HomeMy WebLinkAboutX2018-3448 - Miscxa01V3,It18 717 Uct [itrk Or Bellingham 8810 Spading Lane LETTER OF TRANSMITTAL =Shop drawings Dixon, CA 95620 =Plans =Samples =Specifications 8-9 (707)676-2385 COPIES onre doe No PG FAX (707) 678-1760 1 March 14, 2019' =For review and comment The World's Most Comprehena/ve Pile Driving/ Concrete inspection 1 ATTENTION PHONE NUMBER Marine Builder CSL 9442499 1 2/18/19-2/22119 4 Pile Driving/ Concrete inspection. ..........',... .. .. ..... .... ... '2126/19-3/1119 ........ _,_ ... Steven Lane NA ... ....,... 1 <3/21/19 .._.: REFERENOE TO NEWPORT BEACH BUILDING DEPARTMENT Clipper Yacht arbor HConceptual Layouts _....... .......... ...:..................................................,__._: .. NA - ............ ...,... . .:. .: ...... WEARE SENDING YOU ElAttached 510ther DEPUTY INSPECTION REPORTS =Shop drawings =Pnnts =Plans =Samples =Specifications 8-9 =Change order Shipped Via: EMAIL COPIES DATE PG DESCRIPTION 1 2/15/19 =For review and comment 2 Pile Driving/ Concrete inspection 1 2/5/19-2/6/19 3 Pile Driving/ Concrete inspection 1 2/18/19-2/22119 4 Pile Driving/ Concrete inspection. ..........',... .. .. ..... .... ... '2126/19-3/1119 ........ _,_ ... ..... .... ,... 5 .., .. ,..... ... ....... . .. ......, ,,................. .... , „.,... .......... Pile Driving/ Concrete inspection ... ....,... 1 <3/21/19 .._.: . .6 ..... ... Conc.. .... ...... ..,...... . .,........ ,.1.... ...,...,:.. ..�.....:, rete i J/4%LUIaJ/0/LU1Y / mle unving/. Uoricrere inspection 1511/19 8-9 Railing Core Depth and Grout 1. 512/1910-12 Railing cCore Depth and Grout THESE ARE For approval Approved as submitted F—IResubmit _copies for approval FlForyouruse =Approved as notedSubmit _copies for distribution =As requested =Returned for corrections =Return _corrected prints =For review and comment n REMARKS SIGNED CHAD LUCAS, Project Manager - as noted, umdN nonN o: at ono. CC: City of Newport Beach Special Inspector Manual X 2018- 3111/8 711 `; jo pack lir CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Pile Driving/ Concrete Inspection Date (s): 2-15-19 ( ) Periodic (x) Continuous Describe . hisPection, Inducting Location(s): vleek Construction crew installed 4 precast piles in the marina dock G. Piles were jetted followed by _...... .. ...._....... ............. .---- .---- .. ---......-. -------- striking using Pile Co diesel hammer 3032. ....... ........ ......... .....-. ........ ........ .. ......_..................................................... piles were driven to the recommended tip elevation and satisfying the recommended blow count perfoot ............-...-.. ......-. ......... ......... ....I.... .................... strikes. Piles #3 4 6, and 7 on dock G were driven today. .-. ......... .......-. ......-. ......... .... ............ ............. ......-. ......... ........ Mork was performed per the approved plans and geotechnical engineer recommendations. tistrests Made:. I/A Total Inspection Time Ea&Day: Date 12-15-19 a .. . .... ................ ........ .. . .......- .......-. .... .... Hans i8 List All Items Requiring Correction (Include Previously Usted Uncorrecteditems). . ......... ........... .......... _........ ...... ......... .......- ......... ........__.. ...._...... Spedai Inspector Signature:. Date:.. n 2-15-19 d�vi�a cam' Print r -un Name: Newport Beach. Registration No.: artan Deirdeirian NB -0735 Specialln,eationReport 08/25/2015 67 City of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658 www.newportbeachca.gov(949)644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Pile Driving/ Concrete Inspection Date (s): 2-5 and 2-6-19 ( ) Periodic (x) Continuous Desmbe hmpectim, hrdudin Location(s): . Aeek Construction crew installed 6 precast piles in the marina dock G and F. Piles were jetted followed by ................... . . ............ .. ...................... .. .......... ......... ......... ........: triking using Pile Co diesel hammer 3032. iles were driven to the recommended tip elevation and satisfying the recommended blow count per foot ..... ......... ........ ........ ......... .......... trikes. 6 piles were driven this week. Piles #1 and 2 in dock G and #30 51, 53 and 54 in dock F ..... ........ ........ ........ _._........... ....... .... Vork was performed per the approved plans and geotechnical engineer recommendations UstTests Made:. J/A ToWt inspection Tone Each Day: bate 2-5-19 i2-6-19 ..... .............. ................. ....... ................. ..... ....... ......... ........................................... Huurs:. i8 8 List An Items Requiring Correction (Include previously Usted Uncorrected IWms): ....... ................... .................. .... .......... ........ ....... ---- .............. ........................ ....._............ ...... ........... ............ .......................... Speaal hnpectorgVwtore: Date: 2-6-19 Print EuR.Namer - Newport Bich Registration No.: artan Deirdeirian NB -0735 5,.1W1n1,d1.nR,.ft 08/25/2015 67 City of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658 www.newportbeachca.gov (949)644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Pile Driving/ Concrete Inspection Date (s): 2-18 to 2-22-19 ( ) Periodic (x) Continuous Deso*e Inspection, hKkK ngLoration(s): ohn S. Meek pile driving crew installed 13 precast prestressed 16" square piles in the channel road marina )ock G this week Piles were jetted followed by striking the last 3 to 5 using Pile Co 3032 hammer. piles were driven to the recommended tip elevation and satisfying the recommended blow count per foot takes. Piles #5, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, and 20. Nork was performed per the approved plans and geotechnical engineer recommendations List Tests Mader J/A Total inspection. rm Each Day- -D 2-21-19 2-22-19 :.-. ........... .-........ ........ ........ ............---- --- ---- Naas 8 8 8 8 8 List AN Items Requiring Correction (hniude Previously. Listed Uncorrected ttems):. ork will continue next week. Special Inspector Signature: Date: i2-22-19 Print fvB Name: Newport Beach Registration No.: artan Deirdeirian NB -0735 67 City of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Pile Driving/ Concrete Inspection Date (s): 2-26.2-28. and 3-1-19 ( ) Periodic (x) Continuous Dmmbe Inspection, lndutivig Locabw(s)-. John S. Meek pile driving crew installed 13 precast prestressed 16" square piles in the channel road marina __ _. ...-...... ......... .....-..-... ------ - 1111 11111 ........ ......... Dock G this week. Piles were jetted followed by striking the last 3 to 5' using Pile Co 3032 hammer. - -- ......... ......... ........-............... -- - __------.-.-. Piles were driven to the recommended tip elevation and satisfying the recommended blow count per foot ........ ...-...- ------- ------ ...-... .... .......... ......... ......... Strikes. Piles #22, 25, 28 31 36 inclusive,39, 42 45, and 48. ..... ....-...--- ----.-..-.-.. ......... ......... ........ ...................... ...-- ork was performed per the approved plans and geotechnical engineer recommendations List Tests: Made:... I/A ...................... ------- ............ ......... .......... ........... Total Inspection rune Each Day: Date: 12-26-19 2-28-19 3-1-19 ........................................... ........ Hours i8 8 8 list AB Ltems Requiring Correction (Indude Previously Listed Uncorrected Items):. _- _._.-...-.. ................ .......I.... .............. ..-------- �------_ __-_----- --- --- ...--.---.....- ............. Spedal Inspector S rei Date.• 3-1-19 Prim. Full Name:. Newport Beach Registration No.: artan Deirdeirian NB -0735 SpeclallnspedlanR,ort 08/25/2015 67 City of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 17681 Newport Beach, CA 92658 www.newi)ortbeachca.gov 1 (949)644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Concrete Inspection Date (s): 3-21-19 ( ) Periodic (x) Continuous Describe Inspection, Inducting Loration(s):. Rick Hamm concrete crew on site poured concrete into the gangway platform on Channel Road. Reinforcement was completed and approved by the city of Newport Beach. ---- _ _.- .... ..-- -- Concrete was supplied by Robertsons Ready -Mix Concrete mix design #55451-C, 4500 proposed I— ......- ...-. ...... --...... compressive strength. Concrete was tested for slump, temperature, and compression strength. Five -- .. ......... ......... ......... --- ---- - - -.- ....................................... x8 cylinders were cast and set for initial curing. Total of 4 yards of the above mix concrete was poured In the platform. Concrete was consolidated around the reinforcement using a mechanical vibrator. --. ......... .. ... ............ ........................................................... . - ................................... ...... .----------- Work was - orkwas performed perthe approved plans and geotechnical engineer recommendations List rests Made: N/A Total Inspection ToneFacb Day: Dam 3-21-19 ........ .. .......... ........ -- -------- .............. Hours. ,8 List All Items Requiring Correction (Include Previously listed Uncorrected items): To the best of my knowledgge, the work inspected was in accordance with the Buildingg Division approved design drawings, eciFic�ftnne and .—ii—k ,unr4monchin n ,icin c of tha i i R r o ant x n tod.F , Special Inspector signature: .Date: 3-21-19 ,. Pant Full Name: - Newport Beach Registration No.: artan Deirdeirian NB -0735 epenaimspeaiontteport oa,[a,[o1> City of Newport Beach Special Inspector Manual CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: Channel Road Marina Permit Number: M 2018-0068 Inspection Type (s): Pile Driving/ Concrete Inspection Date (s): 3-4 to 3-8-19 ( ) Periodic (x) Continuous <. Desvibe.lolWection, hidudmg Lootion(s):... ohn S. Meek pile driving crew installed 18 precast prestressed 16" square piles in the channel road marina lock F this week. Piles were jetted followed by striking the last 3 to 5' using Pile Co 3032 hammer. iles were driven to the recommended tip elevation and satisfying the recommended blow count per foot trikes. Piles #23, 24, 26, 27, 29, 37, 38, 40, 41, 43, 44, 46 47 49, 50 and 52 — 54 inclusive Vork was performed per the approved plans and geotechnical engineer recommendations. List Tests Made: J/A Total. inspection Tone Each Day. Daze 3-4-19 3-5-19 3-6-19 :3-7-19 :3-8-19 -- - -. .......................................................... Fioum- 18 8 88 8 Special Inspector Signature: Dater 3-8-19 Print Full Name: - Newport Beach Registration No- artan Deirdeirian NB -0735 spenannspemonttepon unjls/nils 67 X2018 - Pit Is 7I"1Grdo park pr Daily Field Report - May 1, 2019 KLFProject# 20193330001A KLE/NFELDER sLlllding Permit #: N12018-0068 �. 9right Nople. Nlght Solutiom by Robert Carman for Channel Road Marina - Newport Beach CoME Client. Lido Peninsula Company, LLC 68°F, Clear Contractor. Bellingham Time Start. 07:00 AM Time Stop: 03:00 PM Equipment: Grout mixer Traveled .5 hrs, 18 mi. Types of Tests/Observations Performed: Documents Referenced: Approved contract documents Observation s/Remarks: On site as requested by Bellingham for grouting of new rating inspection. Observed coring of holes for new railing posts along F & G docks. Verified cleaning of holes prior to mixing of grout. Observed mixing and placement of Sika 212 high performance grout per manufacturers specifications. Observed placement of grout for new rail posts beginning at F dock. I then took 1 set of (3) 2"x2" samples using a brass mold from Kleinfelder for strength testing. - ------------ -------'------------------------------ ---..... - -- - ---- -------------------------- Acknowletlged By Signature Kleinfelder Representative Signature Robert Carman Representing Company Company Name Kleinfelder Representative Print Name 124284 Kleinfelder Laguna Hills 24411 Ridge Route Drive Laguna Hills, CA 92653 Page 1 of 2 DER Daily Field Report - May 1, 2019 KLE/NFEL �. Bright People. fligM1lSoluGons by Robert Carman for Channel Road Marina - Newport Beach COME Photo Log Fig. 1: Fig. 2: Fig. 3: KLF Project #- 20193330-001 A Building Permit #. M20 18-0068 Fig. 4: Acknowledged By Signature Kleinfelder Representative Signature Robert Carman Representing Company Company Name Kleinfelder Representative Print Name lzozeJ Kleinfelder Laguna Hills 24411 Ridge Route Drive Laguna Hills, CA 92653 Page 2 oft Daily Field Report - May 2, 2019 KLPProject# 20193330.001A KLE//VFELDER Building Perri M2018-0068 �. bright Poople. plght5oluNnnt by Robert Carman for Channel Road Marina - Newport Beach CoME Client: Lido Peninsula Company, LLC 68°F, Clear Contractor. Bellingham Time Start: 02:30 PM Time Stop: 04:30 PM Equipment. Grout mixer Traveled .5hrs. 18 mi. Types of Tests/Observations Performed: Documents Referenced: Approved contract documents Observations/Remarks. On site as requested by Bellingham for grouting of new railing inspection. Observed mixing and placement of Sika 212 high performance grout per manufacturers specifications. I then took 1 set of (3) 2"x2" samples using a brass mold from Kleinfelder for strength testing. Grouting at docks D & F. '---------•--ySignature S'i'gn' ---------------------------•--•----- K- -leinfelder - --Representative - --Signature-- -------•------------------ Acknowledged B Robert Carman Representing Company Company Name Kleinfelder Representative Print Name 124680 Neinfaider Laguna Hills 24411 Ridge Route Di Laguna Hills, CA 92653 Page 1 of 2 DER Daily Field Report - May 2, 2019 KLE/NFEL �Bright People. Right Solutions by Robert Cannan for Channel Road Marina -Newport Beach COME Photo Log Fig. 1: Fig. 2: KLF Project #: 20193330.001A Building Permit #: N12018-0088 Acknowledged By Signature Kleinfelder Representative Signature Robert Carman Representing Company Company Name Kleinfelder Representative Print Name fzaeeo Klurfelder Laguna Hills 24411 Ridge Route Drive Laguna Hills, CA 92653 Page 2 of 2