BACK BAY DR W / EASTBLUFF DR (POSTPONED) 6 JAMBOREE RD / SAN JOAQUIN HILLS RD 7 BAYSIDE DR / MARINE AVE (COMPLETED AS PART OF C-7224-1) STORM DRAIN REPAIR/ REHABILITATION CITY OF NEWPORT BEACH PROJECT PUBLIC WORKS DEPARTMENT a LOCATION MAP C-8163-1 05/28/19 7-4