Loading...
HomeMy WebLinkAboutN2018-0425City oCivic Center CpOrt Beachrive, Newport Bach, CA 92660 Illlfllllllllllllllllllllllllllll�IIIIIIIIIIIIIIIIIIIIIIII Permit Counter Phone (949)644-3311 4 v Online Inspection Request - www.newportbeachca.gov / Online r .z� Services Job Address : 113 VIA SAN REMO NB Description : INSTALL 2 NEW CURB CORES PER STD 184-L. Permit No: N2018-0425- Project No.- 1348-2017 SCANNED Inspection Requests Phone (949)644-3255 Thomas:Guide: 919A1 Parcel # : 4232-460-3 - Legal Desc : TR 907 LOT 188(AND NELY1/2 LOT 187 Owner: AZAR MICHAEL Contractor: MATA'S CONSTRUCTION CO Phone: 949-677-7011 Phone: 714-393-6358 Address : 508 DE ANZA Address : 910 E. 4TH ST CORONA DEL MAR CA 92625 i SANTA ANA CA 92701 Contractor State Lic: 861880. Applicant: MATA'S CONSTRUCTION CO License Expire : 07 31, 2019 Phone: 714-393-6358 [ Address : 910 E. 4TH ST SANTA ANA CA 92701 Business License: BT30015664 Business Expire : 04 30, 2019 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Workers' Compensation Insurance - - Carrier : WESCO INS CO Policy No: WWC3326077 W. C. Expire: 02 01, 2019 Permit Processing Fee : $241.00 Sewer Connection : $0.00 Total Fee $406.00 Agreement Fee: $0.00 4TT Box Cover: $0.00 Paid : $406.00 Traffic control Plan Check : $0.00 Total Water Meters: $0.00 Balance: $0.00 Inspection Fee : $165.00 Water Meter Connection : $0.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Date: _/ / Other Department: Date : _/_/ Utilities Approval : Date : _/ / Permit Denied Date Traffic Approval : Date: _/_/ Issued Permit: J Date General Services Approval : Date : _/_/ COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: DE AILED DESCRIPTION OF PROPOSED_ ORK: or A APPLICANT: Ni a G n 4rc- ; o Phone: -71 c? 3 -6 3 S Email Address: , Mailing Address: I +h 54► r 4 City/State/Zip: CA C4 270 1 OWNER: ; r k e- r o` Phone: Email Address: Mailing Address: City/State/Zip: ALL CONTRACTS O FORMATION IS. E COMPLETE ONTRACTOR:Office f Phone: 6- vt 2 Z ompany (if different): Jobsite Phone: Other Phone: / S a Email Address:au G �� v Mailing Address: III 4 54v^C c.4 City/State/Zip: S� h4 a 4v,,. C el 7 `70 1 State License Number & Class: - Q 6-7-1, C -S)Ex ices: CityBusiness License Number: %3Tuo i 4G Expires: F WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: Municipal Oerations: 949-644-3055 Utilities: 949444-3011 Urban Forestry: 949-644-3083 FOR OFFICE ttSE ONLY Special Conditions of Permit: ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: Municipal Operations Traffic: Fire: Other: Engineering Technician: Permit Sp Date: Permit No. N2018- 6iJJ, f /userslpbw/shared/enaoach/masterstepworksheet.xis j 3q9-2ciG: Public Works Department 949-W-3311 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells Inspection Fee: $241.0 Public Works Field Inspection $275.09 Utilities Field Inspection General Services Inspection Water Quality/Artificial Turf Inspection $817.00 $192.001 Refundable Deposit: $502.001 Improvements Street/Alley/Walk Closure: $65.00Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee 24" x 36" $143.00 4TT Box & Cover Additional _ _ THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE R ( REVENUE DIVISION PRIOR TO PAYMENT OF FEES JA $165.00 $121.00 $165.00 $108.00 TBDBTBD $108.00 $.00 $6464.00 venu--- e Division I IWater Meter: 13/4" Meter $50.25 11" Meter $121.50 11 1/2" Meter $285.00 11 1/2" Turbine Meter $700.00 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 �4" Meter $4,730.00 6" Meter $7,190.00 Installation Charge $528.000 Water Meter Boxes: 1" DFW Meter Box $96.66 e 2" DFW Meter Box $203.24 1 FEES Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street EasementlVacation Fee (+100% of hrly over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Totl Amount Due: For Finance Use Only 4b- �1 is t % Receipt nv. Perm' S ecialist f Iusers/pbw/shared/encroach/masterslep front and tuck masters/ Rev. 12/18/2017 epfeesheet.xis-revised 1118/17 ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a "Letter of Authorization' to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit. is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance. 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability. suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit 3. All work shal! be done in accordance with the approved plans. Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. .Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. S. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed. 8 All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities fie water, sewer, or street lighting conduits) to verify locations. Maintain a one -fool clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed. barricades can be obtained from the City at a charge of $10 00 per barricade per day. with a minimum charge of $35.00 It is the responsibility of the applicant to place barricades to protect the general public Access to fire hydrants must be maintained at all times. 10. Work within or near beach sensitive areas will not be allowed during. City holidays, spring break. Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department 11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit .from the Public Works Department Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH) No nighttime traffic lane closures, unless prior approval has been granted Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit All vehicles shall be lawfully parked 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials. or parking of construction vehicles unless detailed on an attached Temporary Street Closure. 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. 14. Refuse or unused materials shall be. removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way. a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) I certify tht I have a Certificate of consent to solf-irisure, Certificate of Worker's Co ensation Insurance, or a Certified Co t feof. Date 1 .1 1 S' Signature: CERTIFICATE OF EXEMPTION (Sec�00 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisionpof the State Labor Code, I must comply with the provisions of Section 3700z*Ais permit shall be deemed revoked. ,%_ CONTRACTOR LICEW EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroach t Per it In ection is required by calling Public Works at 949-644-33 15 Any above ground utility facilities wi uir clOCUrnted approval from the adjacent affected property owner(s). 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain Felony violations of W.Vor Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill 17 If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted. removed. trimmed, cr relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Pi:blic Vlorks Department or corrections will be required (i.e. removals. exposing c:onw!ctinils. etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processes!. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit shall be performed until the Public Works Department has Issued this permit. Applicant hereby acknowledges he/she has read sAd understands the terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after Issuance. Permit fees are nonrefundable. Dat :�J,w 111_�__ Signature, CONSTRUCTION NOTES: 1Q CONSTRUCT 6" MIN CONCRETE DRIVEWAY Q CONSTRUCT HARDSCAPE PER LANDSCAPE. STD GREY CONCRETE ONLY IN PUBLIC R/W. 3OINSTALL 4" FLAT GRATE DRAIN ® INSTALL 4" ATRIUM GRATE DRAIN 50INSTALL PERFORATED DRAIN/TRENCH PER DETAIL © INSTALL 4" PVC SDR 35 DRAIN LINE, S=0.01 MIN 0 CONSTRUCT 3"0 DRAIN THRU CURB PER CNB STD PLAN 184—L ® INSTALL SUMP PUMP AND 1.5" DISCHARGE LINE PER DETAIL ' 9Q INSTALL 6" CONCRETE DRAIN BOX 10 INSTALL NEW SEWER CLEANOUT PER STD-406—L ON EXISTING SEWER LATERAL. FIELD VERIFY 11 REMOVE EXISTING HARDSCAPE AND PLACE LANDSCAPING PER LANDSCAPE PLANS GENERAL NOTES: A PUBLIC WORKS DEPARTMENT ENCROACHMENT PERMIT INSPECTION IS REQUIRED BEFORE THE BUIDLING DEPTARTMENT PERMIT FINAL CAN BE ISSUED, AT THE TIME OF THE PUBLIC WORKS DEPARTMENT INSPECTION, IF ANY OF THE EXISTING PUBLIC IMPROVEMENTS SURROUNDING THE SITE IS DAMAGED, NEW CONCRETE SIDEWALK, CURB AND GUTTER, AND ALLEY/STREET PAVEMENT WILL BE REQUIRED AND 100% PAID BY THE OWNER. SAID DETERMINATION AND THE EXTENT OF THE REPAIR WORK SHALL BE MADE AT THE DISCRETION OF THE PUBLIC WORKS INSPECTOR. 2. SEPARATE PERMIT FOR FENCES AND WALLS SHALL BE OBTAINED AT THE SAME TIME AS THE BUILDING PERMIT. 3. ALL WORK RELATED TO WASTEWATER IN THE PUBLIC RIGHT -OF- WAY SHALL BE PERFORMED BY A C-42 LICENSED SANITATION SEWER CONTRACTOR OR AN A LICENSED GENERAL ENGINEERING CONTRACTOR. 4. AN ENCROACHMENT AGREEMENT iS REQUIRED FOR ALL IdON-STANDARD IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY. ALL NON-STANDARD IMPROVEMENTS SHALL COMPLY W!TH CITY COUNCIL POLICY L-6 AND L-18 o. ISSUANCE OF A BUILDING PERMIT BY THE CITY OF NEWPORT BEACH DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTYOR TO OBTAiN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY ASSOCIATIONS PRIOR TO COMLIENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT T- �r �!�%F-T ';.'A N i`i�i F'��t 1v~1'�IF\�- 17F7^r�i1Jl7 NIU-5- Mi -R 1 —_R ARM I'� AV'� •� .OP !� T E DO'S rlio-POIJ73 S.HALi:. C!SCHARGE ON7C)) ^_ PLACE GF TO PREVE FROM SIT CONC FF=13.79 ,2% ► EXIST GROUND ----------- - ---- — — — — — — — — — — — — — — - V-":TEMPORARY EXCAVATION I SEC A —A ,.=8. L W I MW in_ .t Cb 3: r- in 1* 00 Ln 0 00 CT:); 000 7� rt 2 a- r) C4 1 ri a- m to Ld (L cl 88.01, rn 2% r------------- - --- 2 tit DSA c)6 "- 0A -r, 'In to 13.54 13.15 DN FS _ _13.54 FS FS A LOT AREA = 3960 SF IMPERVIOUS AREA = 3585 SF 13' 0 2 Lu w z U) > in ty =3 ll 8/21/2018 City of Newport Beach Page 14 of 14 ' k30:07PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 08/22/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 113 VIA SAN REMO Activity : N2018-0425 SubType : NEW Status : APPROVED OWNER: AZAR MICHAEL Phone : 949-677-7011 MIKEAZAR@COX.NET APPLICANT: MATXS CONSTRUCTION CO Phone : 714-393-6358 Descriotion : INSTALL 2 NEW CURB CORES PER STD 184-L. Item: 10200 PRE JOB - PW Requested Time: 8/22/2018 12:00:OOAM Requestor: WEBUSER 7143936358 Entered By: WEBUSER Comments: AM - Assigned to: 77777777777* Inspector: Date: Time: AM PM Comments: F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\I nsoectorSheet.doc REPT131 Run Id: 4018 ' 8/30/2018 6:34:44AM City of Newport Beach Page 8 of 17 INSP160 - Daily Inspection Request Report Requested Inspection Date : 08/30/2018 Inspection Type: ENCROACH Inspection Area : PW Site Address : 113 VIA SAN REMO A/P/D Information: Activity : N2018-0425 SubType : NEW Status : APPROVED OWNER: AZAR MICHAEL Phone : 949-677-7011 MIKEAZAR@COX.NET APPLICANT: MATA'S CONSTRUCTION CO Phone : 714-393-6358 Description : INSTALL 2 NEW CURB CORES PER STD 184-L. Requested Inspection(s) Item: 10100 FORMS WITH COMPACTION - PW Requested Time: 8/30/2018 12:00:OOAM Requester: WEBUSER 7143936358 Entered By: WEBUSER Comments: AM - Assigned to: zzzzzzzzzzz* LOGGED • 9/4/2018 City of Newport Beach Page 7 of 19 4:30:50PM INSP150 - Daily Inspection Request Report Requested Inspection Date : 09/05/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 113 VIA SAN REMO r. Activity : N2018-0425 SubType : NEW Status : APPROVED OWNER: AZAR MICHAEL Phone : 949-677-7011 MIKEAZAR@COX.NET APPLICANT: MATXS CONSTRUCTION CO Phone : 714-393-6358 _ Description : INSTALL 2 NEW CURB CORES PER STD 184-L. Item: 10250 FINAL - PW Requested Time: 9/5/2018 12:00:OOAM Requester: WEBUSER 7143936358 Entered By: WEBUSER Comments: ANY - Assigned to: =77777777* Inspector: Comments: Date: F:\Users\PSW\Shared\ENCROACH\MASTERS\FORMS\InsoectorSheet.doc Time: AM PM REPT131 Run Id: 4018